EXELON CORPORATION
|
|
23-2990190 |
|
|
(a Pennsylvania corporation) |
|
|
|
|
10 South Dearborn Street |
|
|
|
|
P.O. Box 805379 |
|
|
|
|
Chicago, Illinois 60680-5379 |
|
|
|
|
(312) 394-7398 |
|
|
333-85496
|
|
EXELON GENERATION COMPANY, LLC
|
|
23-3064219 |
|
|
(a Pennsylvania limited liability company) |
|
|
|
|
300 Exelon Way |
|
|
|
|
Kennett Square, Pennsylvania 19348-2473 |
|
|
|
|
(610) 765-5959 |
|
|
1-1839
|
|
COMMONWEALTH EDISON COMPANY
|
|
36-0938600 |
|
|
(an Illinois corporation) |
|
|
|
|
440 South LaSalle Street |
|
|
|
|
Chicago, Illinois 60605-1028 |
|
|
|
|
(312) 394-4321 |
|
|
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the
filing obligation of the registrant under any of the following provisions:
o Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
o Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
o Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR
240.14d-2(b))
o Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR
240.13e-4(c))
TABLE OF CONTENTS
Section 8 Other Events
Item 8.01 Other Events
On July 24 and 25, 2007, Exelon Corporation (Exelon), Exelon Generation Company, LLC (Generation)
and Commonwealth Edison Company (ComEd) filed current reports on Form 8-K disclosing the material
terms of a settlement agreement to address concerns about higher electric bills in Illinois without
a rate freeze, generation tax or other legislation that would be harmful to consumers of
electricity, electric utilities, generators of electricity and the State of Illinois (the
Settlement). The Settlement will be effective only upon enactment of certain proposed legislation,
House Amendment No. 5 to Senate Bill 1592, which was described in the Form 8-K filed on July 25,
2007. A copy of House Amendment No. 5 to Senate Bill 1592 is attached hereto as Exhibit 99.1. On
July 26, 2007, Senate Bill 1592 was amended by House Amendment No. 6, which makes a technical
correction and adds provisions related to minority and female owned businesses and businesses owned
by persons with disabilities. A copy of House Amendment No. 6 to Senate Bill 1592 is attached
hereto as Exhibit 99.2. On July 26, 2007, Senate Bill 1592 (the Legislation) was passed by both
the Illinois House of Representatives, by votes of 80 votes for, 33 votes against, and 1 voting
present, and the Illinois Senate, by a vote of 40 votes for, 13 votes against, and 1 voting
present. These votes are both in excess of the three-fifths supermajority required for a law to
become effective immediately when passed in an extended session of the Illinois General Assembly.
To be enacted into law, the Legislation must be signed by the Governor of Illinois (the Governor).
The Governor has indicated that he will sign it. However, there can be no assurance that the
Governor will sign the Legislation. The parties to the Settlement have agreed that enactment of
the Legislation will satisfy conditions of the Settlement relating to the enactment of legislation.
* * * * *
This combined Form 8-K is being furnished separately by Exelon, Generation, and ComEd
(Registrants). Information contained herein relating to any individual Registrant has been
furnished by such Registrant on its own behalf. No Registrant makes any representation as to
information relating to any other Registrant.
This Current Report includes forward-looking statements within the meaning of the Private
Securities Litigation Reform Act of 1995, that are subject to risks and uncertainties. The factors
that could cause actual results to differ materially from these forward-looking statements include
those discussed herein as well as those discussed in (1) Exelons 2006 Annual Report on Form 10-K
in (a) ITEM 1A. Risk Factors, (b) ITEM 7. Managements Discussion and Analysis of Financial
Condition and Results of Operations and (c) ITEM 8. Financial Statements and Supplementary Data:
Note 18; (2) Exelons Second Quarter 2007 Quarterly Report on Form 10-Q in (a) Part II, Other
Information, ITEM 1A. Risk Factors and (b) Part I, Financial Information, ITEM 1. Financial
Statements: Note 13; and (3) other factors discussed in filings with the SEC by the Registrants.
Readers are cautioned not to place undue reliance on these forward-looking statements, which apply
only as of the date of this Current Report. None of the Registrants undertakes any obligation to
publicly release any revision to its forward-looking statements to reflect events or circumstances
after the date of this Current Report.
Section 9 Financial Statements and Exhibits
Item 9.01. Financial Statements and Exhibits.
|
|
|
Exhibit No. |
|
Description |
99.1
|
|
House Amendment No. 5 to Senate Bill 1592 |
99.2
|
|
House Amendment No. 6 to Senate Bill 1592 |
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, each Registrant has duly
caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
|
|
|
|
|
EXELON CORPORATION |
|
|
EXELON GENERATION COMPANY, LLC |
|
|
|
|
|
/s/ John F. Young |
|
|
|
|
|
John F. Young |
|
|
Executive Vice President, Finance and Markets |
|
|
and Chief Financial Officer |
|
|
Exelon Corporation |
|
|
|
|
|
COMMONWEALTH EDISON COMPANY |
|
|
|
|
|
/s/ Robert K. McDonald |
|
|
|
|
|
Robert K. McDonald |
|
|
Senior Vice President, Chief Financial Officer, |
|
|
Treasurer and Chief Risk Officer |
|
|
Commonwealth Edison Company |
July 27, 2007 |
|
|
EXHIBIT INDEX
|
|
|
Exhibit No. |
|
Description |
99.1
|
|
House Amendment No. 5 to Senate Bill 1592 |
99.2
|
|
House Amendment No. 6 to Senate Bill 1592 |
exv99w1
Exhibit 99.1
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
09500SBl592ham005
|
|
LRB095 11114 MJR 38234 a |
AMENDMENT TO SENATE BILL 1592
AMENDMENT NO. . Amend Senate Bill 1592 by replacing
everything after the enacting clause with the following:
ARTICLE 1
Section 1-1. Short title. This Article may be cited as the Illinois Power
Agency Act. References in this Article to this Act mean this Article.
Section 1-5. Legislative declarations and findings. The General Assembly finds and
declares:
(1) The health, welfare, and prosperity of all Illinois citizens require the
provision of adequate, reliable, affordable, efficient, and environmentally sustainable
electric service at the lowest total cost over time, taking into account any benefits of
price stability.
(2) The transition to retail competition is not
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 2 -
|
|
LRB095 11114 MJR 38234 a |
complete. Some customers, especially residential and small commercial customers,
have failed to benefit from lower electricity costs from retail and wholesale
competition.
(3) Escalating prices for electricity in Illinois pose a serious threat to the
economic well-being, health, and safety of the residents of and the commerce and
industry of the State.
(4) To protect against this threat to economic well-being, health, and safety it is
necessary to improve the process of procuring electricity to serve Illinois residents, to
promote investment in energy efficiency and demand-response measures, and to support
development of clean coal technologies and renewable resources.
(5) Procuring a diverse electricity supply portfolio will ensure the lowest total
cost over time for adequate, reliable, efficient, and environmentally sustainable
electric service.
(6) Including cost-effective renewable resources in that portfolio will reduce
long-term direct and indirect costs to consumers by decreasing environmental impacts and
by avoiding or delaying the need for new generation, transmission, and distribution
infrastructure.
(7) Energy efficiency, demand-response measures, and renewable energy are resources
currently underused in Illinois .
The General Assembly therefore finds that it is necessary
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 3 -
|
|
LRB095 11114 MJR 38234 a |
to create the Illinois Power Agency and that the goals and objectives of that
Agency are to accomplish each of the following:
(A) Develop electricity procurement plans to ensure adequate, reliable, affordable,
efficient, and environmentally sustainable electric service at the lowest total cost over
time, taking into account any benefits of price stability, for electric utilities that on
December 31, 2005 provided electric service to at least 100,000 customers in Illinois.
The procurement plan shall be
updated on an annual basis and shall include renewable energy resources
sufficient to achieve the standards specified in this Act.
(B) Conduct competitive procurement processes to procure the supply resources
identified in the procurement plan.
(C) Develop electric generation and co-generation facilities that use
indigenous coal or renewable resources, or both, financed with bonds issued by
the Illinois Finance Authority.
(D) Supply electricity from the Agencys facilities at cost to one or more of the
following: municipal electric systems, governmental aggregators, or rural electric
cooperatives in Illinois.
Section 1-10. Definitions.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 4 -
|
|
LRB095 11114 MJR 38234 a |
Agency means the Illinois Power Agency.
Agency loan agreement means any agreement pursuant to which the Illinois Finance
Authority agrees to loan the proceeds of revenue bonds issued with respect to a project to the
Agency upon terms providing for loan repayment installments at least sufficient to pay when
due all principal of, interest and premium, if any, on those revenue bonds, and providing for
maintenance, insurance, and other matters in respect of the project.
Authority means the Illinois Finance Authority.
Commission means the Illinois Commerce Commission.
Costs incurred in connection with the development and construction of a
facility means:
(1) the cost of acquisition of all real property and
improvements in connection therewith and equipment and
other property, rights, and easements acquired that are
deemed necessary for the operation and maintenance of the facility;
(2) financing costs with respect to bonds, notes, and other evidences of
indebtedness of the Agency;
(3) all origination, commitment, utilization, facility, placement,
underwriting, syndication, credit enhancement, and rating agency fees;
(4) engineering, design, procurement, consulting, legal, accounting, title
insurance, survey, appraisal, escrow, trustee, collateral agency, interest rate hedging,
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 5 -
|
|
LRB095 11114 MJR 38234 a |
interest rate swap, capitalized interest and other financing costs,
and other expenses for professional services; and
(5) the costs of plans, specifications, site study and investigation, installation,
surveys, other Agency costs
and estimates of costs, and other expenses necessary or incidental to determining the
feasibility of any project, together with such other expenses as may be necessary or
incidental to the financing, insuring, acquisition, and construction of a specific
project and placing that project in operation.
Department means the Department of Commerce and Economic Opportunity.
Director means the Director of the Illinois Power Agency. Demand-response means
measures that decrease peak
electricity demand or shift demand from peak to off-peak
periods.
Energy efficiency means measures that reduce the amount
of electricity required to achieve a given end use.
Electric utility has the same definition as found in
Section 16-102 of the Public Utilities Act.
Facility means an electric generating unit or a co-generating unit that
produces electricity along with related equipment necessary to connect the facility
to an electric transmission or distribution system.
Governmental aggregator means one or more units of local
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 6 -
|
|
LRB095 11114 MJR 38234 a |
government that individually or collectively procure electricity to serve
residential retail electrical loads located within its or their jurisdiction.
Local government means a unit of local government as defined in Article VII of
Section 1 of the Illinois Constitution.
Municipality means a city, village, or incorporated town.
Person means any natural person, firm, partnership, corporation, either domestic or
foreign, company, association, limited liability company, joint stock company, or association
and includes any trustee, receiver, assignee, or personal representative thereof.
Project means the planning, bidding, and construction of a facility.
Public utility has the same definition as found in Section 3-105 of the Public
Utilities Act.
Real property means any interest in land together with all structures, fixtures, and
improvements thereon, including lands under water and riparian rights, any easements,
covenants, licenses, leases, rights-of-way, uses, and other interests, together with any
liens, judgments, mortgages, or other claims or security interests related to real property.
Renewable energy credit means a tradable credit that represents the environmental
attributes of a certain amount of energy produced from a renewable energy resource.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 7 -
|
|
LRB095 11114 MJR 38234 a |
Renewable energy resources includes energy and its associated renewable energy
credit or renewable energy credits from wind, solar thermal energy, photovoltaic cells and
panels, biodiesel, crops and untreated and unadulterated organic waste biomass, trees and tree
trimmings, hydropower that does not involve new construction or significant expansion of
hydropower dams, and other alternative sources of environmentally preferable energy. For
purposes of this Act, landfill gas produced in the State is considered a renewable energy
resource. Renewable energy resources does not include the incineration, burning, or heating
of tires, garbage, general household, institutional, and commercial waste, industrial
lunchroom or office waste, landscape waste other than trees and tree trimmings, railroad
crossties, utility poles, and construction or demolition debris, other than untreated and
unadulterated waste wood.
Revenue bond means any bond, note, or other evidence of indebtedness issued by the
Authority, the principal and interest of which is payable solely from revenues or income
derived from any project or activity of the Agency.
Total resource cost test or TRC test means a standard that is met if, for an
investment in energy efficiency or demand-response measures, the benefit-cost ratio is greater
than one. The benefit-cost ratio is the ratio of the net present value of the total benefits
of the program to the net present value of the total costs as calculated over the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 8 -
|
|
LRB095 11114 MJR 38234 a |
lifetime of the measures. A total resource cost test compares the sum of avoided electric
utility costs, representing the
benefits that accrue to the system and the participant in the delivery of those efficiency
measures, to the sum of all incremental costs of end-use measures that are implemented due to
the program (including both utility and participant contributions), plus costs to administer,
deliver, and evaluate each demand-side program, to quantify the net savings obtained by
substituting the demand-side program for supply resources. In calculating avoided costs of
power and energy that an electric utility would otherwise have had to acquire, reasonable
estimates shall be included of financial costs likely to be imposed by future regulations and
legislation on emissions of greenhouse gases.
Section 1-15. Illinois Power Agency.
(a) For the purpose of effectuating the policy declared in Section 1-5 of this Act, a
State agency known as the Illinois Power Agency is created. The Agency shall exercise
governmental and public powers, be perpetual in duration, and have the powers and duties
enumerated in this Act, together with such others conferred upon it by law.
(b) The Agency is not created or organized, and its operations shall not be conducted,
for the purpose of making a profit. No part of the revenues or assets of the Agency shall
inure to the benefit of or be distributable to any of its
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 9 -
|
|
LRB095 11114 MJR 38234 a |
employees or any other private persons, except as provided in this Act for actual
services rendered.
Section 1-20. General powers of the Agency.
(a) The Agency is authorized to do each of the following:
(1) Develop electricity procurement plans to ensure adequate, reliable, affordable,
efficient, and environmentally sustainable electric service at the lowest total cost
over time, taking into account any benefits of
price stability, for electric utilities that on December 31, 2005 provided electric
service to at least 100,000 customers in Illinois. The procurement plans shall be
updated on an annual basis and shall include electricity generated from renewable
resources sufficient to achieve the standards specified in this Act.
(2) Conduct competitive procurement processes to procure the supply resources
identified in the procurement plan, pursuant to Section 16-111.5 of the Public Utilities
Act.
(3) Develop electric generation and co-generation facilities that use
indigenous coal or renewable resources, or both, financed with bonds issued by
the Illinois Finance Authority.
(4) Supply electricity from the Agencys facilities at cost to one or more of the
following: municipal electric systems, governmental aggregators, or rural electric
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 10 -
|
|
LRB095 11114 MJR 38234 a |
cooperatives in Illinois.
(b) Except as otherwise limited by this Act, the Agency has all of the powers necessary
or convenient to carry out the purposes and provisions of this Act, including without
limitation, each of the following:
(1) To have a corporate seal, and to alter that seal at pleasure, and to use it by
causing it or a facsimile to be affixed or impressed or reproduced in any other manner.
(2) To use the services of the Illinois Finance Authority necessary to carry
out the Agencys purposes.
(3) To negotiate and enter into loan agreements and other agreements with the
Illinois Finance Authority.
(4) To obtain and employ personnel and hire consultants that are necessary to
fulfill the Agencys purposes, and to
make expenditures for that purpose within the appropriations
for that purpose.
(5) To purchase, receive, take by grant, gift, devise, bequest, or otherwise, lease,
or otherwise acquire, own, hold, improve, employ, use, and otherwise deal in and with,
real or personal property whether tangible or intangible, or any interest therein, within
the State.
(6) To acquire real or personal property, whether tangible or intangible,
including without limitation property rights, interests in property, franchises,
obligations, contracts, and debt and equity securities,
and to do so by the exercise of the power of eminent domain
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 11 -
|
|
LRB095 11114 MJR 38234 a |
in accordance with Section 1-21; except that any real property acquired by the exercise
of the power of eminent domain must be located within the State.
(7) To sell, convey, lease, exchange, transfer, abandon, or otherwise dispose of, or
mortgage, pledge, or create a security interest in, any of its assets, properties, or any
interest therein, wherever situated.
(8) To purchase, take, receive, subscribe for, or otherwise acquire, hold, make a
tender offer for, vote, employ, sell, lend, lease, exchange, transfer, or otherwise
dispose of, mortgage, pledge, or grant a security interest in, use, and otherwise deal in
and with, bonds and other obligations, shares, or other securities (or interests therein)
issued by others, whether engaged in a similar or different business or activity.
(9) To make and execute agreements, contracts, and other instruments necessary or
convenient in the exercise of the powers and functions of the Agency under this Act,
including contracts with any person, local government, State agency, or other entity; and
all State agencies and all local governments are authorized to enter into and do all
things necessary to perform any such agreement, contract, or other instrument with the
Agency. No such agreement, contract, or other instrument shall exceed 40 years.
(10) To lend money, invest and reinvest its funds in
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 12 -
|
|
LRB095 11114 MJR 38234 a |
accordance with the Public Funds Investment Act, and take and hold real and
personal property as security for the payment of funds loaned or invested.
(11) To borrow money at such rate or rates of interest as the Agency may determine,
issue its notes, bonds, or other obligations to evidence that indebtedness, and secure
any of its obligations by mortgage or pledge of its real or personal property, machinery,
equipment, structures, fixtures, inventories, revenues, grants, and other funds as
provided or any interest therein, wherever situated.
(12) To enter into agreements with the Illinois Finance Authority to issue bonds
whether or not the income therefrom is exempt from federal taxation.
(13) To procure insurance against any loss in connection with its properties or
operations in such amount or amounts and from such insurers, including the federal
government, as it may deem necessary or desirable, and to pay any premiums therefor.
(14) To negotiate and enter into agreements with trustees or receivers appointed
by United States bankruptcy courts or federal district courts or in other
proceedings involving adjustment of debts and authorize proceedings involving
adjustment of debts and authorize legal counsel for the Agency to appear in any such
proceedings.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 13 -
|
|
LRB095 11114 MJR 38234 a |
(15) To file a petition under Chapter 9 of Title 11 of the United States Bankruptcy
Code or take other similar action for the adjustment of its debts.
(16) To enter into management agreements for the operation of any of the property or
facilities owned by the Agency.
(17) To enter into an agreement to transfer and to transfer any land, facilities,
fixtures, or equipment of the Agency to one or more municipal electric systems,
governmental aggregators, or rural electric agencies or cooperatives, for such
consideration and upon such terms as the Agency may determine to be in the best interest
of the citizens of Illinois.
(18) To enter upon any lands and within any building whenever in its judgment it may
be necessary for the purpose of making surveys and examinations to accomplish any purpose
authorized by this Act.
(19) To maintain an office or offices at such place or places in the State as
it may determine.
(20) To request information, and to make any inquiry, investigation, survey,
or study that the Agency may deem necessary to enable it effectively to carry out the
provisions of this Act.
(21) To accept and expend appropriations.
(22) To engage in any activity or operation that is incidental to and in
furtherance of efficient operation to
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 14 -
|
|
LRB095 11114 MJR 38234 a |
accomplish the Agencys purposes.
(23) To adopt, revise, amend, and repeal rules with respect to its operations,
properties, and facilities as may be necessary or convenient to carry out the purposes of
this Act, subject to the provisions of the Illinois Administrative Procedure Act and
Sections 1-22 and 1-35 of this Act.
(24) To establish and collect charges and fees as described in this Act.
Section 1-21. Eminent domain. The Agency may take and acquire possession by eminent
domain of any property or interest in property that the Agency is authorized to acquire under
this Act for the construction, maintenance, or operation of a facility with the consent in
writing of the Governor, after following the provisions of Section 1-85 (a) of this Act, to
acquire by private purchase, or by condemnation in the manner provided for the exercise of the
power of eminent domain under the Eminent Domain Act. The power of condemnation shall be
exercised, however, solely for the purposes of one or more of the following: siting, rights of
way, and easements appurtenant. The Agency shall not exercise its powers of condemnation until
it has used reasonable good faith efforts to acquire the property before filing a petition for
condemnation and may thereafter use those powers when it determines that the condemnation of
the property rights is necessary to avoid
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 15 -
|
|
LRB095 11114 MJR 38234 a |
unreasonable delay or economic hardship to the progress of
activities carried out in the exercise of powers granted under this Act. Before use of the
power of condemnation for projects, the Agency shall hold a public hearing to receive comments
on the exercise of the power of condemnation. The Agency shall use the information received at
the hearing in making its final decision on the exercise of the power of condemnation. The
hearing shall be held in a location reasonably accessible to the public interested in the
decision. The Agency shall promulgate guidelines for the conduct of the hearing. The Agency
shall conduct a feasibility study showing that the taking is necessary to accomplish the
purposes of this Act and that is adequate to meet the environmental standards set forth by the
State and the federal governments. The Agency may not exercise the authority provided in
Article 20 of the Eminent Domain Act (quick-take procedure) providing for immediate possession
in those proceedings. The Agency does not have the power to exercise eminent domain over the
property of any public utility or any person owning an electric generating plant.
Section 1-22. Authority of the Illinois Commerce Commission. Nothing in this Act
infringes upon the authority granted to the Commission.
Section 1-25. Agency subject to other laws. Unless
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 16 -
|
|
LRB095 11114 MJR 38234 a |
otherwise stated, the Agency is subject to the provisions of all applicable laws, including
but not limited to, each of the following:
(1) The State Records Act.
(2) The Illinois Procurement Code.
(3) The Freedom of Information Act.
(4) The State Property Control Act.
(5) The Personnel Code.
(6) The State Officials and Employees Ethics Act.
Section 1-30.1. Administrative Procedure Act applies. The provisions of the Illinois
Administrative Procedure Act are expressly adopted and incorporated into this Act, and apply
to all administrative rules and procedures of the Agency.
Section 1-30.2. Administrative Review Law applies. Any final administrative decision of
the Agency, or of the Director of the Agency, that is not subject to review by the Commission,
is subject to review under the provisions of the Administrative Review Law.
Section 1-30.3. Illinois State Auditing Act applies. For purposes of the Illinois State
Auditing Act, the Agency is a State agency within the meaning of the Act and is subject to
the jurisdiction of the Auditor General.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 17 -
|
|
LRB095 11114 MJR 38234 a |
Section 1-35. Agency rules. The Agency shall adopt rules as may be necessary and
appropriate for the operation of the Agency. In addition to other rules relevant to the
operation of the Agency, the Agency shall adopt rules that accomplish each of the following:
(1) Establish procedures for monitoring the administration of any contract
administered directly or indirectly by the Agency; except that the procedures shall not
extend to executed contracts between electric utilities and their suppliers.
(2) Establish procedures for the recovery of costs incurred in connection with the
development and construction of a facility should the Agency cancel a project, provided
that no such costs shall be passed on to public utilities or their customers or paid from
the Illinois Power Agency Operations Fund.
(3) Implement accounting rules and a system of accounts, in accordance with State
law, permitting all reporting (i) required by the State, (ii) required under this Act,
(iii) required by the Authority, or (iv) required under the Public Utilities Act.
The Agency shall not adopt any rules that infringe upon the authority granted to the
Commission.
Section 1-40. Illinois Power Agency Operations Fund.
(a) The Illinois Power Agency Operations Fund is created as
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 18 -
|
|
LRB095 11114 MJR 38234 a |
a special fund in the State treasury.
(b) The Illinois Power Agency Operations Fund shall be administered by the
Agency for the Agencys operations as specified in this Section.
(c) All moneys used by the Agency from the Illinois Power Agency Operations Fund are
subject to appropriation by the General Assembly.
(d) All disbursements from the Illinois Power Agency Operations Fund shall be made only
upon warrants of the State Comptroller drawn upon the State Treasurer as custodian of the Fund
upon vouchers signed by the Director or by the person or persons designated by the Director
for that purpose. The Comptroller is authorized to draw the warrant upon vouchers so signed.
The State Treasurer shall accept all warrants so signed and shall be released from liability
for all payments made on those warrants.
Section 1-45. Illinois Power Agency Facilities Fund.
(a) The Illinois Power Agency Facilities Fund is created as a special fund in the State
treasury.
(b) The Illinois Power Agency Facilities Fund shall be administered by the Agency for
costs incurred in connection
with the development and construction of a facility by the Agency as well as costs
incurred in connection with the operation and maintenance of an Agency facility.
(c) All moneys used by the Agency from the Illinois Power
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 19 -
|
|
LRB095 11114 MJR 38234 a |
Agency Facilities Fund are subject to appropriation by the General Assembly.
(d) All disbursements from the Illinois Power Agency Facilities Fund shall be made only
upon warrants of the State Comptroller drawn upon the State Treasurer as custodian of the Fund
upon vouchers signed by the Director or by the person or persons designated by the Director
for that purpose. The Comptroller is authorized to draw the warrant upon vouchers so signed.
The State Treasurer shall accept all warrants so signed and shall be released from liability
for all payments made on those warrants.
Section 1-50. Illinois Power Agency Debt Service Fund.
(a) The Illinois Power Agency Debt Service Fund is created as a special fund in the
State treasury.
(b) The Illinois Power Agency Debt Service Fund shall be administered by the
Agency for retirement of revenue bonds issued for any Agency facility.
Section 1-55. Operations Funding. The Agency shall adopt rules regarding charges and fees
it is expressly authorized to collect in order to fund the operations of the Agency. These
charges and fees shall be deposited into the Illinois Power Agency Operations Fund.
Section 1-57. Facility financing.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 20 -
|
|
LRB095 11114 MJR 38234 a |
(a) The Agency shall have the power (1) to borrow from the Authority, through one
or more Agency loan agreements, the net proceeds of revenue bonds for costs incurred in
connection with the development and construction of a facility, provided that the stated
maturity date of any of those revenue bonds shall not exceed 40 years from their respective
issuance dates, (2) to accept prepayments from purchasers of electric energy from a project
and to apply the same to costs incurred in connection with the development and construction of
a facility, subject to any obligation to refund the same under the circumstances specified in
the purchasers contract for the purchase and sale of electric energy from that project, (3)
to enter into leases or similar arrangements to finance the property constituting a part of a
project and associated costs incurred in connection with the development and construction of a
facility, provided that the term of any such lease or similar arrangement shall not exceed 40
years from its inception, and (4) to enter into agreements for the sale of revenue bonds that
bear interest at a rate or rates not exceeding the maximum rate permitted by the Bond
Authorization Act. All Agency loan agreements shall include terms making the obligations
thereunder subject to redemption before maturity.
(b) The Agency may from time to time engage the services of the Authority, attorneys,
appraisers, architects, engineers, accountants, credit analysts, bond underwriters, bond
trustees, credit enhancement providers, and other financial
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 21 -
|
|
LRB095 11114 MJR 38234 a |
professionals and consultants, if the Agency deems it advisable.
(c) The Agency may pledge, as security for the payment of its revenue bonds in respect of
a project, (1) revenues derived from the operation of the project in part or whole, (2) the
real and personal property, machinery, equipment, structures, fixtures, and inventories
directly associated with the project, (3) grants or other revenues or taxes expected to be
received by the Agency directly linked to the project, (4) payments to be made by another
governmental unit or other entity pursuant to a service, user, or other similar agreement with
that governmental unit or other entity that is a result of the project, (5) any other revenues
or moneys deposited or to be deposited directly linked to the project, (6) all design,
engineering, procurement, construction, installation, management, and operation agreements
associated with the project, (7) any reserve or debt service funds created under the
agreements governing the indebtedness, (8) the Illinois Power Agency Facilities Fund or the
Illinois Power Agency Debt Service Fund, or (9) any combination thereof. Any such pledge shall
be authorized in a writing, signed by the Director of the Agency, and then signed by the
Governor of Illinois. At no time shall the funds contained in the Illinois Power Agency Trust
Fund be pledged or used in any way to pay for the indebtedness of the Agency. The Director
shall not authorize the issuance or grant of any pledge until he or she has certified that any
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 22 -
|
|
LRB095 11114 MJR 38234 a |
associated project is in full compliance with Sections 1-85 and 1-86 of this Act. The
certification shall be duly attached or referenced in the agreements reflecting the pledge.
Any such pledge made by the Agency shall be valid and binding from the time the pledge is
made. The revenues, property, or funds that are pledged and thereafter received by the Agency
shall immediately be subject to the lien of the pledge without any physical delivery thereof
or further act; and, subject only to the provisions of prior liens, the lien of the pledge
shall be valid and binding as against all parties having claims of any kind in tort, contract,
or otherwise against the Agency irrespective of whether the parties have notice thereof. All
bonds issued on behalf of the Agency must be issued by the Authority and must be revenue
bonds. These revenue bonds may be taxable or tax-exempt.
(d) All indebtedness issued by or on behalf of the Agency, including, without limitation,
any revenue bonds issued by the Authority on behalf of the Agency, shall not be a debt of the
State, the Authority, any political subdivision thereof (other than the Agency to the extent
provided in agreements governing the indebtedness), any local government, any governmental
aggregator as defined in the this Act, or any local government, and none of the State, the
Authority, any political subdivision thereof (other than the Agency to the extent provided in
agreements governing the indebtedness), any local government, or any government aggregator
shall be liable thereon. Neither
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 23 -
|
|
LRB095 11114 MJR 38234 a |
the Authority nor the Agency shall have the power to pledge the credit, the revenues, or
the taxing power of the State, any political subdivision thereof (other than the Agency), any
governmental aggregator, or of any local government, and neither the credit, the revenues, nor
the taxing power of the State, any political subdivision thereof (other than the Agency), any
governmental aggregator, or any local government shall be, or shall be deemed to be, pledged
to the payment of any revenue bonds, notes, or other obligations of the Agency. In addition,
the agreements governing any issue of indebtedness shall provide that all holders of that
indebtedness, by virtue of their acquisition thereof, have agreed to waive and release all
claims and causes of action against the State of Illinois in respect of the indebtedness or
any project associated therewith based on any theory of law. However, the waiver shall not
prohibit the holders of indebtedness issued on behalf of the Agency from filing any cause of
action against or recovering damages from the Agency, recovering from any property or funds
pledged to secure the indebtedness, or
recovering from any property or funds to which the Agency holds title, provided the property
or funds are directly associated with the project for which the indebtedness was specifically
issued. Each evidence of indebtedness of the Agency, including the revenue bonds issued by the
Authority on behalf of the Agency, shall contain a clear and explicit statement of the
provisions of this Section.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 24 -
|
|
LRB095 11114 MJR 38234 a |
(e) The Agency may from time to time enter into an agreement or agreements to
defease indebtedness issued on its behalf or to refund, at maturity, at a redemption date or
in advance of either, any indebtedness issued on its behalf or pursuant to redemption
provisions or at any time before maturity. All such refunding indebtedness shall be subject to
the requirements set forth in subsections (a), (c), and (d) of this Section. No revenue bonds
issued to refund or advance refund revenue bonds issued under this Section may mature later
than the longest maturity date of the series of bonds being refunded. After the aggregate
original principal amount of revenue bonds authorized in this Section has been issued, the
payment of any principal amount of those revenue bonds does not authorize the issuance of
additional revenue bonds (except refunding revenue bonds).
(f) If the Agency fails to pay the principal of, interest, or premium, if any, on any
indebtedness as the same becomes due, a civil action to compel payment may be instituted in
the appropriate circuit court by the holder or holders of the indebtedness on which the
default of payment exists or by any administrative agent, collateral agent, or indenture
trustee acting on behalf of those holders. Delivery of a summons and a copy of the complaint
to the Director of the Agency shall constitute sufficient service to give the circuit court
jurisdiction over the subject matter of the suit and jurisdiction over the Agency and its
officers named as
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 25 -
|
|
LRB095 11114 MJR 38234 a |
defendants for the purpose of compelling that payment. Any case, controversy, or cause of
action concerning the validity of this Act shall relate to the revenue of the Agency. Any such
claims and related proceedings are subject in all respects to the provisions of subsection (d)
of this Section. The State of Illinois shall not be liable or in any other way financially
responsible for any indebtedness issued by or on behalf of the Agency or the performance or
non-performance of any covenants associated with any such indebtedness. The foregoing
statement shall not prohibit the holders of any indebtedness issued on behalf of the Agency
from filing any cause of action against or recovering damages from the Agency recovering from
any property pledged to secure that indebtedness or recovering from any property or funds to
which the Agency holds title provided such property or funds are directly associated with the
project for which the indebtedness is specifically issued.
(g) Upon each delivery of the revenue bonds authorized to be issued by the Authority
under this Act, the Agency shall compute and certify to the State Comptroller the total amount
of principal of and interest on the Agency loan agreement supporting the revenue bonds issued
that will be payable in order to retire those revenue bonds and the amount of principal of and
interest on the Agency loan agreement that will be payable on each payment date during the
then current and each succeeding fiscal year. As soon as possible after the first day of each
month, beginning on the date set forth in the Agency
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 26 -
|
|
LRB095 11114 MJR 38234 a |
loan agreement where that date specifies when the Agency shall begin setting aside
revenues and other moneys for repayment of
the revenue bonds per the agreed to schedule, the Agency shall certify to the Comptroller and
the Comptroller shall order transferred and the Treasurer shall transfer from the Illinois
Power Agency Facilities Fund to the Illinois Power Agency Debt Service Fund for each month
remaining in the State fiscal year a sum of money, appropriated for that purpose, equal to the
result of the amount of principal of and interest on those revenue bonds payable on the next
payment date divided by the number of full calendar months between the date of those revenue
bonds, and the first such payment date, and thereafter divided by the number of months between
each succeeding payment date after the first. The Comptroller is authorized and directed to
draw warrants on the State Treasurer from the Illinois Power Agency Facilities Fund and the
Illinois Power Agency Debt Service Fund for the amount of all payments of principal and
interest on the Agency loan agreement relating to the Authority revenue bonds issued under
this Act. The State Treasurer or the State Comptroller shall deposit or cause to be deposited
any amount of grants or other revenues expected to be received by the Agency that the Agency
has pledged to the payment of revenue bonds directly into the Illinois Power Agency Debt
Service Fund.
Section 1-60. Moneys made available by private or public
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 27 -
|
|
LRB095 11114 MJR 38234 a |
entities.
(a) The Agency may apply for, receive, expend, allocate, or disburse funds and moneys
made available by public or private entities, including, but not limited to, contracts,
private or public financial gifts, bequests, grants, or donations from individuals,
corporations, foundations, or public or private institutions of higher learning. All funds
received by the Agency from these sources shall be deposited:
(1) into the Illinois Power Agency Operations Fund, if
for general Agency operations, to be held by the State Treasurer as ex
officio custodian, and subject to the Comptroller-Treasurer, voucher-warrant
system; or
(2) into the Illinois Power Agency Facilities Fund, if for costs incurred in connection
with the development and construction of a facility by the Agency, to be held by the State
Treasurer as ex officio custodian, and subject to the Comptroller-Treasurer, voucher-warrant
system. Any funds received, expended, allocated, or disbursed shall be expended by the Agency
for the purposes as indicated by the grantor, donor, or, in the case of funds or moneys given
or donated for no specific purposes, for any purpose deemed appropriate by the Director in
administering the responsibilities of the Agency as set forth in this Act.
Section 1-65. Appropriations for operations.
(a) The General Assembly may appropriate moneys from the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 28 -
|
|
LRB095 11114 MJR 38234 a |
General Revenue Fund for the operation of the Illinois Power Agency in Fiscal Year 2008
not to exceed $1,250,000 and in Fiscal Year 2009 not to exceed $1,500,000. These appropriated
funds shall constitute an advance that the Agency shall repay without interest to the State in
Fiscal Year 2010 and in Fiscal Year 2011. Beginning with Fiscal Year 2010, the operation of
the Agency shall be funded solely from moneys in the Illinois Power Agency Operations Fund
with no liability or obligation imposed on the State by those operations.
Section 1-70. Agency officials.
(a) The Agency shall have a Director who meets the qualifications specified
in Section 5-222 of the Civil Administrative Code of Illinois (20 ILCS 5/5-222).
(b) Within the Illinois Power Agency, the Agency shall establish a Planning and
Procurement Bureau and a Resource
Development Bureau. Each Bureau shall report to the Director.
(c) The Chief of the Planning and Procurement Bureau shall be appointed by the Director
and (i) shall have at least 10 years of direct experience in electricity supply planning and
procurement and (ii) shall also hold an advanced degree in risk management, law, business, or
a related field.
(d) The Chief of the Resource Development Bureau shall be appointed by the Director and
(i) shall have at least 10 years of direct experience in electric generating project
development and (ii) shall also hold an advanced degree in
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 29 -
|
|
LRB095 11114 MJR 38234 a |
economics, engineering, law, business, or a related field.
(e) The Director shall receive an annual salary of $100,000 or as set by the Compensation
Review Board, whichever is higher. The Bureau Chiefs shall each receive an annual salary of
$85,000 or as set by the Compensation Review Board, whichever is higher.
(f) The Director and Bureau Chiefs shall not, for 2 years prior to appointment or for 2
years after he or she leaves his or her position, be employed by an electric utility,
independent power producer, power marketer, or alternative retail electric supplier regulated
by the Commission or the Federal Energy Regulatory Commission.
(g) The Director and Bureau Chiefs are prohibited from: (i) owning, directly or
indirectly, 5% or more of the voting capital stock of an electric utility, independent power
producer, power marketer, or alternative retail electric supplier; (ii) being in any chain of
successive ownership of 5% or more of the voting capital stock of any electric utility,
independent power producer, power marketer, or alternative retail electric supplier; (iii)
receiving any form of compensation, fee, payment, or other consideration from an electric
utility, independent power producer, power marketer, or alternative retail electric supplier,
including legal fees,
consulting fees, bonuses, or other sums. These limitations do not apply to any
compensation received pursuant to a defined benefit plan or other form of deferred
compensation, provided
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 30 -
|
|
LRB095 11114 MJR 38234 a |
that the individual has otherwise severed all ties to the utility, power producer, power
marketer, or alternative retail electric supplier.
Section 1-75. Planning and Procurement Bureau. The Planning and Procurement Bureau has
the following duties and responsibilities:
(a) The Planning and Procurement Bureau shall each year, beginning in 2008, develop
procurement plans and conduct competitive procurement processes in accordance with the
requirements of Section 16-111.5 of the Public Utilities Act for the eligible retail
customers of electric utilities that on December 31, 2005 provided electric service to at
least 100,000 customers in Illinois. For the purposes of this Section, the term eligible
retail customers has the same definition as found in Section 16-111.5(a) of the Public
Utilities Act.
(1) The Agency shall each year, beginning in 2008, as needed, issue a request
for qualifications for experts or expert consulting firms to develop the
procurement plans in accordance with Section 16-111.5 of the Public Utilities Act.
In order to qualify an expert or expert consulting firm must have:
(A) direct previous experience assembling large-scale power supply plans
or portfolios for end-use customers;
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 31 -
|
|
LRB095 11114 MJR 38234 a |
(B) an advanced degree in economics, mathematics, engineering, risk
management, or a related area of study;
(C) 10 years of experience in the electricity sector, including managing
supply risk;
(D) expertise in wholesale electricity market rules, including those
established by the Federal Energy Regulatory Commission and regional
transmission organizations;
(E) expertise in credit protocols and familiarity with
contract protocols;
(F) adequate resources to perform and fulfill the required functions and
responsibilities; and
(G) the absence of a conflict of interest and inappropriate bias for or
against potential bidders or the affected electric utilities.
(2) The Agency shall each year, as needed, issue a request for qualifications
for a procurement administrator to conduct the competitive procurement processes in
accordance with Section 16-111.5 of the Public Utilities Act. In order to qualify
an expert or expert consulting firm must have:
(A) direct previous experience administering a large-scale competitive
procurement process;
(B) an advanced degree in economics, mathematics, engineering,
or a related area of
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 32 -
|
|
LRB095 11114 MJR 38234 a |
study;
(C) 10 years of experience in the electricity sector, including risk
management experience;
(D) expertise in wholesale electricity market rules, including those
established by the Federal Energy Regulatory Commission and regional
transmission organizations;
(E) expertise in credit and contract protocols;
(F) adequate resources to perform and fulfill the required functions and
responsibilities; and
(G) the absence of a conflict of interest and inappropriate bias for or
against potential bidders or the affected electric utilities.
(3) The Agency shall provide affected utilities and other interested parties
with the lists of qualified experts or expert consulting firms identified through
the request for qualifications processes that are under consideration to develop
the procurement plans and to serve as the procurement administrator. The Agency
shall also provide each qualified experts or expert consulting firms response to
the request for qualifications. All information provided under this subparagraph
shall also be provided to the Commission. The Agency may provide by rule for fees
associated with supplying the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 33 -
|
|
LRB095 11114 MJR 38234 a |
information to utilities and other interested parties. These parties shall, within
5 business days, notify the Agency in writing if they object to any experts or
expert consulting firms on the lists. Objections shall
be based on:
(A) failure to satisfy qualification criteria;
(B) identification of a conflict of interest; or
(C) evidence of inappropriate bias for or against potential
bidders or the affected utilities.
The Agency shall remove experts or expert consulting firms from the lists
within 10 days if there is a reasonable basis for an objection and provide the
updated lists to the affected utilities and other interested parties. If the Agency
fails to remove an expert or expert consulting firm from a list, an objecting party
may seek review by the Commission within 5 days thereafter by filing a petition,
and the Commission shall render a ruling on the petition within 10 days. There is
no right of appeal of the Commissions ruling.
(4) The Agency shall issue requests for proposals to the qualified experts or
expert consulting firms to develop a procurement plan for the affected utilities
and to serve as procurement administrator.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 34 -
|
|
LRB095 11114 MJR 38234 a |
(5) The Agency shall select an expert or expert consulting firm to
develop procurement plans based on the proposals submitted and shall award
one-year contracts to those selected with an option for the Agency for a
one-year renewal.
(6) The Agency shall select an expert or expert consulting firm, with
approval of the Commission, to serve as procurement administrator based on the
proposals submitted. If the Commission rejects, within 5 days, the Agencys
selection, the Agency shall submit another recommendation within 3 days based on
the proposals submitted. The Agency shall award a one-year contract to the expert
or expert consulting firm so selected with Commission approval with an option for
the Agency for a one-year renewal.
(b) The experts or expert consulting firms retained by the Agency shall, as
appropriate, prepare procurement plans, and conduct a competitive procurement process as
prescribed in Section 16-111.5 of the Public Utilities Act, to ensure adequate, reliable,
affordable, efficient, and environmentally sustainable electric service at the lowest
total cost over time, taking into account any benefits of price stability, for eligible
retail customers of electric utilities that on December 31, 2005 provided electric
service to at least 100,000 customers in the State of Illinois .
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 35 -
|
|
LRB095 11114 MJR 38234 a |
(c) Renewable portfolio standard.
(1) The procurement plans shall include cost-effective renewable energy
resources. A minimum percentage of each utilitys total supply to serve the load of
eligible retail customers, as defined in Section 16-111.5 (a) of the Public
Utilities Act, procured for each of the following years shall be generated from
cost-effective renewable energy resources: at least 2% by June 1, 2008; at least 4%
by June 1, 2009; at least 5% by June 1, 2010; at least 6% by June 1, 2011; at least
7% by June 1, 2012; at least 8% by June 1, 2013; at least 9% by June 1, 2014; at
least 10% by June 1, 2015; and increasing by at least 1.5% each year thereafter to
at least 25% by June 1, 2025. To the extent that it is available, at least 75% of
the renewable energy resources used to meet these standards shall come from wind
generation. For purposes of this Section, cost-effective means that the costs of
procuring renewable energy resources do not cause the limit stated in paragraph (2)
of this subsection (c) to be exceeded.
(2) For purposes of this subsection (c), the required procurement of
cost-effective renewable energy resources for a particular year shall be measured
as a percentage of the actual amount of electricity (megawatt-hours) supplied by
the electric
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 36 -
|
|
LRB095 11114 MJR 38234 a |
utility to eligible retail customers in the planning year ending immediately
prior to the procurement. For purposes of this subsection (c), the amount per
kilowatthour means the total amount paid for electric service expressed on a per
kilowatthour basis. For purposes of this subsection (c), the total amount paid for
electric service includes without limitation amounts paid for supply, transmission,
distribution, surcharges, and add-on taxes.
Notwithstanding the requirements of this subsection (c), the total of
renewable energy resources procured pursuant to the procurement plan for any single
year shall be reduced by an amount necessary to limit the annual estimated average
net increase due to the costs of these resources included in the amounts paid by
eligible retail customers in
connection with electric service to:
(A) in 2008, no more than 0.5% of the amount paid per kilowatthour
by those customers during the year ending May 31, 2007;
(B) in 2009, the greater of an additional 0.5% of the amount paid per
kilowatthour by those customers during the year ending May 31, 2008 or 1% of
the amount paid per kilowatthour by those customers during the year ending
May 31, 2007;
(C) in 2010, the greater of an additional 0.5%
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 37 -
|
|
LRB095 11114 MJR 38234 a |
of the amount paid per kilowatthour by those customers during the year ending
May 31, 2009 or 1.5% of the amount paid per kilowatthour by those customers
during the year ending May 31, 2007;
(D) in 2011, the greater of an additional 0.5% of the amount paid per
kilowatthour by those customers during the year ending May 31, 2010 or 2% of
the amount paid per kilowatthour by those customers during the year ending
May 31, 2007; and
(E) thereafter, the amount of renewable energy resources procured
pursuant to the procurement plan for any single year shall be reduced by an
amount necessary to limit the estimated average net increase due to the cost
of these resources included in the amounts paid by eligible retail customers
in connection with electric service to no more than the greater of 2.015% of
the amount paid per kilowatthour by those customers during the year ending
May 31, 2007 or the incremental amount per kilowatthour paid for these
resources
in 2011.
No later than June 30, 2011, the Commission shall review the limitation on the
amount of renewable energy resources procured pursuant to this subsection (c) and
report to the General Assembly its findings as to whether that limitation unduly
constrains the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 38 -
|
|
LRB095 11114 MJR 38234 a |
procurement of cost-effective renewable energy resources.
(3) Through June 1, 2011, renewable energy resources shall be counted for the
purpose of meeting the renewable energy standards set forth in paragraph
(1) of this subsection (c) only if they are generated from facilities located
in the State, provided that cost-effective renewable energy resources are available
from those facilities. If those cost-effective resources are not available in
Illinois, they shall be procured in states that adjoin Illinois and may be counted
towards compliance. If those cost-effective resources are not available in Illinois
or in states that adjoin Illinois, they shall be purchased elsewhere and shall be
counted towards compliance. After June 1, 2011, cost-effective renewable energy
resources located in Illinois and in states that adjoin Illinois may be counted
towards compliance with the standards set forth in paragraph
(1) of this subsection (c). If those cost-effective resources are not available in
Illinois or in states that adjoin Illinois, they shall be purchased elsewhere and
shall be counted towards compliance.
(4) The electric utility shall retire all
renewable energy credits used to comply with the standard.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 39 -
|
|
LRB095 11114 MJR 38234 a |
(d) The draft procurement plans are subject to public comment, as required by
Section 16-111.5 of the Public Utilities Act.
(e) The Agency shall submit the final procurement plan to the Commission. The Agency
shall revise a procurement plan if the Commission determines that it does not meet the
standards set forth in Section 16-111.5 of the Public Utilities Act.
(f) The Agency shall assess fees to each affected utility to recover the costs
incurred in preparation of the annual procurement plan for the utility.
(g) The Agency shall assess fees to each bidder to recover the costs incurred in
connection with a competitive procurement process.
Section 1-80. Resource Development Bureau. The Resource Development Bureau has the
following duties and responsibilities:
(a) At the Agencys discretion, conduct feasibility studies on the construction of
any facility. Funding for a study shall come from either:
(i) fees assessed by the Agency on municipal electric systems,
governmental aggregators, unit or units of local government, or rural electric
cooperatives requesting the feasibility study; or
(ii) an appropriation from the General Assembly.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 40 -
|
|
LRB095 11114 MJR 38234 a |
(b) If the Agency undertakes the construction of a facility, moneys generated
from the sale of revenue bonds by the Authority for the facility shall be used to
reimburse the source of the money used for the facilitys feasibility study.
(c) The Agency may develop, finance, construct, or operate electric generation and
co-generation facilities that use indigenous coal or renewable resources, or both,
financed with bonds issued by the Authority on behalf of the Agency. Preference shall be
given to technologies that enable carbon capture and sites in locations where the geology
is suitable for carbon sequestration.
(1) The Agency may enter into contractual arrangements with private and public
entities, including but not limited to municipal electric systems, governmental
aggregators, and rural electric cooperatives, to plan, site, construct, improve,
rehabilitate, and operate those electric generation and co-generation facilities.
No contract shall be entered into by the Agency that would jeopardize the
tax-exempt status of any bond issued in connection with a project for which the
Agency entered into the contract.
(2) The Agency shall hold at least one public hearing before entering into any
such contractual arrangements. At least 30-days notice of the hearing
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 41 -
|
|
LRB095 11114 MJR 38234 a |
shall be given by publication once in each week during that period in 6
newspapers within the State, at least
one of which has a circulation area that includes the location of the proposed
facility.
(3) The first facility that the Agency develops, finances, or constructs shall
be a facility that uses coal produced in Illinois. The Agency may, however, also
develop, finance, or construct renewable energy facilities after work on the first
facility has commenced.
(4) The Agency may not develop, finance, or construct a nuclear
power plant.
(5) The Agency shall assess fees to applicants seeking to partner
with the Agency on projects.
(d) Use of electricity generated by the Agencys facilities. The Agency may supply
electricity produced by the Agencys facilities to municipal electric systems,
governmental aggregators, or rural electric cooperatives in Illinois. The electricity
shall be supplied at cost.
(1) Contracts to supply power and energy from the Agencys facilities shall
provide for the effectuation of the policies set forth in this Act.
(2) The contracts shall also provide that, notwithstanding any provision in
the Public Utilities Act, entities supplied with power and energy from an Agency
facility shall supply the power and energy to
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 42 -
|
|
LRB095 11114 MJR 38234 a |
retail customers at the same price paid to purchase power and energy from the
Agency.
(e) Electric utilities shall not be required to purchase electricity directly or
indirectly from facilities developed or sponsored by the Agency.
(f) The Agency may sell excess capacity and excess energy into the wholesale electric
market at prevailing market rates;
provided, however, the Agency may not sell excess capacity or excess energy through the
procurement process described in Section 16-111.5 of the Public Utilities Act.
(g) The Agency shall not directly sell electric power and energy to retail customers.
Nothing in this paragraph shall be construed to prohibit sales to municipal electric systems,
governmental aggregators, or rural electric cooperatives.
Section 1-85. Construction of facilities. The Agency may begin construction of a facility
costing the Agency more than $100,000,000 only if the Agency demonstrates each of the
following:
(a) After conducting a study, that the construction and operation of the facility
is feasible.
(b) That the project does not materially adversely affect overall real
property taxes in the taxing jurisdictions where the facility is to be located.
(c) That the Agency has received all required federal, State, and local government
licenses, permits, or approval
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 43 -
|
|
LRB095 11114 MJR 38234 a |
for the facility.
(d) That the Agency has obtained binding written commitments from municipal
electric systems, governmental aggregators, or rural electric cooperatives
constituting agreements to purchase, in the aggregate, at least 75% of the
anticipated output of the facility for a time period long enough to ensure recovery
of:
(1) all costs, including interest, amortization charges, and reserve
charges, sufficient to retire revenue bonds issued for costs incurred in
connection with the development and construction of a facility; and
(2) all operating, capital, administrative, and
general expenses for the continued operation of the
facility, including fiscal reserves, and any
depreciation charges or costs.
(e) That the Agency has a reasonable plan to sell the remaining anticipated output
of the facility to municipal electric systems, governmental aggregators, or rural
electric cooperatives.
Section 1-86. General Assembly approval. For projects costing the Agency $1,000,000,000
or more, in addition to the provisions of Section 1-85, the General Assembly must adopt a
joint resolution of the House of Representatives and the Senate approving the construction of
the facility.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 44 -
|
|
LRB095 11114 MJR 38234 a |
Section 1-87. Management and operating agreements. For projects costing the Agency
$1,000,000,000 or more, the Agency shall enter into management and operating agreements for
the relevant facility or facilities. Solicitation for any such management and operating
agreement shall be pursuant to a request for proposals. The agreements must comply with the
Internal Revenue Code and its regulations and shall not jeopardize the tax-exempt status of
any bond issued in connection with a project for which the Agency entered into the agreement.
Section 1-90. Distribution and transmission facilities. The Agency shall not own or
acquire distribution or transmission facilities except as necessary to connect an Agency
facility to an electric transmission or distribution system.
Section 1-95. Insurance. Upon the Authoritys issuance of revenue bonds for an Agency
facility, the Agency shall purchase
an insurance policy to cover those construction and operation costs associated with the
facility. The policy shall remain in effect for the time period under which the Agency may
accrue any liabilities associated with the facility.
Section 1-100. Timely payment to Agency. Any party
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 45 -
|
|
LRB095 11114 MJR 38234 a |
receiving electricity shall make timely payment on all bills rendered by the Agency. Any
violation of contractual terms by a party receiving electricity from an Agency facility is
grounds for cancellation and termination of the contract.
Section 1-105. Deposit of revenue. All revenue from contracts described in Section
1-80(d) shall be deposited into the Illinois Power Agency Facilities Fund.
Section 1-110. State Police reimbursement. The Agency shall reimburse the Department of
State Police for any expenses associated with security at facilities from the Illinois Power
Agency Facilities Fund.
Section 1-115. Revenue from real estate. All revenue from any sale, conveyance, lease,
exchange, transfer, abandonment, or other disposition of real property shall be deposited into
the Illinois Power Agency Facilities Fund.
Section 1-120. Protection of confidential and proprietary information. The Agency shall
provide adequate protection for confidential and proprietary information furnished, delivered,
or filed by any person, corporation, or other entity.
Section 1-125. Agency annual reports. The Agency shall report annually to the Governor
and the General Assembly on the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 46 -
|
|
LRB095 11114 MJR 38234 a |
operations and transactions of the Agency. The annual report shall include, but not
be limited to, each of the following:
(1) The quantity, price, and term of all contracts for electricity procured under
the procurement plans for electric utilities.
(2) The quantity, price, and rate impact of all renewable resources
purchased under the electricity procurement plans for electric utilities.
(3) The quantity, price, and rate impact of all energy efficiency and demand
response measures purchased for electric utilities.
(4) The amount of power and energy produced by each Agency facility.
(5) The quantity of electricity supplied by each Agency facility to municipal
electric systems, governmental aggregators, or rural electric cooperatives in Illinois.
(6) The revenues as allocated by the Agency to each facility.
(7) The costs as allocated by the Agency to each facility.
(8) The accumulated depreciation for each facility.
(9) The status of any projects under development.
(10) Basic financial and operating information specifically detailed
for the reporting year and including, but not limited to, income and expense
statements, balance sheets, and changes in financial
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 47 -
|
|
LRB095 11114 MJR 38234 a |
position, all in accordance with generally accepted accounting principles,
debt structure, and a summary of funds on a cash basis.
Section 1-130. Home rule preemption.
(a) The authorization to impose any new taxes or fees specifically related to the
generation of electricity by, the capacity to generate electricity by, or the emissions into
the atmosphere by electric generating facilities after the effective date of this Act is an
exclusive power and function of the State. A home rule unit may not levy any new taxes or fees
specifically related to the generation of electricity by, the capacity to generate electricity
by, or the emissions into the atmosphere by electric generating facilities after the effective
date of this Act. This Section is a denial and limitation on home rule powers and functions
under subsection (g) of Section 6 of Article VII of the Illinois Constitution.
(b) This Section is repealed on January 1, 2019.
ARTICLE 5
Section 5-900. The Freedom of Information Act is amended by changing Section 7 as
follows:
(5 ILCS 140/7) (from Ch. 116, par. 207)
Sec. 7. Exemptions.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 48 -
|
|
LRB095 11114 MJR 38234 a |
(1) The following shall be exempt from inspection and copying:
(a) Information specifically prohibited from disclosure by federal or State law or
rules and regulations adopted under federal or State law.
(b) Information that, if disclosed, would constitute a
clearly unwarranted invasion of personal privacy, unless the disclosure is consented
to in writing by the individual subjects of the information. The disclosure of
information that bears on the public duties of public employees and officials shall not
be considered an invasion of personal privacy. Information exempted under this subsection
(b) shall include but is not limited to:
(i) files and personal information maintained with respect to clients,
patients, residents, students or other individuals receiving social, medical,
educational, vocational, financial, supervisory or custodial care or services
directly or indirectly from federal agencies or public bodies;
(ii) personnel files and personal information maintained with respect to
employees, appointees or elected officials of any public body or applicants for
those positions;
(iii) files and personal information maintained with respect to any applicant,
registrant or licensee by any public body cooperating with or engaged in
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 49 -
|
|
LRB095 11114 MJR 38234 a |
professional or occupational registration, licensure or discipline;
(iv) information required of any taxpayer in connection with the assessment or
collection of any tax unless disclosure is otherwise required by State statute;
(v) information revealing the identity of persons who file complaints with or
provide information to administrative, investigative, law enforcement or penal
agencies; provided, however, that identification
of witnesses to traffic accidents, traffic accident reports, and rescue
reports may be provided by agencies of local government, except in a case for which
a criminal investigation is ongoing, without constituting a clearly unwarranted per
se invasion of personal privacy under this subsection; and
(vi) the names, addresses, or other personal information of participants and
registrants in park district, forest preserve district, and conservation district
programs.
(c) Records compiled by any public body for administrative enforcement proceedings
and any law enforcement or correctional agency for law enforcement purposes or for
internal matters of a public body, but only to the extent that disclosure would:
(i) interfere with pending or actually and
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 50 -
|
|
LRB095 11114 MJR 38234 a |
reasonably contemplated law enforcement proceedings conducted by any
law enforcement or correctional agency;
(ii) interfere with pending administrative enforcement proceedings conducted
by any public body;
(iii) deprive a person of a fair trial or an impartial hearing;
(iv) unavoidably disclose the identity of a confidential source
or confidential information furnished only by the confidential
source;
(v) disclose unique or specialized investigative techniques other than those
generally used and known or disclose internal documents of correctional agencies
related to detection, observation or investigation of
incidents of crime or misconduct;
(vi) constitute an invasion of personal privacy under subsection (b) of
this Section;
(vii) endanger the life or physical safety of law enforcement personnel or
any other person; or
(viii) obstruct an ongoing criminal investigation.
(d) Criminal history record
information maintained by State or local criminal justice agencies, except the
following which shall be open for public inspection and copying:
(i) chronologically maintained arrest information, such as traditional
arrest logs or blotters;
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 51 -
|
|
LRB095 11114 MJR 38234 a |
(ii) the name of a person in the custody of a law enforcement agency
and the charges for which that person is being held;
(iii) court records that are public;
(iv) records that are otherwise available
under State or local law; or
(v) records in which the requesting party is the individual identified, except
as provided under part (vii) of paragraph (c) of subsection (1) of this Section.
Criminal history record information means data identifiable to an individual and
consisting of descriptions or notations of arrests, detentions, indictments,
informations, pre-trial proceedings, trials, or other formal events in the criminal
justice system or descriptions or notations of criminal charges (including criminal
violations of local municipal ordinances) and the nature of any disposition arising
therefrom, including sentencing, court or correctional supervision,
rehabilitation and release. The term does not apply to statistical records and
reports in which individuals are not identified and from which their identities are
not ascertainable, or to information that is for criminal investigative or
intelligence purposes.
(e) Records that relate to or affect the security of correctional institutions
and detention facilities.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 52 -
|
|
LRB095 11114 MJR 38234 a |
(f) Preliminary drafts, notes, recommendations, memoranda and other records in
which opinions are expressed, or policies or actions are formulated, except that a
specific record or relevant portion of a record shall not be exempt when the record is
publicly cited and identified by the head of the public body. The exemption provided in
this paragraph (f) extends to all those records of officers and agencies of the General
Assembly that pertain to the preparation of legislative documents.
(g) Trade secrets and commercial or financial information obtained from a person or
business where the trade secrets or information are proprietary, privileged or
confidential, or where disclosure of the trade secrets or information may cause
competitive harm, including:
(i) All information determined to be confidential under Section 4002 of the
Technology Advancement and Development Act.
(ii) All trade secrets and commercial or financial information obtained by a
public body, including a public pension fund, from a private equity fund or a
privately held company within the investment portfolio of a private equity fund as
a result of either investing or evaluating a potential investment of
public funds in a private equity fund. The exemption contained in this item does
not apply to the aggregate financial performance information of a private equity
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 53 -
|
|
LRB095 11114 MJR 38234 a |
fund, nor to the identity of the funds managers or general partners. The exemption
contained in this item does not apply to the identity of a privately held company within the
investment portfolio of a private equity fund, unless the disclosure of the identity of a
privately held company may cause competitive harm.
Nothing contained in this paragraph (g)
shall be construed to prevent a person or business from consenting to disclosure.
(h) Proposals and bids for any contract, grant, or agreement, including
information which if it were
disclosed would frustrate procurement or give an advantage to any person proposing to
enter into a contractor agreement with the body, until an award or final selection is
made. Information prepared by or for the body in preparation of a bid solicitation shall
be exempt until an award or final selection is made.
(i) Valuable formulae, computer geographic systems, designs, drawings and research
data obtained or produced by any public body when disclosure could reasonably be expected
to produce private gain or public loss. The exemption for computer geographic systems
provided in this paragraph (i) does not extend to requests made by news media as defined
in Section 2 of this Act when the requested information is not otherwise exempt and the
only purpose of the request is to access and disseminate information regarding the
health, safety, welfare, or
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 54 -
|
|
LRB095 11114 MJR 38234 a |
legal rights of the general public.
(j) Test questions, scoring keys and other examination data used to administer an academic
examination or determined the qualifications of an applicant for a license or employment.
(k) Architects plans, engineers technical submissions, and other construction related
technical documents for projects not constructed or developed in whole or in part with public funds
and the same for projects constructed or developed with public funds, but only to the extent that
disclosure would compromise security, including but not limited to water treatment facilities,
airport facilities, sport stadiums, convention centers, and all government owned, operated, or
occupied buildings.
(l) Library circulation and order records identifying
library users with specific materials.
(m) Minutes of meetings of public bodies closed to the public as provided in the Open Meetings
Act until the public body makes the minutes available to the public under Section 2.06 of the Open
Meetings Act.
(n) Communications between a public body and an attorney or auditor representing the public
body that would not be subject to discovery in litigation, and materials prepared or compiled by or
for a public body in anticipation of a criminal, civil or administrative
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 55 -
|
|
LRB095 11114 MJR 38234 a |
proceeding upon the request of an attorney advising the public body, and materials prepared or
compiled with respect to internal audits of public bodies.
(o) Information received by a primary or secondary school, college or university under its
procedures for the evaluation of faculty members by their academic peers.
(p) Administrative or technical information associated with automated data processing
operations, including but not limited to software, operating protocols, computer program abstracts,
file layouts, source listings, object modules, load modules, user guides, documentation pertaining
to all logical and physical design of computerized systems, employee manuals, and any other
information that, if disclosed, would jeopardize the security of the system or its data or the
security of materials exempt under this Section.
(q) Documents or materials relating to collective negotiating matters between public bodies
and their employees or representatives, except that any final contract or agreement shall be
subject to inspection and copying.
(r) Drafts, notes, recommendations and memoranda pertaining to the financing and marketing
transactions of the public body. The records of ownership, registration, transfer, and exchange of
municipal debt obligations, and of persons to whom payment with respect to these
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 56 -
|
|
LRB095 11114 MJR 38234 a |
obligations is made.
(s) The records, documents and information relating to real estate purchase negotiations until
those negotiations have been completed or otherwise terminated. With regard to
a parcel involved in a pending or actually and reasonably contemplated eminent domain proceeding
under the Eminent Domain Act, records, documents and information relating to that parcel shall be
exempt except as may be allowed under discovery rules adopted by the Illinois Supreme Court. The
records, documents and information relating to a real estate sale shall be exempt until a sale is
consummated.
(t) Any and all proprietary information and records related to the operation of an
intergovernmental risk management association or self-insurance pool or jointly self-administered
health and accident cooperative or pool.
(u) Information concerning a universitys adjudication of student or employee grievance or
disciplinary cases, to the extent that disclosure would reveal the identity of the student or
employee and information concerning any public bodys adjudication of student or employee
grievances or disciplinary cases, except for the final outcome of the cases.
(v) Course materials or research materials used by
faculty members.
(w) Information related solely to the internal
personnel rules and practices of a public body.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 57 -
|
|
LRB095 11114 MJR 38234 a |
(x) Information contained in or related to examination, operating, or condition reports
prepared by, on behalf of, or for the use of a public body responsible for the regulation or
supervision of financial institutions or insurance companies, unless disclosure is otherwise
required by State law.
(y) Information the disclosure of which is restricted
under Section 5-108 of the Public Utilities Act.
(z) Manuals or instruction to staff that relate to establishment or collection of liability
for any State tax or that relate to investigations by a public body to determine violation of any
criminal law.
(aa) Applications, related documents, and medical records received by the Experimental Organ
Transplantation Procedures Board and any and all documents or other records prepared by the
Experimental Organ Transplantation Procedures Board or its staff relating to applications it has
received.
(bb) Insurance or self insurance (including any intergovernmental risk management
association or self insurance pool) claims, loss or risk management information, records,
data, advice or communications.
(cc) Information and records held by the Department of Public Health and its authorized
representatives relating to known or suspected cases of sexually transmissible disease or any
information the disclosure of which is
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 58 -
|
|
LRB095 11114 MJR 38234 a |
restricted under the Illinois Sexually Transmissible
Disease Control Act.
(dd) Information the disclosure of which is exempted
under Section 30 of the Radon Industry Licensing Act.
(ee) Firm performance evaluations under Section 55 of the Architectural, Engineering, and Land
Surveying Qualifications Based Selection Act.
(ff) Security portions of system safety program plans, investigation reports, surveys,
schedules, lists, data, or information compiled, collected, or prepared by or for the Regional
Transportation Authority under Section 2.11 of the Regional Transportation Authority Act or the St.
Clair County Transit District under the Bi-State Transit Safety Act.
(gg) Information the disclosure of which is restricted and exempted under Section 50 of the
Illinois Prepaid Tuition Act.
(hh) Information the disclosure of which is exempted
under the State Officials and Employees Ethics Act.
(ii) Beginning July 1, 1999, information that would disclose or might lead to the disclosure
of secret or confidential information, codes, algorithms, programs, or private keys intended to be
used to create electronic or digital signatures under the Electronic Commerce Security Act.
(jj) Information contained in a local emergency energy
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 59 -
|
|
LRB095 11114 MJR 38234 a |
plan submitted to a municipality in accordance with a local emergency energy plan ordinance that is
adopted under Section 11-21.5-5 of the Illinois Municipal Code.
(kk) Information and data concerning the distribution of surcharge moneys collected and
remitted by wireless carriers under the Wireless Emergency Telephone Safety Act.
(ll) Vulnerability assessments, security measures, and response policies or plans that are
designed to identify, prevent, or respond to potential attacks upon a communitys population or
systems, facilities, or installations, the destruction or contamination of which would constitute a
clear and present danger to the health or safety of the community, but only to the extent that
disclosure could reasonably be expected to jeopardize the effectiveness of the measures or the
safety of the personnel who implement
them or the public. Information exempt under this item may include such things as details
pertaining to the mobilization or deployment of personnel or equipment, to the operation of
communication systems or protocols, or to tactical operations.
(mm) Maps and other records regarding the location or security of a utilitys generation,
transmission, distribution, storage, gathering, treatment, or
switching facilities owned by a
utility or by the Illinois Power
Agency.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 60 -
|
|
LRB095 11114 MJR 38234 a |
(nn) Law enforcement officer identification information or driver identification information
compiled by a law enforcement agency or the Department of Transportation under Section 11-212 of
the Illinois Vehicle Code.
(oo) Records and information provided to a residential health care facility resident sexual
assault and death review team or the Executive Council under the Abuse Prevention Review Team Act.
(pp) Information provided to the predatory lending database created pursuant to Article 3 of
the Residential Real Property Disclosure Act, except to the extent authorized under that Article.
(qq) Defense budgets and petitions for certification of compensation and expenses for court
appointed trial counsel as provided under Sections 10 and 15 of the Capital Crimes Litigation Act.
This subsection (qq) shall apply until the conclusion of the trial of the case, even if the
prosecution chooses not to pursue the death penalty prior to trial or sentencing.
(rr) Information contained in or related to proposals, bids, or negotiations related to
electric power procurement under Section 1-75 of the Illinois Power Agency Act and Section 16-111.5
of the Public Utilities Act that is determined to be confidential and proprietary by th
Illinois Power Agency or by the Illinois Commerce
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 61 -
|
|
LRB095 11114 MJR 38234 a |
Commission.
(2) This Section does not authorize withholding of information or limit the availability of
records to the public, except as stated in this Section or otherwise provided in this Act.
(Source: P.A. 93-43, eff. 7-1-03; 93-209, eff. 7-18-03; 93-237, eff. 7-22-03; 93-325, eff. 7-23-03,
93-422, eff. 8-5-03; 93-577, eff. 8-21-03; 93-617, eff. 12-9-03; 94-280, eff. 1-1-06; 94-508, eff.
1-1-06; 94-664, eff. 1-1-06; 94-931, eff. 6-26-06; 94-953, eff. 6-27-06; 94-1055, eff. 1-1-07; revised 8-3-06.)
Section 5-905. The Civil Administrative Code of Illinois is
mended by changing Sections 5-15 and 5-20 and by adding Section 5-222 as follows:
(20 ILCS 5/5-15) (was 20 ILCS 5/3)
Sec. 5-15. Departments of State government. The
Departments of State government are created as follows:
The Department on Aging.
The Department of Agriculture.
The Department of Central Management Services.
The Department of Children and Family Services.
The Department of Commerce and Economic Opportunity.
The Department of Corrections.
The Department of Employment Security.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 62 -
|
|
LRB095 11114 MJR 38234 a |
The Emergency Management Agency.
The Department of Financial Institutions.
The
Department of Healthcare and Family Services.
The Department of Human Rights.
The Department of Human Services.
The
Illinois Power Agency.
The Department of Insurance.
The Department of Juvenile Justice.
The Department of Labor.
The Department of the Lottery.
The Department of Natural Resources.
The Department of Professional Regulation.
The Department of Public Aid.
The Department of Public Health.
The Department of Revenue.
The Department of State Police.
The Department of Transportation.
The Department of Veterans Affairs.
(Source: P.A. 93-25, eff. 6-20-03; 93-1029, eff. 8-25-04; 94-696, eff. 6-1-06; revised 9-14-06.)
(20 ILCS 5/5-20) (was 20 ILCS 5/4)
Sec. 5-20. Heads of departments. Each department shall have an officer as its head who shall
be known as director or secretary and who shall, subject to the provisions of the Civil
Administrative Code of Illinois, execute the powers and
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 63 -
|
|
LRB095 11114 MJR 38234 a |
discharge the duties vested by law in his or her respective
department.
The following officers are hereby created:
Director of Aging, for the Department on Aging.
Director of Agriculture, for the Department of Agriculture.
Director of Central Management Services, for the
Department of Central Management Services.
Director of Children and Family Services, for the
Department of Children and Family Services.
Director of Commerce and Economic Opportunity, for the
Department of Commerce and Economic Opportunity.
Director of Corrections, for the Department of
Corrections.
Director of Emergency Management Agency, for the Emergency
Management Agency.
Director of Employment Security, for the Department of
Employment Security.
Director of Financial Institutions, for the Department of
Financial Institutions.
Director of Healthcare and Family Services, for the
Department of Healthcare and Family Services.
Director of Human Rights, for the Department of Human
Rights.
Secretary of Human Services, for the Department of Human
Services.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 64 -
|
|
LRB095 11114 MJR 38234 a |
Director of the Illinois Power Agency, for the Illinois
Power Agency.
Director of Insurance, for the Department of Insurance.
Director of Juvenile Justice, for the Department of Juvenile Justice.
Director of Labor, for the Department of Labor.
Director of the Lottery, for the Department of the Lottery.
Director of Natural Resources, for the Department of Natural Resources.
Director of Professional Regulation, for the Department of
Professional Regulation.
Director of Public Aid, for the Department of Public Aid.
Director of Public Health, for the Department of Public Health.
Director of Revenue, for the Department of Revenue.
Director of State Police, for the Department of State Police.
Secretary of Transportation, for the Department of
Transportation.
Director of Veterans Affairs, for the Department of
Veterans Affairs.
(Source: P.A. 93-25, eff. 6-20-03; 93-1029, eff. 8-25-04; 94-696, eff. 6-1-06; revised 9-14-06.)
(20 ILCS 5/5-222 new)
Sec.
5-222. Director of the Illinois Power Agency. The
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 65 -
|
|
LRB095 11114 MJR 38234 a |
Director of the Illinois Power Agency must have at least 15 years of combined experience in the
electric industry, electricity policy, or electricity markets and must possess:
(i) general knowledge of the responsibilities of being a
director, (ii) managerial experience, and (iii) an advanced
degree in economics, risk management, law, business, engineering, or
a related field.
Section 5-910. The Renewable Energy, Energy Efficiency,
and Coal Resources Development Law of 1997 is amended by changing Sections 6-5 and 6-7 as
follows:
(20 ILCS 687/6-5)
(Section scheduled to be repealed on December 16, 2007) Sec. 6-5. Renewable Energy Resources
and Coal Technology Development Assistance Charge.
(a) Notwithstanding the provisions of Section 16-111 of the Public Utilities Act but subject
to subsection (e) of this Section, each public utility, electric cooperative, as defined in Section
3.4 of the Electric Supplier Act, and municipal utility, as referenced in Section 3-105 of the
Public Utilities Act, that is engaged in the delivery of electricity or the distribution of natural
gas within the State of Illinois shall, effective January 1, 1998, assess each of its customer
accounts a monthly Renewable Energy Resources and Coal Technology Development Assistance Charge.
The delivering public utility,
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 66 -
|
|
LRB095 11114 MJR 38234 a |
municipal electric or gas utility, or electric or gas cooperative for a self-assessing purchaser
remains subject to the collection of the fee imposed by this Section. The monthly charge shall be
as follows:
(1) $0.05 per month on each account for residential electric service as defined in
Section 13 of the Energy Assistance Act;
(2) $0.05 per month on each account for residential gas service as defined in Section 13
of the Energy Assistance Act;
(3) $0.50 per month on each account for nonresidential electric service, as defined in
Section 13 of the Energy Assistance Act, which had less than 10 megawatts of peak demand
during the previous calendar year;
(4) $0.50 per month on each account for nonresidential gas service, as defined in Section
13 of the Energy Assistance Act, which had distributed to it less than 4,000,000 therms of
gas during the previous calendar year;
(5) $37.50 per month on each account for nonresidential electric service, as defined in Section
13 of the Energy Assistance Act, which had 10 megawatts or greater of peak
demand during the previous calendar year; and
(6) $37.50 per month on each account for nonresidential gas service, as defined in Section 13
of the Energy Assistance Act, which had 4,000,000 or more therms of gas distributed to it during
the previous calendar year.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 67 -
|
|
LRB095 11114 MJR 38234 a |
(b) The Renewable Energy Resources and Coal Technology Development Assistance Charge assessed
by electric and gas public utilities shall be considered a charge for public utility service.
(c) Fifty percent of the moneys collected pursuant to this Section shall be deposited in the
Renewable Energy Resources Trust Fund by the Department of Revenue. The remaining 50 percent of the
moneys collected pursuant to this Section shall be deposited in the Coal Technology Development
Assistance Fund by the Department of Revenue for the exclusive purposes of (1) capturing or
sequestering carbon emissions produced by coal combustion; (2) supporting research on the capture
and sequestration of carbon emissions produced by coal combustion; and (3) improving coal miner
safety use under the Illinois Coal Technology Development Assistance
Act.
(d) By the 20th day of the month following the month in which the charges imposed by this
Section were collected, each utility and alternative retail electric supplier collecting charges
pursuant to this Section shall remit to the Department of Revenue for deposit in the Renewable
Energy Resources Trust Fund and the Coal Technology Development Assistance Fund all moneys received
as payment of the charge provided for in this Section on a return prescribed and furnished by the
Department of Revenue showing such information as the Department of Revenue may reasonably require.
(e) The charges imposed by this Section shall only apply to
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 68 -
|
|
LRB095 11114 MJR 38234 a |
customers of municipal electric or gas utilities and electric or gas cooperatives if the municipal
electric or gas utility or electric or gas cooperative makes an affirmative decision to impose the
charge. If a municipal electric or gas utility or an electric or gas cooperative makes an
affirmative decision to impose the charge provided by this Section, the municipal electric or gas
utility or electric or gas cooperative shall inform the Department of Revenue in writing of such
decision when it begins to impose the charge. If a municipal electric or gas utility or electric or
gas cooperative does not assess this charge, its customers shall not be eligible for the Renewable
Energy Resources Program.
(f) The Department of Revenue may establish such rules as
it deems necessary to implement this Section. (Source: P.A. 92-690, eff.7-18-02.)
(20 ILCS 687/6-7)
(Section scheduled to be repealed on December 16, 2007) Sec. 6-7. Repeal. The provisions of
this Law are repealed on December 12, 2015 10 years after the effective date of this amendatory Act
of 1997 unless renewed by act of the General
Assembly.
(Source: P.A. 90-561, eff. 12-16-97.)
Section 5-915. The Illinois Finance Authority Act is
amended by adding Section 825-90 and by changing Sections
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 69 -
|
|
LRB095 11114 MJR 38234 a |
801-40 and 845-5 as follows:
(20 ILCS 3501/801-40)
Sec. 801-40. In addition to the powers otherwise authorized by law and in addition to the
foregoing general corporate powers, the Authority shall also have the following additional specific
powers to be exercised in furtherance of the purposes of this Act.
(a) The Authority shall have power (i) to accept grants, loans or appropriations from the
federal government or the State, or any agency or instrumentality thereof, to be used for the
operating expenses of the Authority, or for any purposes of the Authority, including the making of
direct loans of such funds with respect to projects, and (ii) to enter into any agreement with the
federal government or the State, or any agency or instrumentality thereof, in relationship to such
grants, loans or appropriations.
(b) The Authority shall have power to procure and enter into contracts for any type of
insurance and indemnity agreements covering loss or damage to property from any cause, including
loss of use and occupancy, or covering any other insurable risk.
(c) The Authority shall have the continuing power to issue bonds for its corporate purposes.
Bonds may be issued by the Authority in one or more series and may provide for the payment of any
interest deemed necessary on such bonds, of the costs of
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 70 -
|
|
LRB095 11114 MJR 38234 a |
issuance of such bonds, of any premium on any insurance, or of the cost of any guarantees, letters
of credit or other similar documents, may provide for the funding of the reserves deemed necessary
in connection with such bonds, and may provide for the refunding or advance refunding of any bonds
or for accounts deemed necessary in connection with any purpose of the Authority. The bonds may
bear interest payable at any time or times and at any rate or rates, notwithstanding any other
provision of law to the contrary, and such rate or rates may be
established by an index or formula which may be implemented or established by persons appointed or
retained therefor by the Authority, or may bear no interest or may bear interest payable at
maturity or upon redemption prior to maturity, may bear such date or dates, may be payable at such
time or times and at such place or places, may mature at any time or times not later than 40 years
from the date of issuance, may be sold at public or private sale at such time or times and at such
price or prices, may be secured by such pledges, reserves, guarantees, letters of credit, insurance
contracts or other similar credit support or liquidity instruments, may be executed in such manner,
may be subject to redemption prior to maturity, may provide for the registration of the bonds, and
may be subject to such other terms and conditions all as may be provided by the resolution or
indenture authorizing the issuance of such bonds. The holder or holders of any bonds issued by the
Authority may bring suits at law or proceedings in equity to compel the performance and
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 71 -
|
|
LRB095 11114 MJR 38234 a |
observance by any person or by the Authority or any of its agents or employees of any contract or
covenant made with the holders of such bonds and to compel such person or the Authority and any of
its agents or employees to perform any duties required to be performed for the benefit of the
holders of any such bonds by the provision of the resolution authorizing their issuance, and to
enjoin such person or the Authority and any of its agents or employees from taking any action in
conflict with any such contract or covenant.
Notwithstanding the form and tenor of any such bonds and in the absence of any express recital on
the face thereof that it is non-negotiable, all such bonds shall be negotiable instruments. Pending
the preparation and execution of any such bonds, temporary bonds may be issued as provided by the
resolution. The bonds shall be sold by the Authority in such manner as it shall determine. The
bonds may be secured as
provided in the authorizing resolution by the receipts, revenues, income and other available funds
of the Authority and by any amounts derived by the Authority from the loan agreement or lease
agreement with respect to the project or projects; and bonds may be issued as general obligations
of the Authority payable from such revenues, funds and obligations of the Authority as the bond
resolution shall provide, or may be issued as limited obligations with a claim for payment solely
from such revenues, funds and obligations as the bond resolution shall provide. The Authority may
grant a specific
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 72 -
|
|
LRB095 11114 MJR 38234 a |
pledge or assignment of and lien on or security interest in such rights, revenues, income, or
amounts and may grant a specific pledge or assignment of and lien on or security interest in any
reserves, funds or accounts established in the resolution authorizing the issuance of bonds. Any
such pledge, assignment, lien or security interest for the benefit of the holders of the
Authoritys bonds shall be valid and binding from the time the bonds are issued without any
physical delivery or further act, and shall be valid and binding as against and prior to the claims
of all other parties having claims against the Authority or any other person irrespective of
whether the other parties have notice of the pledge, assignment, lien or security interest. As
evidence of such pledge, assignment, lien and security interest, the Authority may execute and
deliver a mortgage, trust agreement, indenture or security agreement or an assignment thereof. A
remedy for any breach or default of the terms of any such agreement by the Authority may be by
mandamus proceedings in any court of competent jurisdiction to compel the performance and
compliance therewith, but the agreement may prescribe by whom or on whose behalf such action may be
instituted. It is expressly understood that the Authority may, but need not, acquire title to any
project with respect to which it exercises its authority.
(d) With respect to the powers granted by this Act, the
Authority may adopt rules and regulations prescribing the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 73 -
|
|
LRB095 11114 MJR 38234 a |
procedures by which persons may apply for assistance under this Act. Nothing herein shall be deemed
to preclude the Authority, prior to the filing of any formal application, from conducting
preliminary discussions and investigations with respect to the subject matter of any prospective
application.
(e) The Authority shall have power to acquire by purchase, lease, gift or otherwise any
property or rights therein from any person useful for its purposes, whether improved for the
purposes of any prospective project, or unimproved. The Authority may also accept any donation of
funds for its purposes from any such source. The Authority shall have no independent power of
condemnation but may acquire any property or rights therein obtained upon condemnation by any other
authority, governmental entity or unit of local government with such power.
(f) The Authority shall have power to develop, construct and improve either under its own
direction, or through collaboration with any approved applicant, or to acquire through purchase or
otherwise, any project, using for such purpose the proceeds derived from the sale of its bonds or
from governmental loans or grants, and to hold title in the name of the Authority to such projects.
(g) The Authority shall have power to lease pursuant to a lease agreement any project so
developed and constructed or acquired to the approved tenant on such terms and conditions as may be
appropriate to further the purposes of this Act and to
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 74 -
|
|
LRB095 11114 MJR 38234 a |
maintain the credit of the Authority. Any such lease may provide for either the Authority or the
approved tenant to assume initially, in whole or in part, the costs of maintenance, repair and
improvements during the leasehold period. In no case, however, shall the total rentals from any
project during any initial leasehold period or the total loan repayments to be made pursuant to any
loan agreement, be less than an amount necessary to return over such lease or loan period (1) all
costs incurred in connection with the development, construction, acquisition or improvement of the
project and for repair, maintenance and improvements thereto during the period of the lease or
loan; provided, however, that the rentals or loan repayments need not include costs met through the
use of funds other than those obtained by the Authority through the issuance of its bonds or
governmental loans; (2) a reasonable percentage additive to be agreed upon by the Authority and the
borrower or tenant to cover a properly allocable portion of the Authoritys general expenses,
including, but not limited to, administrative expenses, salaries and general insurance, and (3) an
amount sufficient to pay when due all principal of, interest and premium, if any on, any bonds
issued by the Authority with respect to the project. The portion of total rentals payable under
clause (3) of this subsection (g) shall be deposited in such special accounts, including all
sinking funds, acquisition or construction funds, debt service and other funds as provided by any
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 75 -
|
|
LRB095 11114 MJR 38234 a |
resolution, mortgage or trust agreement of the Authority pursuant to which any bond is issued.
(h) The Authority has the power, upon the termination of any leasehold period of any project,
to sell or lease for a further term or terms such project on such terms and conditions as the
Authority shall deem reasonable and consistent with the
purposes of the Act. The net proceeds from all such sales and the revenues or income from such
leases shall be used to satisfy any indebtedness of the Authority with respect to such project and
any balance may be used to pay any expenses of the Authority or be used for the further
development, construction, acquisition or improvement of projects. In the event any project is
vacated by a tenant prior to the termination of the initial leasehold period, the Authority shall
sell or lease the facilities of the project on the most advantageous terms available. The net
proceeds of any such disposition shall be treated in the same manner as the proceeds from sales or
the revenues or income from leases subsequent to the termination of any initial leasehold period.
(i) The Authority shall have the power to make loans to persons to finance a project, to enter
into loan agreements with respect thereto, and to accept guarantees from persons of its loans or
the resultant evidences of obligations of the Authority.
(j) The Authority may fix, determine, charge and collect
any premiums, fees, charges, costs and expenses, including,
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 76 -
|
|
LRB095 11114 MJR 38234 a |
without limitation, any application fees, commitment fees, program fees, financing charges or
publication fees from any person in connection with its activities under this Act.
(k) In addition to the funds established as provided herein, the Authority shall have the
power to create and establish such reserve funds and accounts as may be necessary or desirable to
accomplish its purposes under this Act and to deposit its available monies into the funds and
accounts.
(l) At the request of the governing body of any unit of local government, the Authority is
authorized to market such local governments revenue bond offerings by preparing bond issues for
sale, advertising for sealed bids, receiving bids at its offices, making the award to the bidder
that offers the
most favorable terms or arranging for negotiated placements or underwritings of such securities.
The Authority may, at its discretion, offer for concurrent sale the revenue bonds of several local
governments. Sales by the Authority of revenue bonds under this Section shall in no way imply State
guarantee of such debt issue. The Authority may require such financial information from
participating local governments as it deems necessary in order to carry out the purposes of this
subsection (1).
(m) The Authority may make grants to any county to which Division 5-37 of the Counties Code is
applicable to assist in the financing of capital development, construction and renovation of new or
existing facilities for hospitals and
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 77 -
|
|
LRB095 11114 MJR 38234 a |
health care facilities under that Act. Such grants may only be made from funds appropriated for
such purposes from the Build Illinois Bond Fund.
(n) The Authority may establish an urban development action grant program for the purpose of
assisting municipalities in Illinois which are experiencing severe economic distress to help
stimulate economic development activities needed to aid in economic recovery. The Authority shall
determine the types of activities and projects for which the urban development action grants may be
used, provided that such projects and activities are broadly defined to include all reasonable
projects and activities the primary objectives of which are the development of viable urban
communities, including decent housing and a suitable living environment, and expansion of economic
opportunity, principally for persons of low and moderate incomes. The Authority shall enter into
grant agreements from monies appropriated for such purposes from the Build Illinois Bond Fund. The
Authority shall monitor the use of the grants, and shall provide for audits of the funds as well as
recovery by the Authority of any funds determined to have been spent in
violation of this subsection (n) or any rule or regulation promulgated hereunder. The Authority
shall provide technical assistance with regard to the effective use of the urban development action
grants. The Authority shall file an annual report to the General Assembly concerning the progress
of the grant program.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 78 -
|
|
LRB095 11114 MJR 38234 a |
(o) The Authority may establish a Housing Partnership Program whereby the Authority provides
zero-interest loans to municipalities for the purpose of assisting in the financing of projects for
the rehabilitation of affordable multi-family housing for low and moderate income residents. The
Authority may provide such loans only upon a municipalitys providing evidence that it has obtained
private funding for the rehabilitation project. The Authority shall provide 3 State dollars for
every 7 dollars obtained by the municipality from sources other than the State of Illinois. The
loans shall be made from monies appropriated for such purpose from the Build Illinois Bond Fund.
The total amount of loans available under the Housing Partnership Program shall not exceed
$30,000,000. State loan monies under this subsection shall be used only for the acquisition and
rehabilitation of existing buildings containing 4 or more dwelling units. The terms of any loan
made by the municipality under this subsection shall require repayment of the loan to the
municipality upon any sale or other transfer of the project.
(p) The Authority may award grants to universities and research institutions, research
consortiums and other not-for-profit entities for the purposes of: remodeling or otherwise
physically altering existing laboratory or research facilities, expansion or physical additions to
existing laboratory or research facilities, construction of new laboratory or research facilities
or acquisition of modern
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 79 -
|
|
LRB095 11114 MJR 38234 a |
equipment to support laboratory or research operations provided that such grants (i) be used
solely in support of project and equipment acquisitions which enhance technology transfer, and
(ii) not constitute more than 60 percent of the total project or acquisition cost.
(q) Grants may be awarded by the Authority to units of local government for the purpose
of developing the appropriate infrastructure or defraying other costs to the local government
in support of laboratory or research facilities provided that such grants may not exceed 40%
of the cost to the unit of local government.
(r) The Authority may establish a Direct Loan Program to make loans to individuals,
partnerships or corporations for the purpose of an industrial project, as defined in Section
801-10 of this Act. For the purposes of such program and not by way of limitation on any other
program of the Authority, the Authority shall have the power to issue bonds, notes, or other
evidences of indebtedness including commercial paper for purposes of providing a fund of
capital from which it may make such loans. The Authority shall have the power to use any
appropriations from the State made especially for the Authoritys Direct Loan Program for
additional capital to make such loans or for the purposes of reserve funds or pledged funds
which secure the Authoritys obligations of repayment of any bond, note or other form of
indebtedness established for the purpose of providing capital for which it intends to make
such loans under the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 80 -
|
|
LRB095 11114 MJR 38234 a |
Direct Loan Program. For the purpose of obtaining such capital, the Authority may also enter
into agreements with financial institutions and other persons for the purpose of selling loans and developing a
secondary market for such loans. Loans made under the Direct Loan Program may be in an amount
not to exceed $300,000 and shall be made for a portion of an industrial project which does not
exceed 50% of the total project. No loan may be made by the Authority unless approved by the
affirmative vote of at least 8 members of the board. The Authority shall establish procedures
and publish rules which shall provide for the submission, review, and analysis of each direct
loan application and which shall preserve the ability of each board member to reach an
individual business judgment regarding the propriety of making each direct loan. The
collective discretion of the board to approve or disapprove each loan shall be unencumbered.
The Authority may establish and collect such fees and charges, determine and enforce such
terms and conditions, and charge such interest rates as it determines to be necessary and
appropriate to the successful administration of the Direct Loan Program. The Authority may
require such interests in collateral and such guarantees as it determines are necessary to
project the Authoritys interest in the repayment of the principal and interest of each loan
made under the Direct Loan Program.
(s) The Authority may guarantee private loans to third parties up to a specified
dollar amount in order to promote
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 81 -
|
|
LRB095 11114 MJR 38234 a |
economic development in this State.
(t) The Authority may adopt rules and regulations as may be necessary or advisable
to implement the powers conferred by this Act.
(u) The Authority shall have the power to issue bonds, notes or other evidences of
indebtedness, which may be used to make loans to units of local government which are
authorized to enter into loan agreements and other documents and to issue bonds, notes and
other evidences of indebtedness for the
purpose of financing the protection of storm sewer outfalls, the construction of
adequate storm sewer outfalls, and the provision for flood protection of sanitary sewage
treatment plans, in counties that have established a stormwater management planning committee
in accordance with Section 5-1062 of the Counties Code. Any such loan shall be made by the
Authority pursuant to the provisions of Section 820-5 to 820-60 of this Act. The unit of local
government shall pay back to the Authority the principal amount of the loan, plus annual
interest as determined by the Authority. The Authority shall have the power, subject to
appropriations by the General Assembly, to subsidize or buy down a portion of the interest on
such loans, up to 4% per annum.
(v) The Authority may accept security interests as provided in Sections 11-3 and 11-3.3
of the Illinois Public Aid Code.
(w) Moral Obligation. In the event that the Authority determines that monies of the
Authority will not be sufficient
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 82 -
|
|
LRB095 11114 MJR 38234 a |
for the payment of the principal of and interest on its bonds during the next State fiscal
year, the Chairperson, as soon as practicable, shall certify to the Governor the amount
required by the Authority to enable it to pay such principal of and interest on the bonds. The
Governor shall submit the amount so certified to the General Assembly as soon as practicable,
but no later than the end of the current State fiscal year. This subsection shall apply only
to any bonds or notes as to which the Authority shall have determined, in the resolution
authorizing the issuance of the bonds or notes, that this subsection shall apply. Whenever the
Authority makes such a determination, that fact shall be plainly stated on the face of the
bonds or notes and that fact shall also be reported to the Governor. In the event of a
withdrawal of moneys from a reserve fund established with respect to any issue or issues of
bonds of the Authority to pay principal or interest on those bonds,
the Chairperson of the Authority, as soon as practicable, shall certify to the Governor
the amount required to restore the reserve fund to the level required in the resolution or
indenture securing those bonds. The Governor shall submit the amount so certified to the
General Assembly as soon as practicable, but no later than the end of the current State fiscal
year. The Authority shall obtain written approval from the Governor for any bonds and notes to
be issued under this Section. In addition to any other bonds authorized to be issued under
Sections 825-60, 825-65(e), 830-25 and 845-5, the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 83 -
|
|
LRB095 11114 MJR 38234 a |
principal amount of Authority bonds outstanding issued under this Section 801-40(w) or under
20 ILCS 3850/1-80 or 30 ILCS 360/2-6(c), which have been assumed by the Authority, shall not
exceed $150,000,000. This subsection (w) shall in no way be applied to any bonds issued by
the Authority on behalf of the Illinois Power Agency under Section 825-90 of this Act.
(Source: P.A. 93-205, eff. 1-1-04; 94-91, eff. 7-1-05.)
(20 ILCS 3501/825-90 new)
Sec. 825-90. Illinois Power Agency Bonds.
(a) In this Section:
Agency means the Illinois Power Agency.
Agency loan agreement means any agreement pursuant to which the Illinois Finance
Authority agrees to loan the proceeds of its revenue bonds issued with respect to a specific
Illinois Power Agency project to the Illinois Power Agency upon terms providing for loan
repayment installments at least sufficient to pay when due all principal of, interest and
premium, if any, on any revenue bonds of the Authority, if any, issued with respect to the
Illinois Power Agency project, and providing for maintenance, insurance, and other matters as
may be deemed desirable by the Authority.
Authority means the Illinois Finance Authority.
Director means the Director of the Illinois Power Agency.
Facility means an
electric generating unit or a co-generating unit that produces electricity along with
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 84 -
|
|
LRB095 11114 MJR 38234 a |
related equipment necessary to connect the facility to an electric transmission
or distribution system.
Governmental aggregator means one or more units of local government that
individually or collectively procures electricity to serve residential retail electrical loads
located within its or their jurisdiction.
Local government means a unit of local government as defined in Section 1
of Article VII of the Illinois Constitution of 1970.
Project means any project as defined in the Illinois Power Agency Act.
Real property means any interest in land, together with all structures, fixtures,
and improvements thereon, including lands under water and riparian rights, any easements,
covenants, licenses, leases, rights-of-way, uses, and other interests, together with any
liens, judgments, mortgages, or other claims or security interests related to real
property.
Revenue bond means any bond, note, or other evidence of indebtedness issued by the
Illinois Finance Authority on behalf of the Illinois Power Agency, the principal and interest
of which is payable solely from revenues or income derived from any project or activity of the
Agency.
(b) Powers and duties; Illinois Power Agency Program. The Authority has the
power:
(1) To accept from time to time pursuant to an Agency
loan agreement any pledge or a pledge agreement by the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 85 -
|
|
LRB095 11114 MJR 38234 a |
Agency subject to the requirements and limitations of the Illinois Power
Agency Act.
(2) To issue revenue bonds in one or more series pursuant to one or more
resolutions of the Authority to loan funds to the Agency pursuant to one or more Agency
loan agreements meeting the requirements of the Illinois Power Agency Act and providing
for the payment of any interest deemed necessary on those revenue bonds, paying for the
cost of issuance of those revenue bonds, providing for the payment of the cost of any
guarantees, letters of credit, insurance contracts or other similar credit support or
liquidity instruments, or providing for the funding of any reserves deemed necessary in
connection with those revenue bonds and refunding or advance refunding of any such
revenue bonds and the interest and any premium thereon, pursuant to this Act. Authority
for the agreements shall conform to the requirements of the Illinois Power Agency Act.
The Authority may issue up to $4,000,000,000 aggregate principal amount of revenue bonds,
the net proceeds of which shall be loaned to the Agency pursuant to one or more Agency
loan agreements. No revenue bonds issued to refund or advance refund revenue bonds issued
under this Section may mature later than the longest maturity date of the series of bonds
being refunded. After the aggregate original principal amount of revenue bonds authorized
in this Section has been issued, the payment of any principal
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 86 -
|
|
LRB095 11114 MJR 38234 a |
amount of those revenue bonds does not authorize the issuance of
additional revenue bonds (except refunding revenue bonds). Such revenue bond
authorization is in
addition to any other bonds authorized in this Act. All bonds issued on behalf of the
Agency must be issued by the Authority and must be revenue bonds. These revenue bonds may
be taxable or tax-exempt.
(3) To provide for the funding of any reserves or other funds or accounts deemed
necessary by the Authority on behalf of the Agency in connection with its issuance of
Agency revenue bonds.
(4) To accept the pledge of any Agency revenue, including any payments thereon,
and any other property or funds of the Agency or funds made available to the Authority
through the applicable Agency loan agreement with the Agency that may be applied to such
purpose, as security for any revenue bonds or any guarantees, letters of credit,
insurance contracts, or similar credit support or liquidity instruments securing the
revenue bonds.
(5) To enter into agreements or contracts with third parties, whether
public or private, including without limitation the United States of America, the State,
or any department or agency thereof, to obtain any grants, loans, or guarantees that are
deemed necessary or desirable by the Authority. Any such guarantee, agreement, or
contract may contain terms and provisions necessary or desirable in
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 87 -
|
|
LRB095 11114 MJR 38234 a |
connection with the program, subject to the requirements established by this
Article.
(6) To charge reasonable fees to defray the cost of obtaining letters of
credit, insurance contracts, or other similar documents, and to charge such other
reasonable fees to defray the cost of trustees, depositories, paying agents, legal
counsel, bond registrars, escrow agents, and other administrative expenses. Any such fees shall be payable by the Agency,
in such amounts and at such times as the Authority shall determine.
(7) To obtain and maintain guarantees, letters of credit, insurance contracts,
or similar credit support or liquidity instruments that are deemed necessary or desirable
in connection with any revenue bonds or other obligations of the Authority for any Agency
revenue bonds.
(8) To provide technical assistance, at the request of the Agency, with respect
to the financing or refinancing for any public purpose.
(9) To sell, transfer, or otherwise defease revenue bonds issued on
behalf of the Agency at the request and authorization of the Agency.
(10) To enter into agreements or contracts with any person necessary or
appropriate to place the payment obligations of the Agency relating to revenue bonds in
whole or in part on any interest rate basis, cash flow basis, or other basis desired by
the Authority, including
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 88 -
|
|
LRB095 11114 MJR 38234 a |
without limitation agreements or contracts commonly known as interest rate
swap agreements, forward payment conversion agreements, and futures, or agreements
or contracts to exchange cash flows or a series of payments, or agreements or contracts,
including without limitation agreements or contracts commonly known as options, puts
or calls, to hedge payment, rate spread, or similar exposure; provided, that any such
agreement or contract shall not constitute an obligation for borrowed money, and shall
not be taken into account under Section 845-5 of this Act or any other debt limit of the
Authority or the State of Illinois.
(11) To make and enter into all other agreements and contracts and execute all
instruments necessary or incidental to performance of its duties and the execution of its
powers under this Article.
(12) To contract for and finance the costs of audits and to contract for and
finance the cost of project monitoring. Any such contract shall be executed only after it
has been jointly negotiated by the Authority and the Agency.
(13) To exercise such other powers as are necessary or incidental to the
foregoing.
(c) Illinois Power Agency participation. The Agency is authorized to
voluntarily participate in this program as described in the Illinois Power Agency Act. The
Authority may
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 89 -
|
|
LRB095 11114 MJR 38234 a |
issue revenue bonds on behalf of the Agency pursuant to an Agency loan agreement
entered into by the parties as set forth in the Illinois Power Agency Act. Any proceeds from
the sale of those revenue bonds shall be deposited into the Illinois Power Agency Facilities
Fund to be used by the Agency for the purposes set forth in the Illinois Power Agency Act.
(d) Pledge of revenues by the Agency. Any pledge of revenues or other moneys
made by the Agency shall be binding from the time the pledge is made. Revenues and other
moneys so pledged shall be held in the Illinois Power Agency Facilities Fund, Illinois Power
Agency Debt Service Fund, or other funds as directed by the Agency loan agreement. Revenues or
other moneys so pledged and thereafter received by the State Treasurer shall immediately be
subject to the lien of the pledge without any physical delivery thereof or further act, and
the lien of any pledge shall be binding against all parties having claims of any kind of tort,
contract, or otherwise against the Authority, irrespective of whether the parties have notice thereof. Neither
the resolution nor any other instrument by which a pledge is created need be filed or recorded
except in the records of the Authority. The State pledges to and agrees with the holders of
revenue bonds, and the beneficial owners of the revenue bonds issued on behalf of the Agency,
that the State shall not limit or restrict the rights hereby vested in the Authority to
purchase, acquire, hold, sell, or defease revenue bonds or other investments or to establish
and
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 90 -
|
|
LRB095 11114 MJR 38234 a |
collect such fees or other charges as may be convenient or necessary to produce
sufficient revenues to meet the expenses of operation of the Authority, and to fulfill the
terms of any agreement made with the holders of the revenue bonds issued by the Authority on
behalf of the Agency or in any way impair the rights or remedies of the holders of those
revenue bonds or the beneficial owners of the revenue bonds until those revenue bonds are
fully paid and discharged or provision for their payment has been made. The revenue bonds
shall not be a debt of the State, the Authority, any political subdivision thereof (other than
the Agency to the extent provided therein), any governmental aggregator as defined in the
Illinois Power Agency Act, or any local government, and neither the State, the Authority, any
political subdivision thereof (other than the Agency to the extent provided therein), any
governmental aggregator, nor any local government shall be liable thereon. The Authority shall
not have the power to pledge the credit, the revenues, or the taxing power of the State, any
political subdivision thereof (other than the Agency to the extent provided in the Agency loan
agreement relating to the revenue bonds in question), any governmental aggregator, or of any
local government, and neither the credit, the revenues, nor the taxing power of the State, any
political subdivision thereof (other than the Agency to the extent provided in the Agency
loan agreement relating to the revenue bonds in question), any governmental aggregator,
or of any local government shall be,
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 91 -
|
|
LRB095 11114 MJR 38234 a |
or shall be deemed to be, pledged to the payment of any revenue bonds, or obligations of
the Agency.
(e) Exemption from taxation. The creation of the Illinois Power Agency is in all respects
for the benefit of the people of Illinois and for the improvement of their health, safety, welfare,
comfort, and security, and its purposes are public purposes. In consideration thereof, the revenue
bonds issued on behalf of the Agency pursuant to this Act and the income from these revenue bonds
may be free from all taxation by the State or its political subdivisions, except for estate,
transfer, and inheritance taxes. The exemption from taxation provided by the preceding sentence
shall apply to the income on any revenue bonds issued on behalf of the Agency only if the Authority
with concurrence of the Agency in its sole judgment determines that the exemption enhances the
marketability of the revenue bonds or reduces the interest rates that would otherwise be borne by
the revenue bonds and that the project for which the revenue bonds will be issued will be owned by
the Agency or another governmental entity and that the project is used for public consumption. For
purposes of Section 250 of the Illinois Income Tax Act, the exemption of the Agency shall terminate
after all of the revenue bonds have been paid. The amount of the income that shall be added and
then subtracted on the Illinois income tax return of a taxpayer, subject to Section 203 of the
Illinois Income Tax Act, from federal adjusted gross income or federal taxable income in computing
Illinois base income shall
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 92 -
|
|
LRB095 11114 MJR 38234 a |
be the interest net of any bond premium amortization.
(20 ILCS 3501/845-5)
Sec. 845-5. Bond limitations.
(a) The Authority may not have outstanding at any one time bonds for any of its
corporate purposes in an aggregate principal amount exceeding $25,200,000,000, excluding bonds
issued to refund the bonds of the Authority or bonds of the Predecessor Authorities.
(b) The Authority may not have outstanding at any one time revenue bonds in an
aggregate principal amount exceeding $4,000,000,000 on behalf of the Illinois Power Agency as
set forth in Section 825-90. Any such revenue bonds issued on behalf of the Illinois Power
Agency pursuant to this Act shall not be counted against the bond authorization limit set
forth in subsection (a).
(Source: P.A. 93-205, eff. 1-1-04; 93-1101, eff. 3-31-05; 94-1068, eff. 8-1-06.)
Section 5-920. The State Finance Act is amended by adding Sections 5.680, 5.681, 5.682,
5.683, and 6z-75 and by changing Section 8h as follows:
(30 ILCS 105/5.680 new)
Sec. 5.680. The Illinois Power Agency Operations Fund.
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 93 -
|
|
LRB095 11114 MJR 38234 a |
(30 ILCS 105/5.681 new)
Sec. 5.681. The Illinois Power Agency Facilities Fund.
(30 ILCS 105/5.682 new)
Sec. 5.682. The Illinois Power Agency Debt Service Fund.
(30 ILCS 105/5.683 new)
Sec. 5.683. The Illinois Power Agency Trust Fund.
(30 ILCS 105/6z-75 new)
Sec. 6z-75. The Illinois Power Agency Trust Fund.
(a) Creation. The Illinois Power Agency Trust Fund is created as a special fund
in the State treasury. The State Treasurer shall be the custodian of the Fund. Amounts in
the Fund, both principal and interest not appropriated, shall be invested as provided by
law.
(b) Funding and investment.
(1) The Illinois Power Agency Trust Fund may accept, receive, and administer any
grants, loans, or other funds made available to it by any source. Any such funds received
by the Fund shall not be considered income, but shall be added to the principal of the
Fund.
(2) The investments of the Fund shall be managed by the Illinois State Board of
Investment, for the purpose of obtaining a total return on investments for the long term,
as provided for under Article 22A of the Illinois Pension
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 94 -
|
|
LRB095 11114 MJR 38234 a |
Code.
(c) Investment proceeds. Subject to the provisions of subsection (d) of this Section,
the General Assembly may annually appropriate from the Illinois Power Agency Trust Fund to the
Illinois Power Agency Operations Fund an amount not to exceed 90% of the annual investment
income earned by the Fund to the Illinois Power Agency. Any investment income not appropriated
by the General Assembly in a given fiscal year shall be added to the principal of the Fund,
and thereafter considered a part thereof and not subject to appropriation as income earned by
the Fund.
(d) Expenditures.
(1) During
Fiscal Year 2008 and Fiscal Year 2009, the
General Assembly shall not appropriate any of the investment income earned by the
Illinois Power Agency Trust Fund to the Illinois Power Agency.
(2)
During Fiscal Year 2010 and Fiscal Year 2011, the General Assembly
shall appropriate a portion of the investment income earned by the Illinois Power Agency
Trust Fund to repay to the General Revenue Fund of the State of Illinois those amounts,
if any, appropriated from the General Revenue Fund for the operation of the Illinois
Power Agency during Fiscal Year 2008 and Fiscal Year 2009, so that at the end of Fiscal
Year 2011, the entire amount, if any, appropriated from the General Revenue Fund for the
operation of the Illinois Power Agency during Fiscal Year
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 95 -
|
|
LRB095 11114 MJR 38234 a |
2008 and Fiscal Year 2009 will be repaid in full to the General Revenue Fund.
(3) In Fiscal Year 2012 and thereafter, the General Assembly shall consider the
need to balance its appropriations from the investment income earned by the Fund with the
need to provide for the growth of the principal of the Illinois Power Agency Trust Fund
in order to ensure that the Fund is able to produce sufficient investment income to fund
the operations of the Illinois Power Agency in future years.
(4) If the Illinois Power Agency shall cease operations, then, unless otherwise
provided for by law or appropriation, the principal and any investment income earned by
the Fund shall be transferred into the Supplemental Low-Income Energy Assistance Program
(LIHEAP) Fund under Section 13 of the Energy Assistance Act of 1989.
(e) Implementation. The provisions of this Section shall
not be operative until the Illinois Power Agency Trust Fund has accumulated a principal
balance of $25,000,000.
(30 ILCS 105/8h)
Sec. 8h. Transfers to General Revenue Fund.
(a) Except
as otherwise provided in this Section and Section 8n of this
Act, and (c) ,(d),or (e), notwithstanding any other State law to the contrary, the Governor may, through
June 30, 2007, from time to time direct the State Treasurer and
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 96 -
|
|
LRB095 11114 MJR 38234 a |
Comptroller to transfer a specified sum from any fund held by the State Treasurer to the
General Revenue Fund in order to help defray the States operating costs for the fiscal year.
The total transfer under this Section from any fund in any fiscal year shall not exceed the
lesser of (i) 8% of the revenues to be deposited into the fund during that fiscal year or (ii)
an amount that leaves a remaining fund balance of 25% of the July 1 fund balance of that
fiscal year. In fiscal year 2005 only, prior to calculating the July 1, 2004 final balances,
the Governor may calculate and direct the State Treasurer with the Comptroller to transfer
additional amounts determined by applying the formula authorized in Public Act 93-839 to the
funds balances on July 1, 2003. No transfer may be made from a fund under this Section that
would have the effect of reducing the available balance in the fund to an amount less than the
amount remaining unexpended and unreserved from the total appropriation from that fund
estimated to be expended for that fiscal year. This Section does not apply to any funds that
are restricted by federal law to a specific use, to any funds in the Motor Fuel Tax Fund, the
Intercity Passenger Rail Fund, the Hospital Provider Fund, the Medicaid Provider Relief Fund,
the Teacher Health Insurance Security Fund, the Reviewing Court Alternative Dispute Resolution
Fund, the Voters Guide Fund, the Foreign Language Interpreter Fund,
the Lawyers Assistance Program Fund, the Supreme Court Federal Projects Fund, the Supreme
Court Special State Projects Fund,
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 97 -
|
|
LRB095 11114 MJR 38234 a |
the Supplemental Low-Income Energy Assistance Fund, the Good Samaritan Energy Trust Fund, the
Low-Level Radioactive Waste Facility Development and Operation Fund, the Horse Racing Equity
Trust Fund, or the Hospital Basic Services Preservation Fund, or to any funds to which
subsection (f) of Section 20-40 of the Nursing and Advanced Practice Nursing Act applies. No
transfers may be made under this Section from the Pet Population Control Fund. Notwithstanding
any other provision of this Section, for fiscal year 2004, the total transfer under this
Section from the Road Fund or the State Construction Account Fund shall not exceed the lesser
of (i) 5% of the revenues to be deposited into the fund during that fiscal year or (ii) 25% of
the beginning balance in the fund. For fiscal year 2005 through fiscal year 2007, no amounts
may be transferred under this Section from the Road Fund, the State Construction Account Fund,
the Criminal Justice Information Systems Trust Fund, the Wireless Service Emergency Fund, or
the Mandatory Arbitration Fund.
In determining the available balance in a fund, the Governor may include receipts,
transfers into the fund, and other resources anticipated to be available in the fund in that
fiscal year.
The State Treasurer and Comptroller shall transfer the amounts designated under this
Section as soon as may be practicable after receiving the direction to transfer from the
Governor.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 98 -
|
|
LRB095 11114 MJR 38234 a |
(a-5) Transfers directed to be made under this Section on or before February 28, 2006
that are still pending on May 19, 2006 (the effective date of Public Act
94-774) this amendatory Act of the 94th General Assembly shall be redirected as provided
in Section 8n of this Act.
(b) This Section does not apply to: (i) the Ticket For The Cure Fund; (ii) any fund
established under the Community Senior Services and Resources Act; or (iii) on or after
January 1, 2006 (the effective date of Public Act 94-511), the Child Labor and Day and
Temporary Labor Enforcement Fund.
(c) This Section does not apply to the Demutualization Trust Fund established
under the Uniform Disposition of Unclaimed Property Act.
(d) This Section does not apply to moneys set aside in the Illinois State Podiatric
Disciplinary Fund for podiatric scholarships and residency programs under the Podiatric
Scholarship and Residency Act.
(e) Subsection (a) does not apply to, and no transfer may be made under this Section
from, the Pension Stabilization Fund.
(f) Subsection (a) does not apply to, and no transfer may be made under this Section
from, the Illinois Power Agency Operations Fund, the Illinois Power Agency Facilities Fund,
the Illinois Power Agency Debt Service Fund, and the Illinois Power Agency Trust Fund.
(Source: P.A. 93-32, eff. 6-20-03; 93-659, eff. 2-3-04; 93-674,
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 99 -
|
|
LRB095 11114 MJR 38234 a |
eff. 6-10-04; 93-714, eff. 7-12-04; 93-801, eff. 7-22-04; 93-839, eff. 7-30-04; 93-1054, eff.
11-18-04; 93-1067, eff. 1-15-05; 94-91, eff. 7-1-05; 94-120, eff. 7-6-05; 94-511, eff. 1-1-06;
94-535, eff. 8-10-05; 94-639, eff. 8-22-05; 94-645, eff. 8-22-05; 94-648, eff. 1-1-06; 94-686,
eff. 11-2-05; 94-691, eff. 11-2-05; 94-726, eff. 1-20-06; 94-773, eff. 5-18-06; 94-774, eff.
5-19-06; 94-804, eff. 5-26-06; 94-839,
eff. 6-6-06; revised 6-19-06.)
Section 5-925. The Illinois Procurement Code is amended by changing Sections 1-10,
1-15.15, 1-15.25, 15-1, 20-10, 30-20, 30-22, 30-25, 35-15, 35-20, 35-25, 35-30, 35-35, 35-40,
and 50-70 as follows:
(30 ILCS 500/1-10)
Sec. 1-10. Application.
(a) This Code applies only to procurements for which contractors were first solicited on
or after July 1, 1998. This Code shall not be construed to affect or impair any contract, or
any provision of a contract, entered into based on a solicitation prior to the implementation
date of this Code as described in Article 99, including but not limited to any covenant
entered into with respect to any revenue bonds or similar instruments. All procurements for
which contracts are solicited between the effective date of Articles 50 and 99 and July 1,
1998 shall be substantially in accordance with this
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 100 -
|
|
LRB095 11114 MJR 38234 a |
Code and its intent.
(b) This Code shall apply regardless of the source of the funds with which the contracts
are paid, including federal assistance moneys. This Code shall not apply to:
(1) Contracts between the State and its political subdivisions or other
governments, or between State governmental bodies except as specifically
provided in this Code.
(2) Grants, except for the filing requirements of Section 20-80.
(3) Purchase of care.
(4) Hiring of an individual as employee and not as an independent contractor,
whether pursuant to an employment code or policy or by contract directly with that
individual.
(5) Collective bargaining contracts.
(6) Purchase of real estate.
(7) Contracts necessary to prepare for anticipated litigation, enforcement actions,
or investigations, provided that the chief legal counsel to the Governor shall give his
or her prior approval when the procuring agency is one subject to the jurisdiction of the
Governor, and provided that the chief legal counsel of any other procuring entity subject
to this Code shall give his or her prior approval when the procuring entity is not one
subject to the jurisdiction of the Governor.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 101 -
|
|
LRB095 11114 MJR 38234 a |
(8) Contracts for services to Northern Illinois University by a person, acting as an
independent contractor, who is qualified by education, experience, and technical ability
and is selected by negotiation for the purpose of providing non-credit educational
service activities or products by means of specialized programs offered by the
university.
(9) Procurement expenditures by the Illinois Conservation Foundation when only
private funds are used.
(c) This Code does not apply to the electric power procurement process provided
for under Section 1-75 of the Illinois Power Agency Act and Section 16-111.5 of the Public
Utilities Act.
(Source: P.A. 91-627, eff. 8-19-99; 91-904, eff. 7-6-00; 92-797, eff. 8-15-02.)
(30 ILCS 500/1-15.15)
Sec. 1-15.15. Chief Procurement Officer. Chief Procurement Officer
means:
(1) for procurements for construction and construction-related services committed by law
to the jurisdiction or responsibility of the Capital Development Board, the executive director
of the Capital Development Board.
(2) for procurements for all construction,
construction-related services, operation of any facility, and the provision of any service or
activity committed by law to
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 102 -
|
|
LRB095 11114 MJR 38234 a |
the jurisdiction or responsibility of the Illinois Department of Transportation,
including the direct or reimbursable expenditure of all federal funds for which the Department
of Transportation is responsible or accountable for the use thereof in accordance with federal
law, regulation, or procedure, the Secretary of Transportation.
(3) for all procurements made by a public institution of higher education, a
representative designated by the Governor.
(4) for all procurements made by the Illinois Power Agency, the Director of the
Illinois Power Agency.
(5) (4) for all other procurements, the Director of the
Department of Central Management Services.
(Source: P.A. 90-572, eff. 2-6-98.)
(30 ILCS 500/1-15.25)
Sec. 1-15.25. Construction agency. Construction agency means the Capital
Development Board for construction or remodeling of State-owned facilities; the Illinois
Department of Transportation for construction or maintenance of roads, highways, bridges, and
airports; the Illinois Toll Highway Authority for construction or maintenance of toll
highways; the Illinois Power Agency for construction, maintenance, and expansion of
Agency-owned facilities, as defined in Section 1-10 of the Illinois Power Agency Act; and
any other State agency entering into construction contracts as authorized by law or by
delegation from the chief procurement officer.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 103 -
|
|
LRB095 11114 MJR 38234 a |
(Source: P.A. 90-572, eff. 2-6-98.)
(30 ILCS 500/15-1)
Sec. 15-1. Publisher. The Department of Central Management Services is the State agency
responsible for publishing its volumes of the Illinois Procurement Bulletin. The Capital
Development Board is responsible for publishing its volumes of the Illinois Procurement
Bulletin. The Department of Transportation is responsible for publishing its volumes of the
Illinois Procurement Bulletin. The higher education chief procurement officer is responsible
for publishing the higher education volumes of the Illinois Procurement Bulletin. The
Illinois Power Agency is the State agency responsible for publishing its volumes of the
Illinois Procurement Bulletin.
Each volume of the Illinois Procurement Bulletin shall be available electronically and
may be available in print. References in this Code to the publication and distribution of the
Illinois Procurement Bulletin include both its print and electronic formats.
(Source: P.A.
90-572, eff. date See Sec. 99-5.)
(30 ILCS 500/20-10)
Sec. 20-10. Competitive sealed bidding.
(a) Conditions for use. All contracts shall be awarded by competitive sealed bidding
except as otherwise provided in Section 20-5.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 104 -
|
|
LRB095 11114 MJR 38234 a |
(b) Invitation for bids. An invitation for bids shall be
issued and shall include a purchase description and the
material contractual terms and conditions applicable to the procurement.
(c) Public notice. Public notice of the invitation for bids shall be published in the
Illinois Procurement Bulletin at least 14 days before the date set in the invitation for the
opening of bids.
(d) Bid opening. Bids shall be opened publicly in the presence of one or more witnesses
at the time and place designated in the invitation for bids. The name of each bidder, the
amount of each bid, and other relevant information as may be specified by rule shall be
recorded. After the award of the contract, the winning bid and the record of each unsuccessful
bid shall be open to public inspection.
(e) Bid acceptance and bid evaluation. Bids shall be unconditionally accepted without
alteration or correction, except as authorized in this Code. Bids shall be evaluated based on
the requirements set forth in the invitation for bids, which may include criteria to determine
acceptability such as inspection, testing, quality, workmanship, delivery, and suitability for
a particular purpose. Those criteria that will affect the bid price and be considered in
evaluation for award, such as discounts, transportation costs, and total or life cycle costs,
shall be objectively measurable. The invitation for bids shall set forth the evaluation
criteria to be used.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 105 -
|
|
LRB095 11114 MJR 38234 a |
(f) Correction or withdrawal of bids. Correction or withdrawal of inadvertently
erroneous bids before or after award, or cancellation of awards of contracts based on bid
mistakes, shall be permitted in accordance with rules. After bid opening, no changes in bid
prices or other provisions of bids prejudicial to the interest of the State or fair
competition shall be permitted. All decisions to permit the correction or withdrawal of bids
based on bid mistakes shall be supported by written determination made by a State purchasing
officer.
(g) Award. The contract shall be awarded with reasonable promptness by written notice to
the lowest responsible and responsive bidder whose bid meets the requirements and criteria set
forth in the invitation for bids, except when a State purchasing officer determines it is not
in the best interest of the State and by written explanation determines another bidder shall
receive the award. The explanation shall appear in the appropriate volume of the Illinois
Procurement Bulletin.
(h) Multi-step sealed bidding. When it is considered impracticable to initially prepare a
purchase description to support an award based on price, an invitation for bids may be issued
requesting the submission of unpriced offers to be followed by an invitation for bids limited
to those bidders whose offers have been qualified under the criteria set forth in the first
solicitation.
(i) Alternative procedures. Notwithstanding any other
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 106 -
|
|
LRB095 11114 MJR 38234 a |
provision of this Act to the contrary, the Director of the Illinois Power Agency
may create alternative bidding procedures to be used in procuring professional services under
Section 1-75 (a) of the Illinois Power Agency Act and
Section 16 -111. 5 (c) of the Public
Utilities Act. These alternative procedures shall be set forth together with the other
criteria contained in the invitation for bids, and shall appear in the appropriate volume of
the Illinois Procurement Bulletin.
(Source: P.A. 90-572, eff. date See Sec. 99-5.)
(30 ILCS 500/30-20)
Sec. 30-20. Prequalification.
(a) The Capital Development Board shall promulgate rules for the development of
prequalified supplier lists for construction and construction-related professional services
and the periodic updating of those lists. Construction and
construction-related professional services contracts over $25,000 may be awarded
to any qualified suppliers.
(b) The Illinois Power Agency shall promulgate rules for the development of
prequalified supplier lists for construction and construction-related professional services
and the periodic updating of those lists. Construction and construction related professional
services contracts over $25,000 may be awarded to any qualified suppliers, pursuant to a
competitive bidding process.
(Source: P.A. 90-572, eff. date See Sec. 99-5.)
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 107 -
|
|
LRB095 11114 MJR 38234 a |
(30 ILCS 500/30-22)
Sec. 30-22. Construction contracts; responsible bidder requirements. To be
considered a responsible bidder on a construction contract for purposes of this Code, a bidder
must comply with all of the following requirements and must present satisfactory evidence of
that compliance to the appropriate construction agency:
(1) The bidder must comply with all applicable laws concerning the bidders
entitlement to conduct business in Illinois.
(2) The bidder must comply with all applicable provisions of the
Prevailing Wage Act.
(3) The bidder must comply with Subchapter VI (Equal Employment Opportunities) of
Chapter 21 of Title 42 of the United States Code (42 U.S.C. 2000e and following) and with
Federal Executive Order No. 11246 as amended by Executive
Order No. 11375.
(4) The bidder must have a valid Federal Employer
Identification Number or, if an individual, a valid Social
Security Number.
(5) The bidder must have a valid certificate of
insurance showing the following coverages: general liability,
professional liability, product liability, workers compensation, completed
operations, hazardous occupation, and automobile.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SB1592ham005
|
|
- 108 -
|
|
LRB095 11114 MJR 38234 a |
(6) The bidder and all bidders subcontractors must participate in applicable
apprenticeship and training programs approved by and registered with the United States
Department of Labors Bureau of Apprenticeship and Training.
(7) For contracts with the Illinois Power Agency, the Director of the Illinois
Power Agency may establish additional requirements for responsible bidders. These
additional requirements, if established, shall be set forth together with the other
criteria contained in the invitation for bids, and shall appear in the appropriate volume
of the Illinois Procurement Bulletin.
The provisions of this Section shall not apply to federally funded construction projects
if such application would jeopardize the receipt or use of federal funds in support of such a
project.
(Source: P.A. 93-642, eff. 6-1-04.)
(30 ILCS 500/30-25)
Sec. 30-25. Retention of a percentage of contract price. Whenever any contract
entered into by a construction agency for the repair, remodeling, renovation, or construction
of a building or structure, for the construction or maintenance of a highway, as those terms
are defined in Article 2 of the Illinois Highway Code, for the construction or maintenance
of facilities as that term is defined under Section 1-10 of the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 109 -
|
|
LRB095 11114 MJR 38234 a |
Illinois Power Agency Act, or for the reclamation of abandoned lands as those terms are
defined in Article I of the Abandoned Mined Lands and Water Reclamation Act provides for the
retention of a percentage of the contract price until final completion and acceptance of the work,
upon the request of the contractor and with the approval of the construction agency the amount so
retained may be deposited under a trust agreement with an Illinois bank or financial institution of
the contractors choice and subject to the approval of the construction agency. The contractor
shall receive any interest on the deposited amount. Upon application by the contractor, the trust
agreement must contain, at a minimum, the following provisions:
(1) the amount to be deposited
subject to the trust;
(2) the terms and conditions of payment in case of default by the contractor;
(3) the termination of the trust agreement upon completion of the contract; and
(4) the contractor
shall be responsible for obtaining the written consent of the bank trustee and for any costs or
service fees.
The trust agreement may, at the discretion of the construction agency and upon request of the
contractor, become effective at the time of the first partial payment in
accordance with existing statutes and rules. (Source: P.A. 90-572, eff. date See Sec.
99-5.)
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 110 -
|
|
LRB095 11114 MJR 38234 a |
(30 ILCS 500/35-15)
Sec. 35-15. Prequalification.
(a) The Director of Central Management Services, the Illinois Power Agency, and the
higher education chief procurement officer shall each develop appropriate and reasonable
prequalification standards and categories of professional and artistic services.
(b) The prequalifications and categorizations shall be submitted to the Procurement Policy
Board and published for public comment prior to their submission to the Joint Committee on
Administrative Rules for approval.
(c) The Director of Central Management Services, the Illinois Power Agency, and the
higher education chief procurement officer shall each also assemble and maintain a comprehensive
list of prequalified and categorized businesses and persons.
(d) Prequalification shall not be used to bar or prevent any qualified business or person for
bidding or responding to invitations for bid or proposal.
(Source: P.A. 90-572, eff. date See Sec. 99-5.)
(30 ILCS 500/35-20)
Sec. 35-20. Uniformity in procurement.
(a) The Director of Central Management Services, the Illinois Power Agency, and the
higher education chief
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 111 -
|
|
LRB095 11114 MJR 38234 a |
procurement officer shall each develop, cause to be printed, and distribute uniform documents for
the solicitation, review, and acceptance of all professional and artistic services.
(b) All chief procurement officers, State purchasing officers, and their designees shall use
the appropriate uniform procedures and forms specified in this Code for all professional and
artistic services.
(c) These forms shall include in detail, in writing, at least:
(1) a description of the goal to be achieved;
(2) the services to be performed;
(3) the need for the service;
(4) the qualifications that are necessary; and
(5) a plan for post-performance review.
(Source: P.A. 90-572, eff. date See Sec.
99-5.)
(30 ILCS 500/35-25)
Sec. 35-25. Uniformity in contract.
(a) The Director of Central Management Services, the Illinois Power Agency, and the
higher education chief procurement officer shall each develop, cause to be printed, and distribute
uniform documents for the contracting of professional and artistic services.
(b) All chief procurement officers, State purchasing officers, and their designees shall use
the appropriate uniform contracts and forms in contracting for all professional and
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 112 -
|
|
LRB095 11114 MJR 38234 a |
artistic services.
(c) These contracts and forms shall include in detail, in writing, at least:
(1) the detail
listed in subsection (c) of Section 35-20;
(2) the duration of the contract, with a schedule of
delivery, when applicable;
(3) the method for charging and measuring cost (hourly, per day, etc.);
(4) the rate of remuneration; and
(5) the maximum price.
(Source: P.A. 90-572, eff. date See Sec. 99-5.)
(30 ILCS 500/35-30)
Sec. 35-30. Awards.
(a) All State contracts for professional and artistic services, except as provided in this
Section, shall be awarded using the competitive request for proposal process outlined in this
Section.
(b) For each contract offered, the chief procurement officer, State purchasing officer, or his
or her designee shall use the appropriate standard solicitation forms available from the Department
of Central Management Services, the Illinois Power Agency, or the higher education chief
procurement officer.
(c) Prepared forms shall be submitted to the Department of
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 113 -
|
|
LRB095 11114 MJR 38234 a |
Central Management Services, the Illinois Power Agency, or the higher education chief
procurement officer, whichever is appropriate, for publication in its Illinois Procurement Bulletin
and circulation to the Department of Central Management Services or the higher education chief
procurement officers list of prequalified vendors. Notice of the offer or request for proposal
shall appear at least 14 days before the response to the offer is due.
(d) All interested respondents shall return their responses to the Department of Central
Management Services, the Illinois Power Agency, or the higher education chief procurement
officer, whichever is appropriate, which shall open and record them. The Department or higher
education chief procurement officer then shall forward the responses, together with any information
it has available about the qualifications and other State work of the respondents.
(e) After evaluation, ranking, and selection, the responsible chief procurement officer, State
purchasing officer, or his or her designee shall notify the Department of Central Management
Services, the Illinois Power Agency, or the higher education chief procurement officer,
whichever is appropriate, of the successful respondent and shall forward a copy of the signed
contract for the Departments, Agencys, or higher education chief procurement officers
file. The Department, Agency, or higher education chief procurement officer shall publish
the names of the responsible procurement
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 114 -
|
|
LRB095 11114 MJR 38234 a |
decision-maker, the agency letting the contract, the successful respondent, a contract reference,
and value of the let contract in the next appropriate volume of the Illinois Procurement Bulletin.
(f) For all professional and artistic contracts with annualized value that exceeds $25,000,
evaluation and ranking by price are required. Any chief procurement officer or State purchasing
officer, but not their designees, may select an offeror other than the lowest bidder by price. In
any case, when the contract exceeds the $25,000 threshold
threshhold and the lowest bidder is not selected, the chief
procurement officer or the State purchasing officer shall forward together with the contract notice
of who the low bidder was and a written decision as to why another was selected to the Department
of Central Management Services, the Illinois Power Agency, or the higher education chief
procurement officer, whichever is appropriate. The Department, Agency, or higher education
chief procurement officer shall publish as provided in subsection (e) of Section 35-30, but shall
include notice of the chief procurement officers or State purchasing officers written decision.
(g) The Department of Central Management Services, the Illinois Power Agency, and
higher education chief procurement officer may each refine, but not contradict, this Section by
promulgating rules for submission to the Procurement Policy Board and then to the Joint Committee
on Administrative Rules.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 115 -
|
|
LRB095 11114 MJR 38234 a |
Any refinement shall be based on the principles and procedures of the federal Architect-Engineer
Selection Law, Public Law 92-582 Brooks Act, and the Architectural, Engineering, and Land Surveying
Qualifications Based Selection Act; except that pricing shall be an integral part of the selection
process.
(Source: P.A. 90-572, eff. date See Sec. 99-5; revised 10-19-05.)
(30 ILCS 500/35-35)
Sec. 35-35. Exceptions.
(a) Exceptions to Section 35-30 are allowed for sole source procurements, emergency
procurements, and at the discretion of the chief procurement officer or the State purchasing
officer, but not their designees, for professional and artistic contracts that are nonrenewable,
one year or less in duration, and have a value of less than $20,000.
(b) All exceptions granted under this Article must still be submitted to the Department of
Central Management Services, the Illinois Power Agency, or the higher education chief
procurement officer, whichever is appropriate, and published as provided for in subsection (f) of
Section 35-30, shall name the authorizing chief procurement officer or State purchasing officer,
and shall include a brief explanation of the reason
for the exception.
(Source: P.A. 90-572, eff. date See Sec. 99-5.)
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 116 -
|
|
LRB095 11114 MJR 38234 a |
(30 ILCS 500/35-40)
Sec. 35-40. Subcontractors.
(a) Any contract granted under this Article shall state whether the services of a
subcontractor will be used. The contract shall include the names and addresses of all
subcontractors and the expected amount of money each will receive under the contract.
(b) If at any time during the term of a contract, a contractor adds or changes any
subcontractors, he or she shall promptly notify, in writing, the Department of Central Management
Services, the Illinois Power Agency, or the higher education chief procurement officer,
whichever is appropriate, and the responsible chief procurement officer, State purchasing officer,
or their designee of the names and addresses and the expected amount of money each new or replaced
subcontractor will receive.
(Source: P.A. 90-572, eff. date See Sec. 99-5.)
(30 ILCS 500/50-70)
Sec. 50-70. Additional provisions. This Code is subject to applicable provisions of the
following Acts:
(1) Article 33E of the Criminal Code of 1961;
(2) the Illinois Human Rights Act;
(3) the Discriminatory Club Act;
(4) the Illinois Governmental Ethics Act;
(5) the State Prompt
Payment Act;
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 117 -
|
|
LRB095 11114 MJR 38234 a |
(6) the Public Officer Prohibited Activities Act; and
(7) the Drug Free Workplace Act; and .
(8) the Illinois Power Agency Act.
(Source: P.A. 90-572, eff. 2-6-98.)
Section 5-930. The State Property Control Act is amended by changing Section 1.02 as follows:
(30 ILCS 605/1.02) (from Ch. 127, par. 133b3)
Sec. 1.02. Property means State owned property
and includes all real estate, with the exception of rights of way for State water resource and
highway improvements, traffic signs and traffic signals, and with the exception of common school
property; and all tangible personal property with the exception of properties specifically exempted
by the administrator, provided that any property originally classified as real property which has
been detached from its structure shall be classified as personal property.
Property does not include property owned by the Illinois Medical District Commission and
leased or occupied by others for purposes permitted under the Illinois Medical District Act.
Property also does not include property owned and held by the Illinois Medical District
Commission for redevelopment.
Property does not include property described under Section 5 of Public Act 92-371 with
respect to depositing the net proceeds from the sale or exchange of the property as
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 118 -
|
|
LRB095 11114 MJR 38234 a |
provided in Section 10 of that Act.
Property does not include that property described under Section 5 of Public Act
94-405 this amendatory Act of the 94th General Assembly.
Property does not include real property owned or operated by the Illinois Power Agency
or any electricity generated on that real property or by the Agency. For purposes of this
subsection only, real property includes any interest in land, all buildings and improvements
located thereon, and all fixtures and equipment used or designed for the production and
transmission of electricity located thereon.
(Source: P.A. 94-405, eff. 8-2-05; revised 8-31-05.)
Section 5-935. The Public Utilities Act is amended by changing Sections 3-105, 4-404, 4-502,
8-403, 16-101A, 16-111, and 16-113 and by adding Sections 12-103, 16-103.1, 16-111.5,
16-111.5A, 16-111.6, 16-126.1, and 16-127 as follows:
(220 ILCS 5/3-105) (from Ch. 111 2/3, par. 3-105)
Sec. 3-105. Public utility.
(a) Public utility means and includes, except where otherwise expressly provided in this
Section, every corporation, company, limited liability company, association, joint stock company or
association, firm, partnership or individual, their lessees, trustees, or receivers appointed by
any court whatsoever that owns, controls, operates or manages,
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 119 -
|
|
LRB095 11114 MJR 38234 a |
within this State, directly or indirectly, for public use, any plant, equipment or property used or
to be used for or in connection with, or owns or controls any franchise, license, permit or right
to engage in:
(1) a. the production, storage, transmission,
sale, delivery or furnishing of heat, cold, power, electricity, water, or light, except
when used solely for communications purposes;
(2) b. the disposal of sewerage; or
(3) c. the conveyance of oil or gas by pipe
line.
(b) Public utility does not include, however:
(1) . public utilities that are owned and
operated by any political subdivision, public institution of higher education or municipal
corporation of this State, or public utilities that are owned by such political subdivision,
public institution of higher education, or municipal corporation and operated by any of its
lessees or operating agents;
(2) . water companies which are purely
mutual concerns, having no rates or charges for services, but paying the operating expenses
by assessment upon the members of such a company and no other person;
(3) . electric cooperatives as defined in
Section 3-119;
(4) . the following natural gas
cooperatives:
(A) residential natural gas cooperatives that are
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 120 -
|
|
LRB095 11114 MJR 38234 a |
not-for-profit corporations established for the purpose of administering and operating, on a
cooperative basis, the furnishing of natural gas to residences for the benefit of their members
who are residential consumers of natural gas. For entities qualifying as residential natural gas
cooperatives and recognized by the Illinois Commerce Commission as such, the State shall
guarantee legally binding contracts entered into by residential natural gas cooperatives for the
express purpose of acquiring natural gas supplies for their members. The Illinois Commerce
Commission shall establish rules and regulations providing for such guarantees. The total
liability of the State in providing all such guarantees shall not at any time exceed $1,000,000,
nor shall the State provide such a guarantee to a residential natural gas cooperative for more
than 3 consecutive years; and
(B) natural gas cooperatives that are not-for-profit corporations operated for the purpose of
administering, on a cooperative basis, the furnishing of natural gas for the benefit of their
members and that, prior to 90 days after the effective date of this amendatory Act of the 94th
General Assembly, either had acquired or had entered into an asset purchase agreement to acquire
all or substantially all of the operating assets of a public
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 121 -
|
|
LRB095 11114 MJR 38234 a |
utility or natural gas cooperative with the intention of operating those assets as a
natural gas cooperative;
(5) . sewage disposal companies which
provide sewage disposal services on a mutual basis without establishing rates or
charges for services, but paying the operating expenses by assessment upon the members
of the company and no others;
(6) . (Blank);
(7) . cogeneration facilities, small power
production facilities, and other qualifying facilities, as defined in the Public Utility
Regulatory Policies Act and regulations promulgated thereunder, except to the extent State
regulatory jurisdiction and action is required or authorized by federal law, regulations,
regulatory decisions or the decisions of federal or State courts of competent jurisdiction;
(8) . the ownership or operation of a
facility that sells compressed natural gas at retail to the public for use only as a motor
vehicle fuel and the selling of compressed natural gas at retail to the public for use only
as a motor vehicle fuel; and
(9) . alternative retail electric suppliers
as defined in Article XVI; and .
(10) the Illinois Power Agency.
(Source: P.A. 94-738, eff. 5-4-06.)
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 122 -
|
|
LRB095 11114 MJR 38234 a |
(220 ILCS 5/4-404)
Sec. 4-404. Protection of confidential and proprietary information. The Commission shall provide
adequate protection for confidential and proprietary information furnished, delivered or filed by
any person, corporation or other entity, including proprietary information provided to the
Commission by the Illinois Power Agency.
(Source: P.A. 90-561, eff. 12-16-97.)
(220 ILCS 5/4-502)
Sec. 4-502. Small public utility or telecommunications carrier; acquisition by capable
utility; Commission determination; procedure.
(a) The Commission may provide for the acquisition of a small public utility or
telecommunications carrier by a capable public utility or telecommunications carrier, if the
Commission, after notice and an opportunity to be heard, determines one or more of the following:
(1) the small public utility or telecommunications carrier is failing to provide safe,
adequate, or reliable service;
(2) the small public utility or telecommunications carrier no longer possesses sufficient
technical, financial, or managerial resources and abilities to provide the service or services for
which its certificate was originally granted;
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 123 -
|
|
LRB095 11114 MJR 38234 a |
(3) the small public utility or telecommunications carrier has been actually or effectively
abandoned by its owners or operators;
(4) the small public utility or telecommunications carrier has defaulted on a bond, note, or
loan issued or guaranteed by a department, office, commission, board, authority, or other unit of
State government;
(5) the small public utility or telecommunications carrier has wilfully failed to comply with
any provision of this Act, any other provision of State or federal law, or any rule, regulation,
order, or decision of the Commission; or
(6) the small public utility or telecommunications carrier has wilfully allowed property owned
or controlled by it to be used in violation of this Act, any other provision of State or federal
law, or any rule, regulation, order, or decision of the Commission.
(b) As used in this Section, small public utility or telecommunications carrier means a
public utility or telecommunications carrier that regularly provides service to fewer than 7,500
customers.
(c) In making a determination under subsection (a), the Commission shall consider all of the
following:
(1) The financial, managerial, and technical ability of the small public utility or
telecommunications carrier.
(2) The financial, managerial, and technical ability
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 124 -
|
|
LRB095 11114 MJR 38234 a |
of all proximate public utilities or telecommunications carriers providing the same type of
service.
(3) The expenditures that may be necessary to make improvements to the small public utility
or telecommunications carrier to assure compliance with applicable statutory and regulatory
standards concerning the adequacy, efficiency, safety, or reasonableness of utility service.
(4) The expansion of the service territory of the acquiring capable public utility or
telecommunications carrier to include the service area of the small public utility or
telecommunications carrier to be acquired.
(5) Whether the rates charged by the acquiring capable public utility or telecommunications
carrier to its acquisition customers will increase unreasonably because of the acquisition.
(6) Any other matter that may be relevant.
(d) For the purposes of this Section, a capable public utility or telecommunications carrier
means a public utility, as defined under Section 3-105 of this Act, including those entities listed
in items (1) through (5) of subsection (b) subsections 1 through
5 of Section 3-105, or a telecommunications carrier, as defined under Section 13-202
of this Act, including those entities listed in subsections (a) and (b) of Section 13-202, that:
(1) regularly provides the same type of service as the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 125 -
|
|
LRB095 11114 MJR 38234 a |
small public utility or telecommunications carrier, to 7,500 or more customers, and provides safe,
adequate, and reliable service to those customers; however, public utility or telecommunications
carrier that would otherwise be a capable public utility except for the fact that it has fewer than
7,500 customers may elect to be a capable public utility or telecommunications carrier for the
purposes of this Section regardless of the number of its customers and regardless of whether or not
it is proximate to the small public utility or telecommunications carrier to be acquired;
(2) is not an affiliated interest of the small public utility or telecommunications carrier;
(3) agrees to acquire the small public utility or telecommunications carrier that is the subject of
the proceeding, under the terms and conditions contained in the Commission order approving the
acquisition; and
(4) is financially, managerially, and technically capable of acquiring and operating the small
public utility or telecommunications carrier in compliance with applicable statutory and regulatory
standards.
(e) The Commission may, on its own motion or upon petition, initiate a proceeding in order to
determine whether an order of acquisition should be entered. Upon the establishment of a prima
facie case that the acquisition of the small public utility or telecommunications carrier would be
in the public
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 126 -
|
|
LRB095 11114 MJR 38234 a |
interest and in compliance with the provisions of this Section all of the following apply:
(1) The small public utility or telecommunications carrier that is the subject of the acquisition
proceedings has the burden of proving its ability to render safe, adequate, and reliable service at
just and reasonable rates.
(2) The small public utility or telecommunications carrier that is the subject of the
acquisition proceedings may present evidence to demonstrate the practicality and feasibility
of the following alternatives to acquisition:
(A) the reorganization of the small public utility or telecommunications carrier under
new management;
(B) the entering of a contract with another public utility, telecommunications carrier,
or a management or service company to operate the small public utility or telecommunications
carrier;
(C) the appointment of a receiver to operate the small public utility or
telecommunications carrier, in accordance with the provisions of Section 4-501 of this Act;
or
(D) the merger of the small public utility or telecommunications carrier with one or
more other public utilities or telecommunications carriers.
(3) A public utility or
telecommunications carrier that desires to acquire the small public utility or
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 127 -
|
|
LRB095 11114 MJR 38234 a |
telecommunications carrier has the burden of proving that it is a capable public utility or
telecommunications carrier.
(f) Subject to the determinations and considerations required by subsections (a), (b), (c),
(d) and (e) of this Section, the Commission shall issue an order concerning the acquisition of the
small public utility or telecommunications carrier by a capable public utility or
telecommunications carrier. If the Commission finds that the small public utility or
telecommunications carrier should be acquired by the capable public utility or telecommunications
carrier, the order shall also provide for the extension of the service area of the acquiring
capable public utility or telecommunications carrier.
(g) The price for the acquisition of the small public utility or telecommunications carrier
shall be determined by agreement between the small public utility or telecommunications carrier and
the acquiring capable public utility or telecommunications carrier subject to a determination by
the Commission that the price is reasonable. If the small public utility or telecommunications
carrier and the acquiring capable public utility or telecommunications carrier are unable to agree
on the acquisition price or the Commission disapproves the acquisition price upon which they have
agreed, the Commission shall issue an order directing the acquiring capable public utility or
telecommunications carrier
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 128 -
|
|
LRB095 11114 MJR 38234 a |
to acquire the small public utility or telecommunications carrier by following the procedure
prescribed for the exercise of the powers of eminent domain under Section 8-509 of this Act.
(h) The Commission may, in its discretion and for a reasonable period of time after the date
of acquisition, allow the acquiring capable public utility or telecommunications carrier to charge
and collect rates from the customers of the acquired small public utility or telecommunications
carrier under a separate tariff.
(i) A capable public utility or telecommunications carrier ordered by the Commission to
acquire a small public utility or telecommunications carrier shall submit to the Commission for
approval before the acquisition a plan, including a timetable, for bringing the small public
utility or telecommunications carrier into compliance with applicable statutory and regulatory
standards.
(Source: P.A. 91-357, eff. 7-29-99.)
(220 ILCS 5/8-403) (from Ch. 111 2/3, par. 8-403)
Sec. 8-403. The Commission shall design and
implement policies which encourage the economical utilization of cogeneration and small power
production, as these terms are defined in Section 3-105, item (7) of subsection (b)
paragraph 7, including specifically, but not limited to, the
cogeneration or production of heat, steam or electricity by municipal
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 129 -
|
|
LRB095 11114 MJR 38234 a |
corporations or any other political subdivision of this State. No public utility shall discriminate
in any way with respect to the conditions or price for provision of maintenance power, standby
power and supplementary power as these terms are defined by current Commission rules, or for any
other service.
The prices charged by a utility for maintenance power, standby power, supplementary power and all
other such services shall be cost-based and just and reasonable.
The Commission shall conduct a study of procedures and policies to encourage the full and
economical utilization of cogeneration and small power production including, but not limited to,
(1) requiring utilities to pay full avoided costs, including long-term avoided capacity costs to
cogenerators and small power producers and (2) requiring utilities to make available upon request
of the State or a unit of local government, transmission and distribution services to transmit
electrical energy produced by cogeneration or small power production facilities located in any
structure or on any real property of the State or unit of local government to other locations of
this State or a unit of local government. The Commission shall report on this study, with
recommendation for legislative consideration, to the General Assembly by March 1, 1986.
(Source: P.A. 84-1118.)
(220 ILCS 5/12-103 new)
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 130 -
|
|
LRB095 11114 MJR 38234 a |
Sec. 12-103. Energy efficiency and demand-response measures.
(a) It is the policy of the State that electric utilities are required to use
cost-effective energy efficiency and demand-response measures to reduce delivery load. Requiring
investment in cost-effective energy efficiency and demand-response measures will reduce direct and
indirect costs to consumers by decreasing environmental impacts and by avoiding or delaying the
need for new generation, transmission, and distribution infrastructure. It serves the public
interest to allow electric utilities to recover costs for reasonably and prudently incurred
expenses for energy efficiency and demand-response measures. As used in this Section,
cost-effective means that the measures satisfy the total resource cost test. The low-income
measures described in subsection (f)(4) of this Section shall not be required to meet the total
resource cost test. For purposes of this Section, the terms energy-efficiency, demand-response,
and total resource cost test shall have the meanings set forth in the Illinois Power Agency Act.
For purposes of this Section, the amount per kilowatthour means the total amount paid for electric
service expressed on a per kilowatthour basis. For purposes of this Section, the total amount paid
for electric service includes without limitation estimated amounts paid for supply, transmission,
distribution, surcharges, and add-on-taxes.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 131 -
|
|
LRB095 11114 MJR 38234 a |
(b) Electric utilities shall implement cost-effective energy efficiency measures to meet
the following incremental annual energy savings goals:
(1) 0.2% of energy delivered in the year commencing June 1, 2008;
(2) 0.4% of energy delivered in the year commencing June 1, 2009;
(3) 0.6% of energy delivered in the year commencing June 1, 2010;
(4) 0.8% of energy delivered in the year commencing June 1, 2011;
(5) 1% of energy delivered in the year commencing June 1, 2012;
(6) 1.4% of energy delivered in the year commencing June 1, 2013;
(7) 1.8% of energy delivered in the year commencing June 1, 2014; and
(8) 2% of energy delivered in the year commencing June 1, 2015 and each
year thereafter.
(c) Electric utilities shall implement cost-effective demand-response measures to reduce
peak demand by 0.1% over the prior year for eligible retail customers, as defined in Section
16-111.5 of this Act. This requirement commences June 1, 2008 and continues for 10 years.
(d) Notwithstanding the requirements of subsections (b) and (c) of this Section, an
electric utility shall reduce the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 132 -
|
|
LRB095 11114 MJR 38234 a |
amount of energy efficiency and demand-response measures implemented in any single year by an
amount necessary to limit the estimated average increase in the amounts paid by retail customers in
connection with electric service due to the cost of those measures to:
(1) in 2008, no more than 0.5% of the amount paid per kilowatthour by those
customers during the year ending May 31, 2007;
(2) in 2009, the greater of an additional 0.5% of the amount paid per kilowatthour
by those customers during the year ending May 31, 2008 or 1% of the amount paid per
kilowatthour by those customers during the year ending May 31, 2007;
(3) in 2010, the greater of an additional 0.5% of the amount paid per kilowatthour
by those customers during the year ending May 31, 2009 or 1.5% of the amount paid per
kilowatthour by those customers during the year ending May 31, 2007;
(4) in 2011, the greater of an additional 0.5% of the amount paid per kilowatthour
by those customers during the year ending May 31, 2010 or 2% of the amount paid per
kilowatthour by those customers during the year ending May 31, 2007; and
(5) thereafter, the amount of energy efficiency and demand-response measures implemented
for any single year shall be reduced by an amount necessary to limit the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 133 -
|
|
LRB095 11114 MJR 38234 a |
estimated average net increase due to the cost of these measures included in the amounts
paid by eligible retail customers in connection with electric service to no more than the
greater of 2.015% of the amount paid per kilowatthour by those customers during the year
ending May 31, 2007 or the incremental amount per kilowatthour paid for these measures in
2011.
No later than June 30, 2011, the Commission shall review the limitation on the amount of
energy efficiency and demand-response measures implemented pursuant to this Section and report to
the General Assembly its findings as to whether that limitation unduly constrains the procurement
of energy efficiency and demand-response measures.
(e) Electric utilities shall be responsible for overseeing the design, development, and
filing of energy efficiency and demand-response plans with the Commission. Electric utilities shall
implement 100% of the demand-response measures in the plans. Electric utilities shall implement 75%
of the energy efficiency measures approved by the Commission, and may, as part of that
implementation, outsource various aspects of program development and implementation. The remaining
25% of those energy efficiency measures approved by the Commission shall be implemented by the
Department of Commerce and Economic Opportunity, and must be designed in conjunction with the
utility and the filing process. The Department may outsource development and implementation of
energy efficiency measures.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 134 -
|
|
LRB095 11114 MJR 38234 a |
A minimum of 10% of the entire portfolio of cost-effective energy efficiency measures shall be
procured from units of local government, municipal corporations, school districts, and community
college districts. The Department shall coordinate the implementation of these measures.
The apportionment of the dollars to cover the costs to implement the Departments share of
the portfolio of energy efficiency measures shall be made to the Department once the Department has
executed grants or contracts for energy efficiency measures and provided supporting documentation
for those grants and the contracts to the utility.
The details of the measures implemented by the Department shall be submitted by the
Department to the Commission in connection with the utilitys filing regarding the energy
efficiency and demand-response measures that the utility implements.
A utility providing approved energy efficiency and demand-response measures in the State
shall be permitted to recover costs of those measures through an automatic adjustment clause tariff
filed with and approved by the Commission. The tariff shall be established outside the context of a
general rate case. Each year the Commission shall initiate a review to reconcile any amounts
collected with the actual costs and to determine the required adjustment to the annual tariff
factor to match annual expenditures.
Each utility shall include, in its recovery of costs, the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 135 -
|
|
LRB095 11114 MJR 38234 a |
costs estimated for both the utilitys and the Departments implementation of energy efficiency
and demand-response measures. Costs collected by the utility for measures implemented by the
Department shall be submitted to the Department pursuant to Section 605-323 of the Civil
Administrative Code of Illinois and shall be used by the Department solely for the purpose of
implementing these measures. A utility shall not be required to advance any moneys to the
Department but only to forward such funds as it has collected. The Department shall report to the
Commission on an annual basis regarding the costs actually incurred by the Department in the
implementation of the measures. Any changes to the costs of energy efficiency measures as a result
of plan modifications shall be appropriately reflected in amounts recovered by the utility and
turned over to the Department.
The portfolio of measures, administered by both the utilities and the Department, shall,
in combination, be designed to achieve the annual savings targets described in subsections (b) and
(c) of this Section, as modified by subsection (d) of this Section.
The utility and the Department shall agree upon a reasonable portfolio of measures and
determine the measurable corresponding percentage of the savings goals associated with measures
implemented by the utility or Department.
No utility shall be assessed a penalty under subsection (f) of this Section for failure
to make a timely filing if that
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 136 -
|
|
LRB095 11114 MJR 38234 a |
failure is the result of a lack of agreement with the Department with respect to the allocation
of responsibilities or related costs or target assignments. In that case, the Department and the
utility shall file their respective plans with the Commission and the Commission shall determine an
appropriate division of measures and programs that meets the requirements of this Section.
If the Department is unable to meet incremental annual performance goals for the portion
of the portfolio implemented by the Department, then the utility and the Department shall jointly
submit a modified filing to the Commission explaining the performance shortfall and recommending an
appropriate course going forward, including any program modifications that may be appropriate in
light of the evaluations conducted under item (7) of subsection (f) of this Section. In this case,
the utility obligation to collect the Departments costs and turn over those funds to the
Department under this subsection (e) shall continue only if the Commission approves the
modifications to the plan proposed by the Department.
(f) No later than November 15, 2007, each electric utility shall file an energy efficiency
and demand-response plan with the Commission to meet the energy efficiency and demand-response
standards for 2008 through 2010. Every 3 years thereafter, each electric utility shall file an
energy efficiency and demand-response plan with the Commission. If a utility does not file such a
plan, it shall face a penalty of
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 137 -
|
|
LRB095 11114 MJR 38234 a |
$100,000 per day until the plan is filed. Each utilitys plan shall set forth the utilitys
proposals to meet the utilitys portion of the energy efficiency standards identified in subsection
(b) and the demand-response standards identified in subsection (c) of this Section as modified by
subsections (d) and (e), taking into account the unique circumstances of the utilitys service
territory. The Commission shall seek public comment on the utilitys plan and shall issue an order
approving or disapproving each plan within 3 months after its submission. If the Commission
disapproves a plan, the Commission shall, within 30 days, describe in detail the reasons for the
disapproval and describe a path by which the utility may file a revised draft of the plan to
address the Commissions concerns satisfactorily. If the utility does not refile with the
Commission within 60 days, the utility shall be subject to penalties at a rate of $100,000 per day
until the plan is filed. This process shall continue, and penalties shall accrue, until the utility
has successfully filed a portfolio of energy efficiency and demand-response measures. Penalties
shall be deposited into the Energy Efficiency Trust Fund. In submitting proposed energy efficiency
and demand-response plans and funding levels to meet the savings goals adopted by this Act the
utility shall:
(1) Demonstrate that its proposed energy efficiency and demand-response measures
will achieve the requirements that are identified in subsections (b) and (c) of this
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 138 -
|
|
LRB095 11114 MJR 38234 a |
Section, as modified by subsections (d) and (e).
(2) Present specific proposals to implement new building and appliance standards that have
been placed into effect.
(3) Present estimates of the total amount paid for electric service expressed on a per
kilowatthour basis associated with the proposed portfolio of measures designed to meet the
requirements that are identified in subsections (b) and (c) of this Section, as modified by
subsections (d) and (e).
(4) Coordinate with the Department and the Department of Healthcare and Family Services to
present a portfolio of energy efficiency measures targeted to households at or below 150% of the
poverty level at a level proportionate to those households share of total annual utility revenues
in Illinois.
(5) Demonstrate that its overall portfolio of energy efficiency and demand-response
measures, not including programs covered by item (4) of this subsection (f), are cost-effective
using the total resource cost test and represent a diverse cross-section of opportunities for
customers of all rate classes to participate in the programs.
(6) Include a proposed cost-recovery tariff mechanism to fund the proposed energy
efficiency and demand-response measures and to ensure the recovery of the prudently and
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 139 -
|
|
LRB095 11114 MJR 38234 a |
reasonably incurred costs of Commission-approved programs.
(7) Provide for an annual independent evaluation of the performance of the
cost-effectiveness of the utilitys portfolio of measures and the Departments portfolio of
measures, as well as a full review of the 3-year results of the broader net program impacts
and, to the extent practical, for adjustment of the measures on a going-forward basis as a
result of the evaluations. The resources dedicated to evaluation shall not exceed 3% of
portfolio resources in any given year.
(g) No more than 3% of energy efficiency and demand-response program revenue may
be allocated for demonstration of breakthrough equipment and devices.
(h) This Section does not apply to an electric utility that on December 31, 2005 provided
electric service to fewer than 100,000 customers in Illinois.
(i) If, after 2 years, an electric utility fails to meet the efficiency standard
specified in subsection (b) of this Section, as modified by subsections (d) and (e), it shall
make a contribution to the Low-Income Home Energy Assistance Program. The combined total
liability for failure to meet the goal shall be $1,000,000, which shall be assessed as
follows: a large electric utility shall pay $665,000, and a medium electric utility shall pay
$335,000. If, after 3 years, an electric utility fails to meet the efficiency standard
specified in subsection (b) of this Section, as modified by
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 140 -
|
|
LRB095 11114 MJR 38234 a |
subsections (d) and (e), it shall make a contribution to the Low-Income Home Energy Assistance
Program. The combined total liability for failure to meet the goal shall be $1,000,000, which shall
be assessed as follows: a large electric utility shall pay $665,000, and a medium electric utility
shall pay $335,000. In addition, the responsibility for implementing the energy efficiency measures
of the utility making the payment shall be transferred to the Illinois Power Agency if, after 3
years, or in any subsequent 3-year period, the utility fails to meet the efficiency standard
specified in subsection (b) of this Section, as modified by subsections (d) and (e). The Agency
shall implement a competitive procurement program to procure resources necessary to meet the
standards specified in this Section as modified by subsections (d) and (e), with costs for those
resources to be recovered in the same manner as products purchased through the procurement plan as
provided in Section 16-111.5. The Director shall implement this requirement in connection with the
procurement plan as provided in Section 16-111.5.
For purposes of this Section, (i) a large electric utility is an electric utility that,
on December 31, 2005, served more than 2,000,000 electric customers in Illinois; (ii) a medium
electric utility is an electric utility that, on December 31, 2005, served 2,000,000 or fewer but
more than 100,000 electric customers in Illinois; and (iii) Illinois electric utilities that are
affiliated by virtue of a common
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 141 -
|
|
LRB095 11114 MJR 38234 a |
parent company are considered a single electric utility.
(j) If, after 3 years, or any subsequent 3-year period, the Department fails to implement
the Departments share of energy efficiency measures required by the standards in subsection
(b), then the Illinois Power Agency may assume responsibility for and control of the
Departments share of the required energy efficiency measures. The Agency shall implement a
competitive procurement program to procure resources necessary to meet the standards
specified in this Section, with the costs of these resources to be recovered in the same
manner as provided for the Department in this Section.
(k) No electric utility shall be deemed to have failed to meet the energy efficiency
standards to the extent any such failure is due to a failure of the Department or the Agency.
(220 ILCS 5/16-101A)
Sec. 16-101A. Legislative findings.
(a) The citizens and businesses of the State of Illinois have been well-served by a
comprehensive electrical utility system which has provided safe, reliable, and affordable service.
The electrical utility system in the State of Illinois has historically been subject to State and
federal regulation, aimed at assuring the citizens and businesses of the State of safe, reliable,
and affordable service, while at the same time assuring the utility system of a return on its
investment.
(b) Competitive forces are affecting the market for
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 142 -
|
|
LRB095 11114 MJR 38234 a |
electricity as a result of recent federal regulatory and statutory changes and the activities of
other states. Competition in the electric services market may create opportunities for new products
and services for customers and lower costs for users of electricity. Long-standing regulatory
relationships need to be altered to accommodate the competition that could fundamentally alter the
structure of the electric services market.
(c) With the advent of increasing competition in this industry, the State has a continued
interest in assuring that the safety, reliability, and affordability of electrical power is not
sacrificed to competitive pressures, and to that end, intends to implement safeguards to assure
that the industry continues to operate the electrical system in a manner that will serve the
publics interest. Under the existing regulatory framework, the industry has been encouraged to
undertake certain investments in its physical plant and personnel to enhance its efficient
operation, the cost of which it has been permitted to pass on to consumers. The State has an
interest in providing the existing utilities a reasonable opportunity to obtain a return on certain
investments on which they depended in undertaking those commitments in the first instance while, at
the same time, not permitting new entrants into the industry to take unreasonable advantage of the
investments made by the formerly regulated industry.
(d) A competitive wholesale and retail market must benefit
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 143 -
|
|
LRB095 11114 MJR 38234 a |
all Illinois citizens. The Illinois Commerce Commission should act to promote the development of an
effectively competitive electricity market that operates efficiently and is equitable to all
consumers. Consumer protections must be in place to ensure that all customers continue to receive
safe, reliable, affordable, and environmentally safe electric service.
(e) All consumers must benefit in an equitable and timely fashion from the lower costs for
electricity that result from retail and wholesale competition and receive sufficient information to
make informed choices among suppliers and services. The use of renewable resources and energy
efficiency resources should be encouraged in competitive markets.
(f) The efficiency of electric markets depends both upon the competitiveness of supply and
upon the price-responsiveness of the demand for service. Therefore, to ensure the lowest total cost
of service and to enhance the reliability of service, all classes of the electricity customers of
electric utilities should have access to and be able to voluntarily use real-time pricing and other
price-response and demand-response mechanisms.
(g) Including cost-effective renewable resources in a diverse electricity supply portfolio
will reduce long-term direct and indirect costs to consumers by decreasing environmental impacts
and by avoiding or delaying the need for new generation, transmission, and distribution
infrastructure. It serves the public interest to allow electric utilities to
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 144 -
|
|
LRB095 11114 MJR 38234 a |
recover costs for reasonably and prudently incurred expenses for electricity generated by
renewable resources.
(Source: P.A. 94-977, eff. 6-30-06.)
(220 ILCS 5/16-103.1 new)
Sec. 16-103.1. Tariffed service to Unit Owners Associations. An electric utility that
serves at least 2,000,000 customers must provide tariffed service to Unit Owners
Associations, as defined by Section 2 of the Condominium Property Act, for condominium
properties that are not restricted to nonresidential use at rates that do not exceed on
average the rates offered to residential customers on an annual basis. Within 10 days after
the effective date of this amendatory Act, the electric utility shall provide the tariffed
service to Unit Owners Associations required by this Section and shall reinstate any
residential all-electric discount applicable to any Unit Owners Association that received
such a discount on December 31, 2006. For purposes of this Section, residential customers
means those retail customers of an electric utility that receive (i) electric utility service
for household purposes distributed to a dwelling of 2 or fewer units that is billed under a
residential rate or (ii) electric utility service for household purposes distributed to a
dwelling unit or units that is billed under a residential rate and is registered by a
separate meter for each dwelling unit.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 145 -
|
|
LRB095 11114 MJR 38234 a |
(220 ILCS 5/16-111)
Sec. 16-111. Rates and restructuring transactions during mandatory transition period;
restructuring and other transactions.
(a) During the mandatory transition period, notwithstanding any provision of Article IX of
this Act, and except as provided in subsections (b), (d), (c), and
(f) of this Section, the Commission shall not (i) initiate, authorize or order any change by way of
increase (other than in connection with a request for rate increase which was filed after September
1, 1997 but prior to October 15, 1997, by an electric utility serving less than 12,500 customers in
this State), (ii) initiate or, unless requested by the electric utility, authorize or order any
change by way of decrease, restructuring or unbundling (except as provided in Section 16-109A), in
the rates of any electric utility that were in effect on October 1, 1996, or (iii) in any order
approving any application for a merger pursuant to Section 7-204 that was pending as of May 16,
1997, impose any condition requiring any filing for an increase, decrease, or change in, or other
review of, an electric utilitys rates or enforce any such condition of any such order; provided,
however, that this subsection shall not prohibit the Commission from:
(1) approving the application of an electric utility to implement an alternative to rate of
return regulation or a
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 146 -
|
|
LRB095 11114 MJR 38234 a |
regulatory mechanism that rewards or penalizes the electric utility through adjustment of rates
based on utility performance, pursuant to Section 9-244;
(2) authorizing an electric utility to eliminate its fuel adjustment clause and adjust its base
rate tariffs in accordance with subsection (b), (d), or (f) of Section 9-220 of this Act, to fix
its fuel adjustment factor in accordance with subsection (c) of Section 9-220 of this Act, or to
eliminate its fuel adjustment clause in accordance with subsection (e) of Section 9-220 of this
Act;
(3) ordering into effect tariffs for delivery services and transition charges in accordance with
Sections 16-104 and 16-108, for real-time pricing in accordance with Section 16-107, or the options
required by Section 16-110 and subsection (n) of 16-112, allowing a billing experiment in
accordance with Section 16-106, or modifying delivery services tariffs in accordance with Section
16-109; or
(4) ordering or allowing into effect any tariff to recover charges pursuant to Sections 9-201.5,
9-220.1, 9-221, 9-222 (except as provided in Section 9-222.1), 16-108, and 16-114 of this Act,
Section 5-5 of the Electricity Infrastructure Maintenance Fee Law, Section 6-5 of the Renewable
Energy, Energy Efficiency, and Coal Resources Development Law of 1997, and Section 13 of the Energy
Assistance Act.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 147 -
|
|
LRB095 11114 MJR 38234 a |
After December 31, 2004, the provisions of this subsection (a) shall not apply to an electric
utility whose average residential retail rate was less than or equal to 90% of the average
residential retail rate for the Midwest Utilities, as that term is defined in subsection (b) of
this Section, based on data reported on Form 1 to the Federal Energy Regulatory Commission for
calendar year 1995, and which served between 150,000 and 250,000 retail customers in this State on
January 1, 1995 unless the electric utility or its holding company has been acquired by or merged
with an affiliate of another electric utility subsequent to January 1, 2002. This exemption shall
be limited to this subsection (a) and shall not extend to any other provisions of this Act.
(b) Notwithstanding the provisions of subsection (a), each Illinois electric utility serving
more than 12,500 customers in Illinois shall file tariffs (i) reducing, effective August 1, 1998,
each component of its base rates to residential retail customers by 15% from the base rates in
effect immediately prior to January 1, 1998 and (ii) if the public utility provides electric
service to (A) more than 500,000 customers but less than 1,000,000 customers in this State on
January 1, 1999, reducing, effective May 1, 2002, each component of its base rates to residential
retail customers by an additional 5% from the base rates in effect immediately prior to January 1,
1998, or (B) at least 1,000,000 customers in this State on January 1, 1999, reducing, effective
October 1, 2001, each
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 148 -
|
|
LRB095 11114 MJR 38234 a |
component of its base rates to residential retail customers by an additional 5% from the base rates
in effect immediately prior to January 1, 1998. Provided, however, that (A) if an electric
utilitys average residential retail rate is less than or equal to the average residential retail
rate for a group of Midwest Utilities (consisting of all investor-owned electric utilities with
annual system peaks in excess of 1000 megawatts in the States of Illinois, Indiana, Iowa, Kentucky,
Michigan, Missouri, Ohio, and Wisconsin), based on data reported on Form 1 to the Federal Energy
Regulatory Commission for calendar year 1995, then it shall only be required to file tariffs (i)
reducing, effective August 1, 1998, each component of its base rates to residential retail
customers by 5% from the base rates in effect immediately prior to January 1, 1998, (ii) reducing,
effective October 1, 2000, each component of its base rates to residential retail customers by the
lesser of 5% of the base rates in effect immediately prior to January 1, 1998 or the percentage by
which the electric utilitys average residential retail rate exceeds the average residential retail
rate of the Midwest Utilities, based on data reported on Form 1 to the Federal Energy Regulatory
Commission for calendar year 1999, and (iii) reducing, effective October 1, 2002, each component of
its base rates to residential retail customers by an additional amount equal to the lesser of 5% of
the base rates in effect immediately prior to January 1, 1998 or the percentage by which the
electric utilitys average residential
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 149 -
|
|
LRB095 11114 MJR 38234 a |
retail rate exceeds the average residential retail rate of the Midwest Utilities, based on data
reported on Form 1 to the Federal Energy Regulatory Commission for calendar year 2001; and (B) if
the average residential retail rate of an electric utility serving between 150,000 and 250,000
retail customers in this State on January 1, 1995 is less than or equal to 90% of the average
residential retail rate for the Midwest Utilities, based on data reported on Form 1 to the Federal
Energy Regulatory Commission for calendar year 1995, then it shall only be required to file tariffs
(i) reducing, effective August 1, 1998, each component of its base rates to residential retail
customers by 2% from the base rates in effect immediately prior to January 1, 1998; (ii) reducing,
effective October 1, 2000, each component of its base rates to residential retail customers by 2%
from the base rate in effect immediately prior to January 1, 1998; and (iii) reducing, effective
October 1, 2002, each component of its base rates to residential retail customers by 1% from the
base rates in effect immediately prior to January 1, 1998. Provided, further, that any electric
utility for which a decrease in base rates has been or is placed into effect between October 1,
1996 and the dates specified in the preceding sentences of this subsection, other than pursuant to
the requirements of this subsection, shall be entitled to reduce the amount of any reduction or
reductions in its base rates required by this subsection by the amount of such other decrease. The
tariffs required under this subsection
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 150 -
|
|
LRB095 11114 MJR 38234 a |
shall be filed 45 days in advance of the effective date. Notwithstanding anything to the contrary
in Section 9-220 of this Act, no restatement of base rates in conjunction with the elimination of a
fuel adjustment clause under that Section shall result in a lesser decrease in base rates than
customers would otherwise receive under this subsection had the electric utilitys fuel adjustment
clause not been eliminated.
(c) Any utility reducing its base rates by 15% on August 1, 1998 pursuant to subsection (b)
shall include the following statement on its bills for residential customers from August 1 through
December 31, 1998: Effective August 1, 1998, your rates have been reduced by 15% by the Electric
Service Customer Choice and Rate Relief Law of 1997 passed by the Illinois General Assembly.. Any
utility reducing its base rates by 5% on August 1, 1998, pursuant to subsection (b) shall include
the following statement on its bills for residential customers from August 1 through December 31,
1998: Effective August 1, 1998, your rates have been reduced by 5% by the Electric Service
Customer Choice and Rate Relief Law of 1997 passed by the Illinois General Assembly..
Any utility reducing its base rates by 2% on August 1, 1998 pursuant to subsection (b) shall
include the following statement on its bills for residential customers from August 1 through
December 31, 1998: Effective August 1, 1998, your rates have been reduced by 2% by the Electric
Service Customer Choice and Rate Relief Law of 1997 passed by the Illinois
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 151 -
|
|
LRB095 11114 MJR 38234 a |
General Assembly..
(d) (Blank.) During the mandatory transition period, but not before January 1, 2000,
and notwithstanding the provisions of subsection (a), an electric utility may request an increase
in its base rates if the electric utility demonstrates that the 2-year average of its earned rate
of return on common equity, calculated as its net income applicable to common stock divided by the
average of its beginning and ending balances of common equity using data reported in the electric
utilitys Form 1 report to the Federal Energy Regulatory Commission but adjusted to remove the
effects of accelerated depreciation or amortization or other transition or mitigation measures
implemented by the electric utility pursuant to subsection (g) of this Section and the effect of
any refund paid pursuant to subsection (e) of this Section, is below the 2-year average for the
same 2 years of the monthly average yields of 30-year U.S. Treasury bonds published by the Board of
Governors of the Federal Reserve System in its weekly H.15 Statistical Release or successor
publication. The Commission shall review the electric utilitys request, and may review the
justness and reasonableness of all rates for tariffed services, in accordance with the provisions
of Article IX of this Act, provided that the Commission shall consider any special or negotiated
adjustments to the revenue requirement agreed to between the electric utility and the other parties
to the proceeding. In setting rates under this Section, the Commission
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 152 -
|
|
LRB095 11114 MJR 38234 a |
shall exclude the costs and revenues that are associated with competitive services
and any billing or pricing experiments conducted under Section 16-106.
(e) (Blank.) For the purposes of this subsection (e) all calculations
and comparisons shall be performed for the Illinois operations of multijurisdictional
utilities. During the mandatory transition period, notwithstanding the provisions of
subsection (a), if the 2-year average of an electric utilitys earned rate of return on
common equity, calculated as its net income applicable to common stock divided by the average
of its beginning and ending balances of common equity using data reported in the electric
utilitys Form 1 report to the Federal Energy Regulatory Commission but adjusted to remove
the effect of any refund paid under this subsection (e), and further adjusted to include the
annual amortization of any difference between the consideration received by an affiliated
interest of the electric utility in the sale of an asset which had been sold or transferred
by the electric utility to the affiliated interest subsequent to the effective date of this
amendatory Act of 1997 and the consideration for which such asset had been sold or
transferred to the affiliated interest, with such difference to be amortized ratably from the
date of the sale by the affiliated interest to December 31, 2006, exceeds the 2-year average
of the Index for the same 2 years by 1.5 or more percentage points, the electric utility
shall make refunds to customers beginning the first billing day
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 153 -
|
|
LRB095 11114 MJR 38234 a |
of April in the following year in the manner described in paragraph (3) of this
subsection. For purposes of this subsection (e), the Index shall be the sum of (A) the average
for the 12 months ended September 30 of the monthly average yields of 30-year U.S. Treasury bonds
published by the Board of Governors of the Federal Reserve System in its weekly H.15 Statistical
Release or successor publication for each year 1998 through 2006, and (B) (i) 4.00 percentage
points for each of the 12-month periods ending September 30, 1998 through September
30, 1999 or 8.00 percentage points if the electric utilitys average residential retail rate is
less than or equal to 90% of the average residential retail rate for the Midwest Utilities, as
that term is defined in subsection (b) of this Section, based on data reported on Form 1 to the
Federal Energy Regulatory Commission for calendar year 1995, and the electric utility served
between 150,000 and 250,000 retail customers on January 1, 1995, (ii) 7.00 percentage points for
each of the 12-month periods ending September 30, 2000 through September 30, 2006 if the electric
utility was providing service to at least 1,000,000 customers in this State on January 1, 1999, or
9.00 percentage points if the electric utilitys average residential retail rate is less than or
equal to 90% of the average residential retail rate for the Midwest Utilities, as that term is
defined in subsection (b) of this Section, based on data reported on Form 1 to the Federal Energy
Regulatory Commission for calendar year 1995 and the electric utility
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 154 -
|
|
LRB095 11114 MJR 38234 a |
served between 150,000 and 250,000 retail customers in this State on January 1, 1995, (iii) 11.00
percentage points for each of the 12-month periods ending September 30, 2000 through September 30,
2006, but only if the electric utilitys average residential retail rate is less than or equal to
90% of the average residential retail rate for the Midwest Utilities, as that term is defined in
subsection (b) of this Section, based on data reported on Form 1 to the Federal Energy Regulatory
Commission for calendar year 1995, the electric utility served between 150,000 and 250,000 retail
customers in this State on January 1, 1995, and the electric utility offers delivery services on or
before June 1, 2000 to retail customers whose annual electric energy use comprises 33% of the
kilowatt hour sales to that group of retail customers that are classified under Division D, Groups
20 through 39 of the Standard Industrial Classifications set forth in the Standard Industrial
Classification Manual published by the United States Office of Management and Budget, excluding the
kilowatt hour sales to those customers that are eligible for delivery services pursuant to Section
16-104(a)(1)(i), and offers delivery services to its remaining retail customers classified under
Division D, Groups 20 through 39 on or before October 1, 2000, and, provided further, that the
electric utility commits not to petition pursuant to Section 16-108(f) for entry of an order by the
Commission authorizing the electric utility to implement transition charges for an additional
period after
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 155 -
|
|
LRB095 11114 MJR 38234 a |
December 31, 2006, or (iv) 5.00 percentage points for each of the 12-month periods ending September
30, 2000 through September 30, 2006 for all other electric utilities or 7.00 percentage points for
such utilities for each of the 12-month periods ending September 30, 2000 through September 30,
2006 for any such utility that commits not to petition pursuant to Section 16-108(f) for entry of
an order by the Commission authorizing the electric utility to implement transition charges for an
additional period after December 31, 2006 or 11.00 percentage points for each of the 12-month
periods ending September 30, 2005 and September 30, 2006 for each electric utility providing
service to fewer than 6,500, or between 75,000 and 150,000, electric retail customers in this State
on January 1, 1995 if such utility commits not to petition pursuant to Section 16-108(f) for entry
of an order by the Commission authorizing the electric utility to implement transition charges for
an additional period after December 31, 2006.
(1) For purposes of this subsection (e), excess earnings means the difference between
(A) the 2-year average of the electric utilitys earned rate of return on common equity, less
(B) the 2-year average of the sum of (i) the Index applicable to each of the 2 years and (ii)
1.5 percentage points; provided, that excess earnings shall never be less than zero.
(2) On or before March 31 of each year 2000 through
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 156 -
|
|
LRB095 11114 MJR 38234 a |
2007 each electric utility shall file a report with the Commission showing its earned rate of
return on common equity, calculated in accordance with this subsection, for the preceding calendar
year and the average for the preceding 2 calendar years.
(3) If an electric utility has excess earnings, determined in accordance with paragraphs (1)
and (2) of this subsection, the refunds which the electric utility shall pay to its customers
beginning the first billing day of April in the following year shall be calculated and applied as
follows:
(i) The electric utilitys excess earnings shall be multiplied by the average of the beginning
and ending balances of the electric utilitys common equity for the 2-year period in which excess
earnings occurred.
(ii) The result of the calculation in (i) shall be multiplied by 0.50 and then divided
by a number equal to 1 minus the electric utilitys composite federal and State income tax
rate.
(iii) The result of the calculation in (ii) shall be divided by the sum of the electric
utilitys projected total kilowatt-hour sales to retail customers plus projected
kilowatt-hours to be delivered to delivery services customers over a one year period
beginning with the first billing date in
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 157 -
|
|
LRB095 11114 MJR 38234 a |
April in the succeeding year to determine a cents per kilowatt-hour
refund factor.
(iv) The cents per kilowatt-hour refund factor calculated in (iii)
shall be credited to the electric utilitys customers by applying the
factor on the customers monthly bills to each kilowatt-hour sold or
delivered until the total amount calculated in (ii) has been paid to
customers.
(f) During the mandatory transition period, an electric utility may
file revised tariffs reducing the price of any tariffed service offered by
the electric utility for all customers taking that tariffed service, which
shall be effective 7 days after filing.
(g) Until all classes of tariffed services are declared competitive
During the mandatory transition period, an electric utility may, without obtaining
any approval of the Commission other than that provided for in this subsection and
notwithstanding any other provision of this Act or any rule or regulation of the
Commission that would require such approval:
(1) implement a reorganization, other than a merger of 2 or more public
utilities as defined in Section 3-105 or their holding companies;
(2) retire generating plants from service;
(3) sell, assign, lease or otherwise transfer assets to an affiliated or
unaffiliated entity and as part of such transaction enter into service
agreements, power purchase
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 158 -
|
|
LRB095 11114 MJR 38234 a |
agreements, or other agreements with the transferee;
provided, however, that the prices, terms and conditions of any power purchase agreement
must be approved or allowed into effect by the Federal Energy Regulatory Commission; or
(4) use any accelerated cost recovery method including accelerated depreciation,
accelerated amortization or
other capital recovery methods, or record reductions to the original cost of its assets.
In order to implement a reorganization, retire generating plants from service, or sell,
assign, lease or otherwise transfer assets pursuant to this Section, the electric utility shall
comply with subsections (c) and (d) of Section 16-128, if applicable, and subsection (k) of this
Section, if applicable, and provide the Commission with at least 30 days notice of the proposed
reorganization or transaction, which notice shall include the following information:
(i) a complete statement of the entries that the electric utility will make on its
books and records of account to implement the proposed reorganization or transaction
together with a certification from an independent certified public accountant that such
entries are in accord with generally accepted accounting principles and, if the
Commission has previously approved guidelines for cost allocations between the utility
and its affiliates, a certification from the chief accounting officer of the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 159 -
|
|
LRB095 11114 MJR 38234 a |
utility that such entries are in accord with those cost allocation guidelines;
(ii) a description of how the electric utility will use proceeds of any sale,
assignment, lease or transfer to retire debt or otherwise reduce or recover the costs
of services provided by such electric utility;
(iii) a list of all federal approvals or approvals required from departments and agencies of
this State, other than the Commission, that the electric utility has or will obtain before
implementing the reorganization or transaction;
(iv) an irrevocable commitment by the electric utility that it will not, as a result of the
transaction, impose any stranded cost charges that it might otherwise be allowed to charge retail
customers under federal law or increase the transition charges that it is otherwise entitled to
collect under this Article XVI; and
(v) if the electric utility proposes to sell, assign, lease or otherwise transfer a generating
plant
that brings the amount of net dependable generating capacity transferred pursuant to this
subsection to an amount equal to or greater than 15% of the electric utilitys net dependable
capacity as of the effective date of this amendatory Act of 1997, and enters into a power purchase
agreement with the entity to which such
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 160 -
|
|
LRB095 11114 MJR 38234 a |
generating plant is sold, assigned, leased, or otherwise transferred, the electric utility also
agrees, if its fuel adjustment clause has not already been eliminated, to eliminate its fuel
adjustment clause in accordance with subsection (b) of Section 9-220 for a period of time equal to
the length of any such power purchase agreement or successor agreement, or until January 1, 2005,
whichever is longer; if the capacity of the generating plant so transferred and related power
purchase agreement does not result in the
elimination of the fuel adjustment clause under this subsection, and the fuel adjustment clause has
not already been eliminated, the electric utility shall agree that the costs associated with the
transferred plant that are included in the calculation of the rate per kilowatt-hour to be applied
pursuant to the electric utilitys fuel adjustment clause during such period shall not exceed the
per kilowatt-hour cost associated with such generating plant included in the electric utilitys
fuel adjustment clause during the full calendar year preceding the transfer, with such limit to be
adjusted each year thereafter by the Gross Domestic Product Implicit Price Deflator.
(vi) In addition, if the electric utility proposes to sell, assign, or lease, (A) either (1)
an amount of
generating plant that brings the amount of net
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 161 -
|
|
LRB095 11114 MJR 38234 a |
dependable generating capacity transferred pursuant to this subsection to an amount equal to or
greater than 15% of its net dependable capacity on the effective date of this amendatory Act of
1997, or (2) one or more generating plants with a total net dependable capacity of 1100 megawatts,
or (B) transmission and distribution facilities that either (1) bring the amount of transmission
and distribution facilities transferred pursuant to this subsection to an amount equal to or
greater than 15% of the electric utilitys total depreciated original cost investment in such
facilities, or (2) represent an investment of $25,000,000 in terms of total depreciated original
cost, the electric utility shall provide, in addition
to the information listed in subparagraphs (i) through (v), the following information: (A) a
description of how the electric utility will meet its service obligations under this Act in a safe
and reliable manner and (B) the electric utilitys projected earned rate of return on common
equity, calculated in accordance with subsection (d) of this Section, for each year from the date
of the notice through December 31, 2006 both with and without the proposed transaction. If the
Commission has not issued an order initiating a hearing on the proposed transaction within 30 days
after the date the electric utilitys
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 162 -
|
|
LRB095 11114 MJR 38234 a |
notice is filed, the transaction shall be deemed approved. The Commission may, after notice and
hearing, prohibit the proposed transaction if it makes either or both of the following findings:
(1) that the proposed transaction will render the electric utility unable to provide its tariffed
services in a safe and reliable manner, or (2) that there is a strong likelihood that consummation
of the proposed transaction will result in the electric utility being entitled to request an
increase in its base rates during the mandatory transition period pursuant to subsection (d) of
this Section. Any hearing initiated by the Commission into the proposed transaction shall be
completed, and the Commissions final order approving or prohibiting the proposed transaction shall
be entered, within 90 days after the date the electric utilitys notice was filed. Provided,
however, that a sale, assignment, or lease of
transmission facilities to an independent system operator that meets the
requirements of Section 16-126 shall not be subject to Commission approval under this
Section.
In any proceeding conducted by the Commission pursuant to this subparagraph (vi),
intervention shall be limited to parties with a direct interest in the transaction
which is the subject of the hearing and any
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 163 -
|
|
LRB095 11114 MJR 38234 a |
statutory consumer protection agency as defined in subsection (d) of Section 9-102.1.
Notwithstanding the provisions of Section 10-113 of this Act, any application seeking rehearing of
an order issued under this subparagraph (vi), whether filed by the electric utility or by an
intervening party, shall be filed within 10 days after service of the order.
The Commission shall not in any subsequent proceeding or otherwise, review such a reorganization or other transaction
authorized by this Section, but shall retain the authority to allocate costs as stated in Section
16-111(1). An entity to which an electric utility sells, assigns, leases or transfers assets
pursuant to this subsection (g) shall not, as a result of the transactions specified in this
subsection (g), be deemed a public utility as defined in Section 3-105. Nothing in this subsection
(g) shall change any requirement under the jurisdiction of the Illinois Department of Nuclear
Safety including, but not limited to, the payment of fees. Nothing in this subsection (g) shall
exempt a utility from obtaining a certificate pursuant to Section 8-406 of this Act for the
construction of a new electric generating facility. Nothing in this subsection (g) is intended to
exempt the transactions hereunder from the operation of the federal or State antitrust
laws. Nothing in this subsection (g) shall require an electric utility to use the procedures
specified in this subsection for any of the transactions specified herein. Any other procedure
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 164 -
|
|
LRB095 11114 MJR 38234 a |
available under this Act may, at the electric utilitys election, be used for any such
transaction.
(h) During the mandatory transition period, the Commission shall not establish or use any
rates of depreciation, which for purposes of this subsection shall include amortization, for any
electric utility other than those established pursuant to subsection (c) of Section 5-104 of this
Act or utilized pursuant to subsection (g) of this Section. Provided, however, that in any
proceeding to review an electric utilitys rates for tariffed services pursuant to Section 9-201,
9-202, 9-250 or 16-111(d) of this Act, the Commission may establish new rates of depreciation for
the electric utility in the same manner provided in subsection (d) of Section 5-104 of this Act. An
electric utility implementing an accelerated cost recovery method including accelerated
depreciation, accelerated amortization or other capital recovery methods, or recording reductions
to the original cost of its assets, pursuant to subsection (g) of this Section, shall file a
statement with the Commission describing the accelerated cost recovery method to be implemented or
the reduction in the original cost of its assets to be recorded. Upon the filing of such statement,
the accelerated cost recovery method or the reduction in the original cost of assets shall be
deemed to be approved by the Commission as though an order had been entered by the Commission.
(i) Subsequent to the mandatory transition period, the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 165 -
|
|
LRB095 11114 MJR 38234 a |
Commission, in any proceeding to establish rates and charges for tariffed services offered by an
electric utility, shall consider only (1) the then current or projected revenues, costs,
investments and cost of capital directly or indirectly associated with the provision of such
tariffed services; (2) collection of transition charges in accordance with Sections 16-102 and
16-108 of this Act; (3) recovery of any employee transition costs as described in Section 16-128
which the electric utility is continuing to incur, including recovery of any unamortized portion of
such costs previously incurred or committed, with such costs to be equitably allocated among
bundled services, delivery services, and contracts with alternative retail electric suppliers; and
(4) recovery of the costs associated with the electric utilitys compliance with decommissioning
funding requirements; and shall not consider any other revenues, costs, investments or cost of
capital of either the electric utility or of any affiliate of the electric utility that are not
associated with the provision of tariffed services. In setting rates for tariffed services, the
Commission shall equitably allocate joint and common costs and investments between the electric
utilitys competitive and tariffed services. In determining the justness and reasonableness of the
electric power and energy component of an electric utilitys rates for tariffed services subsequent
to the mandatory transition period and prior to the time that the provision of such electric power
and energy is declared
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 166 -
|
|
LRB095 11114 MJR 38234 a |
competitive, the Commission shall consider the extent to which the electric utilitys tariffed
rates for such component for each customer class exceed the market value determined pursuant to
Section 16-112, and, if the electric power and energy component of such tariffed rate exceeds the
market value by more than 10% for any customer class, may establish such
electric power and energy component at a rate equal to the market value plus 10%. In any such case,
the Commission may also elect to extend the provisions of Section 16-111(e) for any period in which
the electric utility is collecting transition charges, using information applicable to such period.
(j) During the mandatory transition period, an electric utility may elect to transfer to a
non-operating income account under the Commissions Uniform System of Accounts either or both of
(i) an amount of unamortized investment tax credit that is in addition to the ratable amount which
is credited to the electric utilitys operating income account for the year in accordance with
Section 46 (f) (2) of the federal Internal Revenue Code of 1986, as in effect prior to P.L.
101-508, or (ii) excess tax reserves, as that term is defined in Section 203 (e) (2) (A) of the
federal Tax Reform Act of 1986, provided that (A) the amount transferred may not exceed the amount
of the electric utilitys assets that were created pursuant to Statement of Financial Accounting
Standards No. 71 which the electric utility has written off during the mandatory
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 167 -
|
|
LRB095 11114 MJR 38234 a |
transition period, and (B) the transfer shall not be effective until approved by the Internal
Revenue Service. An electric utility electing to make such a transfer shall file a statement with
the Commission stating the amount and timing of the transfer for which it intends to request
approval of the Internal Revenue Service, along with a copy of its proposed request to the Internal
Revenue Service for a ruling. The Commission shall issue an order within 14 days after the electric
utilitys filing approving, subject to receipt of approval from the Internal Revenue Service, the
proposed transfer.
(k) If an electric utility is selling or transferring to a single buyer 5 or more generating
plants located in this State
with a total net dependable capacity of 5000 megawatts or more pursuant to subsection (g) of
this Section and has obtained a sale price or consideration that exceeds 200% of the book value of
such plants, the electric utility must provide to the Governor, the President of the Illinois
Senate, the Minority Leader of the Illinois Senate, the Speaker of the Illinois House of
Representatives, and the Minority Leader of the Illinois House of Representatives no later than 15
days after filing its notice under subsection (g) of this Section or 5 days after the date on which
this subsection (k) becomes law, whichever is later, a written commitment in which such electric
utility agrees to expend $2 billion outside the corporate limits of any municipality with 1,000,000
or more inhabitants
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 168 -
|
|
LRB095 11114 MJR 38234 a |
within such electric utilitys service area, over a 6-year period beginning with the calendar year
in which the notice is filed, on projects, programs, and improvements within its service area
relating to transmission and distribution including, without limitation, infrastructure expansion,
repair and replacement, capital investments, operations and maintenance, and vegetation management.
(1) Notwithstanding any other provision of this Act or any rule, regulation, or prior
order of the Commission, a public utility providing electric and gas service may do any one or more
of the following: transfer assets to, reorganize with, or merge with one or more public utilities
under common holding company ownership or control in the manner prescribed in subsection (g) of
this Section. No merger transaction costs, such as fees paid to attorneys, investment bankers, and
other consultants, incurred in connection with a merger pursuant to this subsection (1) shall be
recoverable in any subsequent rate proceeding. Approval of a merger pursuant to this subsection (1)
shall not constitute approval of, or otherwise require, rate recovery of other costs incurred in
connection with, or to
implement the merger, such as the cost of restructuring, combining, or integrating debt,
assets, or systems. Such other costs may be recovered only to the extent that the surviving utility
can demonstrate that the cost savings produced by such restructuring, combination, or integration
exceed the associated costs. Nothing in this subsection (1) shall impair
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 169 -
|
|
LRB095 11114 MJR 38234 a |
the terms or conditions of employment or the collective bargaining rights of any employees
of the utilities that are transferring assets, reorganizing, or merging.
(m) If an electric utility that on December 31, 2005 provided electric service to at least
100,000 customers in Illinois transfers assets, reorganizes, or merges under this Section, then the
same provisions apply that applied during the mandatory transition period under Section 16-128.
(Source: P.A. 91-50, eff. 6-30-99; 92-537, eff. 6-6-02; 92-690, eff. 7-18-02; revised 9-10-02.)
(220 ILCS 5/16-111.5 new)
Sec. 16-111.5. Provisions relating to procurement.
(a) An electric utility that on December 31, 2005 served at least 100,000 customers in
Illinois shall procure power and energy for its eligible retail customers in accordance with the
applicable provisions set forth in Section 1-75 of the Illinois Power Agency Act and this Section.
Eligible retail customers for the purposes of this Section means those retail customers that
purchase power and energy from the electric utility under fixed-price bundled service tariffs,
other than those retail customers whose service is declared or deemed competitive under Section
16-113 and those other customer groups specified in this Section, including self-generating
customers, customers electing hourly pricing, or those customers who are otherwise ineligible for
fixed-price bundled tariff service. Those
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 170 -
|
|
LRB095 11114 MJR 38234 a |
customers that are excluded from the definition of eligible retail customers shall not
be included in the procurement plan load requirements, and the utility shall procure any supply
requirements, including capacity, ancillary services, and hourly priced energy, in the applicable
markets as needed to serve those customers, provided that the utility may include in its
procurement plan load requirements for the load that is associated with those retail customers
whose service has been declared or deemed competitive pursuant to Section 16-113 of this Act to the
extent that those customers are purchasing power and energy during one of the transition periods
identified in subsection (b) of Section 16-113 of this Act.
(b) A procurement plan shall be prepared for each electric utility consistent with the
applicable requirements of the Illinois Power Agency Act and this Section. For purposes of this
Section, Illinois electric utilities that are affiliated by virtue of a common parent company are
considered to be a single electric utility. Each procurement plan shall analyze the projected
balance of supply and demand for eligible retail customers over a 5-year period with the first
planning year beginning on June 1 of the year following the year in which the plan is filed. The
plan shall specifically identify the wholesale products to be procured following plan approval, and
shall follow all the requirements set forth in the Public Utilities Act and all applicable State
and federal laws, statutes, rules, or regulations, as well as Commission orders.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 171 -
|
|
LRB095 11114 MJR 38234 a |
Nothing
in this Section precludes consideration of contracts longer than 5 years and related forecast data. Unless specified
otherwise in this Section, in the procurement plan or in the implementing tariff, any
procurement occurring in accordance with this plan shall be competitively bid through a request for
proposals process. Approval and implementation of the procurement plan shall be subject to review
and approval by the Commission according to the provisions set forth in this Section. A procurement
plan shall include each of the following components:
(1) Hourly load analysis. This analysis shall include:
(i) multi-year historical analysis of hourly loads;
(ii) switching trends and competitive retail market analysis;
(iii) known or projected changes to future loads; and
(iv) growth forecasts by customer class.
(2) Analysis of the impact of any demand side and renewable energy
initiatives. This analysis shall include:
(i) the impact of demand response programs, both current and
projected;
(ii) supply side needs that are projected to be offset by purchases of
renewable energy resources, if any; and
(iii) the
impact of energy efficiency programs,
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 172 -
|
|
LRB095 11114 MJR 38234 a |
both current and projected.
(3) A plan for meeting the expected load requirements that will not be met
through preexisting contracts. This plan shall include:
(i) definitions of the different retail customer classes for which supply is
being purchased;
(ii) monthly forecasted system supply requirements, including expected
minimum, maximum, and
average values for the planning period;
(iii) the proposed mix and selection of standard wholesale products for which
contracts will be executed during the next year, separately or in combination, to meet that
portion of its load requirements not met through pre-existing contracts, including but not
limited to monthly 5 x 16 peak period block energy, monthly off-peak wrap energy, monthly 7 x
24 energy, annual 5 x 16 energy, annual off-peak wrap energy, annual 7 x 24 energy, monthly
capacity, annual capacity, peak load capacity obligations, capacity purchase plan, and
ancillary services;
(iv) proposed term structures for each wholesale product type included in the
proposed procurement plan portfolio of products; and
(v) an assessment of the price risk, load uncertainty, and other factors that
are associated with the proposed procurement plan; this assessment,
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 173 -
|
|
LRB095 11114 MJR 38234 a |
to the extent possible, shall include an analysis of the following factors: contract
terms, time frames for securing products or services, fuel costs, weather patterns,
transmission costs, market conditions, and the governmental regulatory environment; the
proposed procurement plan shall also identify alternatives for those portfolio measures that
are identified as having significant price risk.
(4) Proposed procedures for balancing loads. The procurement plan shall include, for load
requirements included in the procurement plan, the process for (i) hourly balancing of supply and
demand and (ii) the criteria
for portfolio re-balancing in the event of significant shifts in load.
(c) The procurement process set forth in Section 1-75 of the Illinois Power Agency
Act and subsection (e) of this Section shall be administered by a procurement administrator
and monitored by a procurement monitor.
(1) The procurement administrator shall:
(i) design the final procurement process in accordance with Section 1-75 of
the Illinois Power Agency Act and subsection (e) of this Section following Commission
approval of the procurement plan;
(ii) develop benchmarks in accordance with subsection (e)(3) to be used
to evaluate bids; these benchmarks shall be submitted to the Commission for
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 174 -
|
|
LRB095 11114 MJR 38234 a |
review and approval on a confidential basis prior to the procurement
event;
(iii) serve as the interface between the electric utility and suppliers;
(iv) manage the bidder pre-qualification and registration
process;
(v) obtain the electric utilities agreement to the final form of all
supply contracts and credit collateral agreements;
(vi) administer the request for proposals process;
(vii) have the discretion to negotiate to determine whether bidders are
willing to lower the price of bids that meet the benchmarks approved by the Commission;
any post-bid negotiations with bidders shall be limited to price only and shall be
completed within 24 hours after opening the sealed bids and shall be conducted in a
fair and unbiased manner; in
conducting the negotiations, there shall be no disclosure of any information derived from
proposals submitted by competing bidders; if information is disclosed to any bidder, it shall
be provided to all competing bidders;
(viii) maintain confidentiality of supplier and bidding information in a manner
consistent with all applicable laws, rules, regulations, and tariffs;
(ix) submit a confidential report to the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 175 -
|
|
LRB095 11114 MJR 38234 a |
Commission recommending acceptance or rejection of bids;
(x) notify the utility of contract counterparties and contract specifics; and
(xi) administer related contingency procurement events.
(2) The procurement monitor, who shall be retained by the Commission, shall:
(i) monitor interactions among the procurement administrator, suppliers, and
utility;
(ii) monitor and report to the Commission on the progress of the procurement
process;
(iii) provide an independent confidential report to the Commission regarding the
results of the procurement event;
(iv) assess compliance with the procurement plans approved by the Commission for
each utility that on December 31, 2005 provided electric service to a least 100,000 customers
in Illinois;
(v) preserve the confidentiality of supplier and bidding information in a manner
consistent with all
applicable laws, rules, regulations, and tariffs;
(vi) provide expert advice to the Commission and consult with the
procurement administrator regarding
issues related to procurement process design, rules, protocols, and
policy-related matters; and
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 176 -
|
|
LRB095 11114 MJR 38234 a |
(vii) consult with the procurement administrator regarding the
development and use of benchmark criteria, standard form contracts, credit
policies, and bid documents.
(d) Except as provided in subsection (j), the planning process shall be conducted as
follows:
(1) Beginning in 2008, each Illinois utility procuring power pursuant to this
Section shall annually provide a range of load forecasts to the Illinois Power Agency by July
15 of each year, or such other date as may be required by the Commission or Agency. The load
forecasts shall cover the 5-year procurement planning period for the next procurement plan
and shall include hourly data representing a high-load, low-load and expected-load scenario
for the load of the eligible retail customers. The utility shall provide supporting data and
assumptions for each of the scenarios.
(2) Beginning in 2008, the Illinois Power Agency shall prepare a procurement plan by
August 15th of each year, or such other date as may be required by the Commission. The
procurement plan shall identify the portfolio of power and energy products to be procured.
Copies of the procurement plan shall be posted and made publicly available on the Agencys
and Commissions websites, and copies shall also be provided to each affected electric
utility. An affected utility shall have 30 days following the date of posting to
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 177 -
|
|
LRB095 11114 MJR 38234 a |
provide comment to the Agency on the procurement plan. Other interested entities also may
comment on the procurement plan. All comments submitted to the Agency shall be specific, supported
by data or other detailed analyses, and, if objecting to all or a portion of the procurement plan,
accompanied by specific alternative wording or proposals. All comments shall be posted on the
Agencys and Commissions websites. During this 30-day comment period, the Agency shall hold at
least one public hearing within each utilitys service area for the purpose of receiving public
comment on the procurement plan. Within 14 days following the end of the 30-day review period, the
Agency shall revise the procurement plan as necessary based on the comments received and file the
procurement plan with the Commission and post the procurement plan on the websites.
(3) Within 5 days after the filing of the procurement plan, any person objecting to the
procurement plan shall file an objection with the Commission. Within 10 days after the filing, the
Commission shall determine whether a hearing is necessary. The Commission shall enter its order
confirming or modifying the procurement plan within 90 days after the filing of the procurement
plan by the Illinois Power Agency.
(4) The Commission shall approve the procurement plan, including expressly the forecast
used in the procurement
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 178 -
|
|
LRB095 11114 MJR 38234 a |
plan, if the Commission determines that it will ensure adequate, reliable,
affordable, efficient, and environmentally sustainable electric service at the lowest total
cost over time, taking into account any benefits of price stability.
(e) The procurement process shall include each of the following components:
(1) Solicitation, pre-qualification, and registration of bidders. The procurement
administrator shall disseminate information to potential bidders to promote a procurement
event, notify potential bidders that the procurement administrator may enter into a post-bid
price negotiation with bidders that meet the applicable benchmarks, provide supply
requirements, and otherwise explain the competitive procurement process. In addition to such
other publication as the procurement administrator determines is appropriate, this
information shall be posted on the Illinois Power Agencys and the Commissions websites. The
procurement administrator shall also administer the prequalification process, including
evaluation of credit worthiness, compliance with procurement rules, and agreement to the
standard form contract developed pursuant to paragraph (2) of this subsection (e). The
procurement administrator shall then identify and register bidders to participate in the
procurement event.
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 179 -
|
|
LRB095 11114 MJR 38234 a |
(2) Standard contract forms and credit terms and instruments. The procurement
administrator, in consultation with the utilities, the Commission, and other
interested parties and subject to Commission oversight, shall develop and provide standard
contract forms for the supplier contracts that meet generally accepted industry practices. Standard
credit terms and instruments that meet generally accepted industry practices shall be similarly
developed. The procurement administrator shall make available to the Commission all written
comments it receives on the contract forms, credit terms, or instruments. If the procurement
administrator cannot reach agreement with the applicable electric utility as to the contract terms
and conditions, the procurement administrator must notify the Commission of any disputed terms and
the Commission shall resolve the dispute. The terms of the contracts shall not be subject to
negotiation by winning bidders, and the bidders must agree to the terms of the contract in advance
so that winning bids are selected solely on the basis of price.
(3) Establishment of a market-based price benchmark. As part of the development of the
procurement process, the procurement administrator, in consultation with the Commission staff,
Agency staff, and the procurement monitor, shall establish benchmarks for evaluating the final
prices in the contracts for each of the products that
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 180 -
|
|
LRB095 11114 MJR 38234 a |
will be procured through the procurement process. The benchmarks shall be based on price data
for similar products for the same delivery period and same delivery hub, or other delivery hubs
after adjusting for that difference. The price benchmarks may also be adjusted to take into account
differences between the information reflected in the underlying data sources and the specific
products and procurement process being used to procure power for the Illinois utilities. The
benchmarks shall be confidential but shall be provided to, and will be subject to Commission review
and approval, prior to a procurement event.
(4) Request for proposals competitive procurement process. The procurement administrator
shall design and issue a request for proposals to supply electricity in accordance with each
utilitys procurement plan, as approved by the Commission. The request for proposals shall set
forth a procedure for sealed, binding commitment bidding with pay-as-bid settlement, and provision
for selection of bids on the basis of price.
(5) A plan for implementing contingencies in the event of supplier default or failure of
the procurement process to fully meet the expected load requirement due to insufficient supplier
participation, Commission rejection of results, or any other cause.
(i) Event of supplier default: In the event of
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 181 -
|
|
LRB095 11114 MJR 38234 a |
supplier default, the utility shall review the contract of the defaulting supplier to
determine if the amount of supply is 200 megawatts or greater, and if there are more than 60
days remaining of the contract term. If both of these conditions are met, and the default
results in termination of the contract, the utility shall immediately notify the Illinois
Power Agency that a request for proposals must be issued to procure replacement power, and
the procurement administrator shall run an additional procurement event. If the contracted
supply of the defaulting
supplier is less than 200 megawatts or there are less than 60 days remaining of the
contract term, the utility shall procure power and energy from the applicable regional transmission
organization market, including ancillary services, capacity, and day-ahead or real time energy, or
both, for the duration of the contract term to replace the contracted supply; provided, however,
that if a needed product is not available through the regional transmission organization market it
shall be purchased from the wholesale market.
(ii) Failure of the procurement process to fully meet the expected load requirement: If
the procurement process fails to fully meet the expected load requirement due to insufficient
supplier participation
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 182 -
|
|
LRB095 11114 MJR 38234 a |
or due to a Commission rejection of the procurement results, the procurement administrator, the
procurement monitor, and the Commission staff shall meet within 10 days to analyze potential causes
of low supplier interest or causes for the Commission decision. If changes are identified that
would likely result in increased supplier participation, or that would address concerns causing the
Commission to reject the results of the prior procurement event, the procurement administrator may
implement those changes and rerun the request for proposals process according to a schedule
determined by those parties and consistent with Section 1-75 of the Illinois Power Agency Act and
this subsection. In any event, a new request for proposals process shall be implemented by
the procurement administrator within 90 days after the determination that the
procurement process has failed to fully meet the expected load requirement.
(iii) In all cases where there is insufficient supply provided under contracts
awarded through the procurement process to fully meet the electric utilitys load
requirement, the utility shall meet the load requirement by procuring power and energy
from the applicable regional transmission organization market, including ancillary
services, capacity, and day-ahead or real time energy or both; provided, however, that
if
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 183 -
|
|
LRB095 11114 MJR 38234 a |
a needed product is not available through the regional
transmission organization market it shall be purchased
from the wholesale market.
(6) The procurement process described in this subsection is exempt from the requirements
of the Illinois Procurement Code, pursuant to Section 20-10 of
that Code.
(f) Within 2 business
days after opening the sealed bids, the procurement administrator shall submit a confidential
report to the Commission. The report shall contain the results of the bidding for each of the
products along with the procurement administrators recommendation for the acceptance and rejection
of bids based on the price benchmark criteria and other factors observed in the process. The
procurement monitor also shall submit a confidential report to the Commission within 2 business
days after opening the sealed bids. The report shall contain the procurement monitors assessment
of bidder behavior in the process as well as an assessment of the procurement administrators
compliance with the procurement process and rules. The Commission shall review the confidential
reports submitted by the procurement administrator and
procurement monitor, and shall accept or reject the recommendations of the
procurement administrator within 2 business days after receipt of the reports.
(g) Within 3 business days after the Commission decision approving the results of a
procurement event, the utility shall enter into binding contractual arrangements with the
winning
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 184 -
|
|
LRB095 11114 MJR 38234 a |
suppliers using the standard form contracts; except that the utility shall not be required
either directly or indirectly to execute the contracts if a tariff that is consistent with
subsection (1) of this Section has not been approved and placed into effect for that utility.
(h) The names of the successful bidders and the load weighted average of the winning bid
prices for each contract type and for each contract term shall be made available to the public at
the time of Commission approval of a procurement event. The Commission, the procurement monitor,
the procurement administrator, the Illinois Power Agency, and all participants in the procurement
process shall maintain the confidentiality of all other supplier and bidding information in a
manner consistent with all applicable laws, rules, regulations, and tariffs. Confidential
information, including the confidential reports submitted by the procurement administrator and
procurement monitor pursuant to subsection (f) of this Section, shall not be made publicly
available and shall not be discoverable by any party in any proceeding, absent a compelling
demonstration of need, nor shall those reports be admissible in any proceeding other than one for
law enforcement purposes.
(i) Within 2 business days after a Commission decision approving the results of a
procurement event or such other date as may be required by the Commission from time to time, the
utility shall file for informational purposes with the
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 185 -
|
|
LRB095 11114 MJR 38234 a |
Commission its actual or estimated retail supply charges, as applicable, by customer supply
group reflecting the costs associated with the procurement and computed in accordance with the
tariffs filed pursuant to subsection (1) of this Section and approved by the Commission.
(j) Within 60 days following the effective date of this amendatory Act, each electric
utility that on December 31, 2005 provided electric service to at least 100,000 customers in
Illinois shall prepare and file with the Commission an initial procurement plan, which shall
conform in all material respects to the requirements of the procurement plan set forth in
subsection (b); provided, however, that the Illinois Power Agency Act shall not apply to the
initial procurement plan prepared pursuant to this subsection. The initial procurement plan shall
identify the portfolio of power and energy products to be procured and delivered for the period
June 2008 through May 2009, and shall identify the proposed procurement administrator, who shall
have the same experience and expertise as is required of a procurement administrator hired pursuant
to Section 1-75 of the Illinois Power Agency Act. Copies of the procurement plan shall be posted
and made publicly available on the Commissions website. The initial procurement plan may include
contracts for renewable resources that extend beyond May 2009.
(i) Within 14 days following filing of the initial
procurement plan, any person may file a detailed objection
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 186 -
|
|
LRB095 11114 MJR 38234 a |
with the Commission contesting the procurement plan submitted by the electric
utility. All objections to the
electric utilitys plan shall be specific, supported by data or other detailed
analyses. The electric utility may file a response to any objections to its procurement plan
within 7 days after the date objections are due to be filed. Within 7 days after the date the
utilitys response is due, the Commission shall determine whether a hearing is necessary. If
it determines that a hearing is necessary, it shall require the hearing to be completed and
issue an order on the procurement plan within 60 days after the filing of the procurement
plan by the electric utility.
(ii) The order shall approve or modify the procurement plan, approve an independent
procurement administrator, and approve or modify the electric utilitys tariffs that are proposed
with the initial procurement plan. The Commission shall approve the procurement plan if the
Commission determines that it will ensure adequate, reliable, affordable, efficient, and
environmentally sustainable electric service at the lowest total cost over time, taking into
account any benefits of price stability.
(k) In order to promote price stability for residential
and small commercial customers during the transition to competition in Illinois, and
notwithstanding any other provision of this Act, each electric utility subject to this Section
shall enter into one or more multi-year financial swap
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 187 -
|
|
LRB095 11114 MJR 38234 a |
contracts that become effective on the effective date of this amendatory Act. These contracts
may be executed with generators and power marketers, including affiliated interests of the electric
utility. These contracts shall be for a term of no more than 5 years and shall, for each respective
utility or for any Illinois electric utilities that are affiliated by virtue of a common parent
company and that are thereby considered a
single electric utility for purposes of this subsection (k), not exceed in the aggregate
3,000 megawatts for any hour of the year. The contracts shall be financial contracts and not energy
sales contracts. The contracts shall be executed as transactions under a negotiated master
agreement based on the form of master agreement for financial swap contracts sponsored by the
International Swaps and Derivatives Association, Inc. and shall be considered pre-existing
contracts in the utilities procurement plans for residential and small commercial customers. Costs
incurred pursuant to a contract authorized by this subsection (k) shall be deemed prudently
incurred and reasonable in amount and the electric utility shall be entitled to full cost recovery
pursuant to the tariffs filed with the Commission.
(l) An electric utility shall recover its costs of procuring power and energy under
this Section. The utility shall file with the initial procurement plan its proposed tariffs
through which its costs of procuring power that are incurred pursuant to a Commission-approved
procurement plan
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 188 -
|
|
LRB095 11114 MJR 38234 a |
and
those other costs identified in this subsection (l), will be recovered. The tariffs shall
include a formula rate or charge designed to pass through both the costs incurred by the utility in
procuring a supply of electric power and energy for the applicable customer classes with no mark-up
or return on the price paid by the utility for that supply, plus any just and reasonable costs that
the utility incurs in arranging and providing for the supply of electric power and energy. The
formula rate or charge shall also contain provisions that ensure that its application does not
result in over or under recovery due to changes in customer usage and demand patterns, and that
provide for the correction, on at least an annual basis, of any accounting errors that may occur. A
utility shall recover through the tariff all reasonable costs incurred to
implement or comply with any procurement plan that is developed and put into effect pursuant to
Section 1-75 of the Illinois Power Agency Act and this Section, including any fees assessed by the
Illinois Power Agency, costs associated with load balancing, and contingency plan costs. The
electric utility shall also recover its full costs of procuring electric supply for which it
contracted before the effective date of this Section in conjunction with the provision of full
requirements service under fixed-price bundled service tariffs subsequent to December 31, 2006. All
such costs shall be deemed to have been prudently incurred. The pass-through tariffs that are filed
and approved pursuant to this Section shall not be
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SB1592ham005
|
|
- 189 -
|
|
LRB095 11114 MJR 38234 a |
subject to review under, or in any way limited by, Section 16-111(i) of this Act.
(m) The Commission has the authority to adopt rules to carry out the provisions of
this Section. For the public interest, safety, and welfare, the Commission also has authority
to adopt rules to carry out the provisions of this Section on an emergency basis immediately
following the effective date of this amendatory Act.
(n) Notwithstanding any other provision of this Act, any affiliated electric utilities
that submit a single procurement plan covering their combined needs may procure for those combined
needs in conjunction with that plan, and may enter jointly into power supply contracts, purchases,
and other procurement arrangements, and allocate capacity and energy and cost responsibility
therefor among themselves in proportion to their requirements.
(o) On
or before June 1 of each year, the Commission shall hold an informal hearing for
the purpose of receiving comments on the prior years procurement process and any recommendations
for change.
(p) An electric utility subject to this Section may propose
to invest, lease, own, or operate an electric generation facility as part of its
procurement plan, provided the utility demonstrates that such facility is the least-cost option to
provide electric service to eligible retail customers. If the facility is shown to be the
least-cost option and is included
SB1592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 190 -
|
|
LRB095 11114 MJR 38234 a |
in a procurement plan prepared in accordance with Section 1-75 of the Illinois Power Agency Act
and this Section, then the electric utility shall make a filing pursuant to Section 8-406 of the
Act, and may request of the Commission any statutory relief required thereunder. If the Commission
grants all of the necessary approvals for the proposed facility, such supply shall thereafter be
considered as a pre-existing contract under subsection (b) of this Section. The Commission shall in
any order approving a proposal under this subsection specify how the utility will recover the
prudently incurred costs of investing in, leasing, owning, or operating such generation facility
through just and reasonable rates charged to eligible retail customers. Cost recovery for
facilities included in the utilitys procurement plan pursuant to this subsection shall not be
subject to review under or in any way limited by the provisions of Section 16-111(i) of this Act.
Nothing in this Section is intended to prohibit a utility from filing for a fuel adjustment clause
as is otherwise permitted under Section 9-220 of this Act.
(220 ILCS 5/16-111.5A new)
Sec. 16-111.5A. Provisions relating to electric rate relief.
(a) The General Assembly finds that action must be taken in order to mitigate the 2007
electric rate increases approved for residential and certain nonresidential customers served by
the
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 191 -
|
|
LRB095 11114 MJR 38234 a |
States largest electric utilities in 2007. The General Assembly further finds that
although various means of providing rate relief have been proposed, including imposition of a
rate freeze on the electric utilities or a tax on generation within the State, the
establishment of voluntary rate relief programs provides the most immediate and certain means
of providing that rate relief. Accordingly, if the residential customer electric service rates
that were charged to residential customers beginning January 2, 2007 by an electric utility
that on December 31, 2005 provided electric service to at least 100,000 customers in Illinois
resulted in an annual increase of more than 20% in an electric utilitys average rate charged
to residential customers for bundled electric service, those electric utilities and their
holding companies or other affiliates, and any other company owning generation in this State
or its affiliates, may, notwithstanding any other provisions of this Act, and without
obtaining any approvals from the Commission or any other agency, regardless of whether any
such approval would otherwise be required, establish and make payments to provide funds that
can be used to provide rate relief beginning on the effective date of this amendatory Act of
the 95th General Assembly through July 31, 2011.
(b) For purposes of this Section, the Ameren Utilities
means Illinois Power Company, Central Illinois Public Service
Company, and Central Illinois Light Company.
(c) For purposes of this Section, the Generators means
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 192 -
|
|
LRB095 11114 MJR 38234 a |
Exelon Generation Company, LLC; Ameren Energy Resources Generating Company; Ameren
Energy Marketing Company; Ameren
Energy Generating Company; MidAmerican Energy Company; Midwest Generation, LLC; and
Dynegy Holdings Inc.; and may include non-utility affiliates of the entities named in this
subsection.
(d) For purposes of this Section, Rate Relief Agreements
means the 2 Rate Relief Funding Agreements, the Escrow Funding
Agreement, and the Illinois Power Agency Funding Agreement that
Commonwealth Edison Company, the Ameren Utilities, and
Generators have entered into with the Illinois Attorney General
on behalf of the People of the State of Illinois for the
purpose of providing $1,001,000,000 to be used to fund rate
relief programs for customers of Commonwealth Edison Company
and the Ameren Utilities and for the Illinois Power Agency
Trust Fund and that become effective on the effective date of
this amendatory Act of the 95th General Assembly. The Rate
Relief Agreements have been filed with the Illinois Secretary
of State Index Department and designated as 95-GA-C01 through
95-GA-C04 inclusive. The Illinois Attorney General has the
right to enforce the provisions of all of the Rate Relief
Agreements on behalf of the People of the State of Illinois or
the Illinois Power Agency, or both, as appropriate.
(e) Subject to the terms, conditions, and contingencies of
the Rate Relief Agreements, Commonwealth Edison Company will
apply a total of $488,000,000 in rate relief to residential and
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 193 -
|
|
LRB095 11114 MJR 38234 a |
certain nonresidential customers from 2007 through 2010. Commonwealth Edison Company will
apply bill credits for all of its residential customers in its service territory in the
following amounts: $250,000,000 in 2007, $125,500,000 in 2008, and
$36,000,000 in 2009. Any
undisbursed rate relief funds shall be applied to the targeted programs. Commonwealth Edison
Company will provide rate relief for residential and certain nonresidential customers through
targeted programs in the following amounts: $33,000,000 in 2007,
$18,000,000 in 2008,
$15,500,000 in 2009, and $10,000,000 in 2010. Subject to the terms, conditions, and
contingencies of the Rate Relief Agreements, the targeted programs for 2007 consist of the
following, some of which are already underway and, in the aggregate, therefore total more
than $33,000,000:
(1) an electric space heating customer relief program
costing approximately $8,000,000 designed to lower the
average percentage increase of residential electric space
heating customers to rate increases similar to other
residential customers;
(2) a summer assistance program costing approximately
$10,300,000 for working families and low-income customers,
including low-income seniors;
(3) a residential rate relief program costing
approximately $5,500,000 for working families and
low-income customers, including low-income seniors, with
higher than average rate increases (over 30%);
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 194 -
|
|
LRB095 11114 MJR 38234 a |
(4) a residential special hardship program costing
approximately $5,000,000 to address special circumstances
and hardships;
(5) a nonresidential special hardship program costing
approximately $1,500,000 to address special circumstances
and hardships;
(6) a relief program for the common area accounts of
apartment building owners and condominium associations
costing approximately $4,500,000 designed to reduce rate
increases for these customers to rate increases similar to
those for residential customers and to mitigate the impact
of their rate increase;
(7) a weatherization assistance program for electric
space heating low-income customers costing approximately
$3,900,000 designed to provide energy efficiency assistance;
and
(8) energy efficiency, environmental, education, and assistance programs costing
approximately $5,000,000 designed to promote the use of energy efficiency programs and
services by residential customers, maintenance and upgrades of a website that allows
those customers to analyze their energy usage and provides incentives for the purchase of
energy efficient products, the provision of energy efficient light bulbs to residential
customers at a discount, and free efficient light bulbs and other assistance to
low-income customers.
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 195 -
|
|
LRB095 11114 MJR 38234 a |
Based on the outcome of these targeted programs, Commonwealth Edison Company
will design and implement, subject to the terms, conditions, and contingencies of the Rate
Relief Agreements, targeted programs for working families, seniors, and other customers in
need in 2008, 2009, and 2010.
(f) Subject to the terms, conditions, and contingencies of the Rate Relief
Agreements, the Ameren Utilities will apply a total of $488,000,000 in rate relief to
residential and certain nonresidential customers from 2007 through 2010. The Ameren Utilities
will apply bill credits for all of their residential customers in their service territories in
the following aggregate amounts: $213,000,000 in 2007, $109,000,000 in 2008, and $78,000,000
in 2009. The Ameren Utilities will apply bill credits to certain nonresidential customers in
the following aggregate amounts: $26,000,000 in 2007, $11,000,000 in
2008, and $11,000,000 in
2009. Any undisbursed rate relief funds shall be applied to the targeted programs. The Ameren
Utilities will provide rate relief for residential and certain nonresidential customers
through targeted programs in the following amounts: $13,500,000 in
2007, $13,500,000 in
2008,
$7,500,000 in 2009, and $5,500,000 in 2010. Subject to the terms, conditions and
contingencies of the Rate Relief Agreements, the targeted programs consist of the following
for 2007:
(1) a
cooling assistance program costing approximately $2,000,000 to provide
donations to the Low Income Home
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 196 -
|
|
LRB095 11114 MJR 38234 a |
Energy Assistance Program;
(2) a bill payment assistance program costing
approximately $2,000,000 for working families and
low-income customers, including low-income seniors;
(3) a residential special hardship program costing
approximately $2,000,000 to address special circumstances
and hardships;
(4) a nonresidential special hardship program costing
approximately $2,000,000 to address special circumstances
and hardships;
(5) a percent-of-income payment program pilot costing
approximately $2,500,000 that will be designed to
determine for low-income electric space heating customers
if paying a percentage of income for their electricity will
make electricity more affordable and promote regular
paying habits;
(6) a weatherization assistance program for all
electric space heating low-income customers costing
approximately $1,000,000 designed to provide energy
efficiency assistance;
(7) a compact fluorescent light bulb distribution
program costing approximately $1,000,000 designed to
provide energy efficient light bulbs to residential
customers at a discount; and
(8) a municipal street lighting conversion program costing approximately $ 1,000,000 to convert existing
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 197 -
|
|
LRB095 11114 MJR 38234 a |
street lights to more efficient lights at a discount.
Based on the outcome of these targeted programs, the Ameren Utilities will design and
implement, subject to the terms, conditions, and contingencies of the Rate Relief Agreements,
targeted programs for working families, seniors, and other customers
in need in 2008, 2009,
and 2010.
In addition, the Ameren Utilities voluntarily agree to waive outstanding late payment
charges associated with unpaid electric bills for usage on and after January 2, 2007, through
the September 2007 billing period.
(g) Programs that use funds that are provided by electric utilities and their holding
companies or other affiliates, and any other company owning generation in this State or its
affiliates, to reduce utility bills, or to otherwise offset costs incurred by the utilities in
mitigating rate increases for certain customer groups, may be implemented through tariffs that
are filed with and reviewed by the Commission. If a utility elects to file tariffs with the
Commission to implement all or a portion of the programs, those tariffs shall, regardless of
the date actually filed, be deemed accepted and approved, and shall become effective, on the
effective date of this amendatory Act of the 95th General Assembly. The electric utilities
whose customers benefit from the funds that are disbursed as contemplated in this Section
shall file annual reports documenting the disbursement of those funds with the Commission and
the Illinois Attorney General. The Commission
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 198 -
|
|
LRB095 11114 MJR 38234 a |
has the authority to audit disbursement of the funds to ensure
they were disbursed consistently with this Section.
(h) Nothing in this Section shall be interpreted to limit the Commissions general
authority over ratemaking.
(i) Subject to the terms, conditions, and contingencies of the Rate Relief
Agreements, the Generators are providing a total of $25,000,000 to the Illinois Power Agency
Trust Fund.
(j) None of the contributions by Commonwealth Edison Company or the Ameren Utilities
pursuant to this Section may be recovered in rates.
(k) Nothing in this Section shall be interpreted to limit the authority or right of
the Illinois Attorney General, under the terms of the Rate Relief Agreements, to review or
audit documents, make demands, or file suit or to take other action to enforce the provisions
of the Rate Relief Agreements.
(220 ILCS 5/16-111.6 new)
Sec. 16-111.6. Termination of utility service to electric space-heating customers.
Notwithstanding any other provision of this Act or any other law to the contrary, a public
utility that, on December 31, 2005, served more than 100,000 electric customers in Illinois
may not, prior to September 1, 2007, terminate electric service to a residential electric
space-heating customer for non-payment. For 2007 and every year thereafter, such an electric
utility shall not terminate electric service to a residential space-heating customer for
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 199 -
|
|
LRB095 11114 MJR 38234 a |
non-payment from December 1 through March 31.
(220 ILCS 5/16-113)
Sec. 16-113. Declaration of service as a competitive service.
(a) An electric utility may, by petition, request the Commission to declare a tariffed
service that is provided by the electric utility, and that has not otherwise been
declared
to be competitive, to be a competitive service. The electric utility shall give
notice of its petition to the public in the same manner that public notice is provided for
proposed general increases in rates for tariffed services, in accordance with rules and
regulations prescribed by the Commission. The Commission shall hold a hearing and on
the petitionif a hearing is deemed necessary by the Commission. The Commission shall declare
the class of tariffed service to be a competitive service for some identifiable
customer segment or group of customers, or some clearly defined geographical area within the
electric utilitys service area, only after the electric utility demonstrates that at
least 33% of the customers in the electric utilitys service area that are eligible to take
the class of tariffed service instead take service from alternative retail electric suppliers,
as defined in Section 16-102, and that at least 3 alternative retail electric suppliers
provide service that is comparable to the class of tariffed service to those customers in the
electric utilitys service area that do
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 200 -
|
|
LRB095 11114 MJR 38234 a |
not take service from the electric utility, if the service or a
reasonably equivalent substitute service is reasonably available to the customer segment or
group or in the defined geographical area at a comparable price from one or more
providers other than the electric utility or an affiliate of the electric utility, and the
electric utility has lost or there is a reasonable likelihood that the electric utility will
lose business for the service to the other provider or providers; provided, that the
Commission may not declare the provision of electric power and energy to be competitive
pursuant to this subsection with respect to (i) any retail customer or group of
retail customers that is not eligible pursuant to Section 16 104 to take delivery services
provided by the electric utility and (ii) any residential and small commercial retail
customers prior to the last date on which
such customers are required to pay transition charges. In determining whether to grant or
deny a petition to declare the provision of electric power and energy competitive, the
Commission shall consider, in applying the above criteria, whether there is adequate
transmission capacity into the service area of the petitioning electric utility to make
electric power and energy reasonably available to the customer segment or group or in the
defined geographical area from one or more providers other than the electric utility or an
affiliate of the electric utility, in accordance with this subsection. The Commission shall
make its determination and
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 201 -
|
|
LRB095 11114 MJR 38234 a |
issue its final order declaring or refusing to declare the service to be a competitive service
within 180 120 days following the date that the petition is filed,or otherwise the
petition shall be deemed to be granted; provided, that if the
petition is deemed to be granted
by operation of law, the Commission shall not thereby be precluded from finding and
ordering, in a subsequent proceeding initiated by the Commission, and after notice and
hearing, that the service is not competitive based on the criteria set forth in this
subsection.
(b) Except as otherwise set forth in this Section, any Any customer except a
customer identified in subsection (c) of Section 16-103 who is taking a tariffed service that
is declared to be a competitive service pursuant to subsection (a) of this Section shall be
entitled to continue to take the service from the electric utility on a tariffed basis for a
period of 3 years following the date that the service is declared competitive, or such other
period as is stated in the electric utilitys tariff pursuant to Section 16-110. This
subsection shall not require the electric utility to offer or provide on a tariffed basis any
service to any customer (except those customers identified in subsection (c) of Section
16-103)
that was not taking such service on a tariffed basis on the date the service was declared
to be competitive.
Customers of an electric utility that on December 31, 2005 provided electric service
to at least 2,000,000 customers in
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
09500SBl592ham005
|
|
- 202 -
|
|
LRB095 11114 MJR 38234 a |
Illinois and (i) whose service is declared to be a competitive service pursuant to
subsection (f) of this Section, (ii) that have peak demand of 400 kilowatts and above, and
(iii) that were taking that service from the utility on the effective date of this amendatory
Act through fixed-price bundled service tariffs, shall be entitled to continue to take the
service from the electric utility on a tariffed basis through the end of the May 2008 billing
period. Customers of an electric utility that on December 31, 2005 provided electric service
to at least 2,000,000 customers in Illinois and (i) whose service is declared to be a
competitive service pursuant to subsection (g) of this Section, (ii) that have peak demand of
100 kilowatts and above but less than 400 kilowatts, and (iii) that were taking that service
from the utility on the effective date of this amendatory Act through fixed-price bundled
service tariffs, shall be entitled to continue to take the service from the electric utility
on a tariffed basis through the end of the May 2010 billing period.
Customers of an electric utility that on December 31, 2005 provided electric service
to 2,000,000 or fewer customers but more than 100,000 customers in Illinois and (i) whose
service is declared to be a competitive service pursuant to subsection (f) of this Section,
(ii) that have peak demand of one megawatt and above, and (iii) that were taking that service
from the utility on the effective date of this amendatory Act through fixed-price bundled
service tariffs, shall be entitled to
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 203 -
|
|
LRB095 11114 MJR 38234 a |
continue to take the service from the electric utility on a tariffed basis through
the end of May 2008. Customers of an electric utility that on December 31, 2005 provided
electric service to 2,000,000 or fewer customers but more than 100,000 customers in the State
of Illinois and (i) whose service is declared to be a competitive service pursuant to
subsection (f) of this Section, (ii) that have peak demand of 400 kilowatts and above but less
than one megawatt, and (iii) that were taking that service from the utility on the effective
date of this amendatory Act through fixed-price bundled service tariffs, shall be entitled to
continue to take the service from the electric utility on a tariffed basis through the end of
May 2010.
(c) If the Commission denies a petition to declare a
service to be a competitive service, or determines in a
separate proceeding that a service is not competitive based on
the criteria set forth in subsection (a), the electric utility
may file a new petition no earlier than 6 months following the
date of the Commissions order, requesting, on the basis of
additional or different facts and circumstances, that the
service be declared to be a competitive service.
(d) The Commission shall not deny a petition to declare a
service to be a competitive service, and shall not find that a
service is not a competitive service, on the grounds that it
has previously denied the petition of another electric utility
to declare the same or a similar service to be a competitive
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 204 -
|
|
LRB095 11114 MJR 38234 a |
service or has previously determined that the same or a similar service provided by
another electric utility is not a competitive service.
(e) An electric utility may declare a service, other than delivery services or the
provision of electric power or energy,
to be competitive by filing with the Commission at least 14 days prior to the date on
which the service is to become competitive a notice describing the service that is being
declared competitive and the date on which it will become competitive; provided, that any
customer who is taking a tariffed service that is declared to be a competitive service
pursuant to this subsection (e) shall be entitled to continue to take the service from the
electric utility on a tariffed basis until the electric utility files, and the Commission
grants, a petition to declare the service competitive in accordance with subsection (a) of
this Section. The Commission shall be authorized to find and order, after notice and hearing
in a subsequent proceeding initiated by the Commission, that any service declared to be
competitive pursuant to this subsection (e) is not competitive in accordance with the criteria
set forth in subsection (a) of this Section.
(f) As of the effective date of this amendatory Act, the provision of electric power
and energy, whether through fixed-price bundled service tariffs or otherwise, to those retail
customers with peak demands of 400 kilowatts and above that are
served by an electric utility
that on December 31,
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 205 -
|
|
LRB095 11114 MJR 38234 a |
2005 served more than 100,000 customers in its service territory in Illinois shall
be deemed to be, and is declared to be, a competitive service.
(g) An electric utility that provided electric service to at least 100,000 customers
in its service territory in Illinois as of December 31, 2005 may seek to declare the provision
of electric power and energy, whether through fixed-price bundled service tariffs or
otherwise, to those retail customers with peak demand of 100 kilowatts and above but less than
400 kilowatts to be competitive by filing with the Commission at least 60 days prior to the
date on which the service is to become competitive a petition with attached analyses
demonstrating that at least 33% of those customers in the electric utilitys service
area that are eligible to take the class of tariffed service instead take service from
alternative retail electric suppliers, as defined in Section 16-102, and that at least 3
alternative retail electric suppliers provide service that is comparable to that tariffed
service to those customers in the electric utilitys service area that do not take service
from the electric utility. The electric utility shall give notice of its petition to the
public in the same manner that public notice is provided for proposed general increases in
rates for tariffed services, in accordance with rules and regulations prescribed by the
Commission. Within 14 days following filing of the petition, any person may file a detailed
objection with the Commission contesting the analyses
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 206 -
|
|
LRB095 11114 MJR 38234 a |
submitted by the electric utility with its petition. All objections to the electric
utilitys petition shall be specific, supported by data or other detailed analyses, and
limited to whether the electric utility has met the standard set forth in this subsection (g).
The electric utility may file a response to any objections to its petition within 7 days after
the deadline for objections. The Commission shall declare the provision of electric power and
energy by the electric utility to those retail customers with peak demand of 100 kilowatts and
above but less than 400 kilowatts to be a competitive service within 30 days after the filing
of the petition if it finds that the electric utility has met the standard set forth in this
subsection (g). If, however, the Commission finds that there are material issues of disputed
fact, it may require the parties to submit additional information, including through
additional filings or as part of an evidentiary hearing. If the Commission has required the
parties to submit additional information, it shall issue an order within 60 days after the
filing of the petition stating
whether the provision of electric power and energy by the utility to those retail
customers with peak demand of 100 kilowatts and above but less than 400 kilowatts has
been declared to be a competitive service.
(h) Until
July 1, 2012, no electric utility that on December 31, 2005 provided
electric service to at least 100,000 customers in its service territory in Illinois may seek
to
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 207 -
|
|
LRB095 11114 MJR 38234 a |
declare the class of tariffed service for residential customers and those
non-residential customers with peak demand of less than 100 kilowatts to be a competitive
service.
(Source: P.A. 90-561, eff. 12-16-97.)
(220 ILCS 5/16-126.1 new)
Sec. 16-126.1. Regional transmission organization memberships. The State shall not
directly or indirectly prohibit an electric utility that on December 31, 2005 provided
electric service to at least 100,000 customers in Illinois from membership in a Federal Energy
Regulatory Commission approved regional transmission organization of its choosing. Nothing in
this Section limits any authority the Commission otherwise has to regulate that electric
utility. This Section ceases to be effective on July 1, 2022 unless extended by the General
Assembly by law.
(220 ILCS 5/16-127)
Sec. 16-127. Environmental disclosure.
(a) Effective January 1, 1999, every electric utility and alternative retail electric
supplier shall provide the following information, to the maximum extent practicable, with its
bills to its customers on a quarterly basis:
(i) the known sources of electricity supplied,
broken-out by percentages, of biomass power, coal-fired
power, hydro power, natural gas-fired power, nuclear
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 208 -
|
|
LRB095 11114 MJR 38234 a |
power, oil-fired power, solar power, wind power and other resources, respectively;
and
(ii)
a pie-chart that which graphically depicts the percentages of the
sources of the electricity supplied as set forth in subparagraph (i) of this subsection;
and.
(iii) a pie-chart that graphically depicts the quantity of renewable energy
resources procured pursuant to Section 1-75 of the Illinois Power Agency Act as a
percentage of electricity supplied to serve eligible retail customers as defined in
Section 16-111.5(a) of this Act.
(b) In addition, every electric utility and alternative
retail electric supplier shall provide, to the maximum extent
practicable, with its bills to its customers on a quarterly
basis, a standardized chart in a format to be determined by the
Commission in a rule following notice and hearings which
provides the amounts of carbon dioxide, nitrogen oxides and
sulfur dioxide emissions and nuclear waste attributable to the
known sources of electricity supplied as set forth in
subparagraph (i) of subsection (a) of this Section.
(c) The electric utilities and alternative retail electric
suppliers may provide their customers with such other
information as they believe relevant to the information
required in subsections (a) and (b) of this Section.
(d) For the purposes of subsection (a) of this Section,
biomass means dedicated crops grown for energy production and
SBl592ham005 95TH GENERAL ASSEMBLY
|
|
|
|
|
|
|
|
|
|
09500SBl592ham005
|
|
- 209 -
|
|
LRB095 11114 MJR 38234 a |
organic wastes.
(e) All of the information provided in subsections (a) and (b) of this Section shall be
presented to the Commission for inclusion in its World Wide Web Site.
(Source: P.A. 90-561, eff.
12-16-97; 90-624, eff. 7-10-98.)
ARTICLE 99
Section 99-97. Severability. The provisions of this Act are severable under Section 1.31 of
the Statute on Statutes.
Section 99-99. Effective date. This Act takes effect upon becoming law..
exv99w2
Exhibit 99.2
L R B 0 9 5 1 1 1 1 4 M J R 3 8 2 8 0 a
Rep.
David E. Miller
Filed:
7/26/2007
09500SB1592ham006 LRB095 11114 MJR 38280 a
AMENDMENT TO SENATE BILL 1592
AMENDMENT NO. ___. Amend Senate Bill 1592, AS AMENDED, with reference to page and line
numbers of House Amendment No. 5, on page 47, below line 3, by inserting the following:
Section 1-127. Minority, female, and disabled persons
businesses; reports.
(a) The Director of the Illinois Power Agency, or his or her designee, when offering bids for
professional services, shall conduct outreach to minority owned businesses, female owned
businesses, and businesses owned by persons with disabilities. Outreach shall include, but is not
limited to, advertisements in periodicals and newspapers, mailings, and other appropriate media.
(b) The Director or his or her designee shall, upon request, provide technical assistance to
minority owned businesses, female owned businesses, and businesses owned by persons with
disabilities seeking to do business with the
09500SB1592ham006
- -2- LRB095 11114 MJR 38280 a
Agency.
(c) The Director or his or her designee, upon request, shall conduct post-bid reviews with
minority owned businesses, female owned businesses, and businesses owned by persons with
disabilities whose bids were not selected by the Agency. Post-bid reviews shall provide a business
with detailed and specific reasons why the bid of that business was rejected and concrete
recommendations to improve its bid application on future Agency professional services
opportunities.
(d) The Agency shall report annually to the Governor and the General Assembly by July 1. The
report shall identify the businesses that have provided bids to offer professional services to the
Agency and shall also include,
but not be limited to, the following information:
(1) whether or not the businesses are minority owned businesses, female owned businesses,
or businesses owned by persons with disabilities;
(2) the percentage of professional service contracts that were awarded to minority owned
businesses, female owned businesses, and businesses owned by persons with disabilities as
compared to other businesses; and
(3) the actions the Agency has undertaken to increase the use of the minority owned
businesses, female owned businesses, and businesses owned by persons with disabilities in
professional service contracts.
(e) In this Section, professional services means
09500SB1592ham006
- -3- LRB095 11114 MJR 38280 a
services that use skills that are predominantly
mental or intellectual, rather than physical or manual, including, but not limited to, accounting,
architecture, consulting, engineering, finance, legal, and marketing. Professional services does
not include bidders into the competitive procurement process pursuant to Section 16-111.5 of the
Public Utilities Act.; and
on page 130, line 18, after demand response, by inserting